Province | Subbasin | % |
---|---|---|
Mountain Snake | Salmon | 100.00% |
Previous: | Next: |
---|---|
n/a |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Visitation Log | A: 26. Investigate Trespass on Easement Property | 08/31/2011 | 08/11/2011 | |
BPA required administrative documents | B: 119. Manage and Administer Projects | 05/31/2011 | 07/29/2011 | |
Final Habitat Restoration Specification for Site 3 | D: 175. Develop engineering designs for Site 3 (subcontractor TBD) | 06/15/2011 | ||
Write Conservation Plan including grazing plan for Salmon River/Slough Fence project | E: 174. Conservation Planning Provided by NRCS | 08/29/2011 | 08/22/2011 | |
Obtain required permits (404, etc.) allowing restoration activities | F: 165. Permits, etc. needed for restoration activities | 08/01/2011 | ||
Install 6500 feet of jack post and pole fence along a Slough and the Salmon River | G: 40. Install Fence on Main Stem Salmon River | 08/31/2011 | 08/29/2011 | |
Reconnected side-channel of the Salmon River near Challis, ID | I: 30. Cost-share to IDFG for 12-mile side channel reconnect near Hannah Slough | 08/15/2011 | 08/15/2011 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened) |
|
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened) |
|
Sockeye (O. nerka) - Snake River ESU (Endangered) |
|
Steelhead (O. mykiss) - Snake River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 26 | Investigate Trespass on Easement Property | 09/01/2010 | ||||||
B | 119 | Manage and Administer Projects | 09/01/2010 | ||||||
C | 132 | Submit Annual Report for the period (October 2009 thru September 2010) | 09/01/2010 | ||||||
D | 175 | Develop engineering designs for Site 3 (subcontractor TBD) | 09/01/2010 | ||||||
E | 174 | Conservation Planning Provided by NRCS | 09/01/2010 | ||||||
F | 165 | Permits, etc. needed for restoration activities | 09/01/2010 | ||||||
G | 40 | Install Fence on Main Stem Salmon River | 02/14/2011 | ||||||
H | 185 | Periodic Status Reports for BPA | 09/01/2010 | ||||||
I | 30 | Cost-share to IDFG for 12-mile side channel reconnect near Hannah Slough | 02/14/2011 |