Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 50973: 1990-055-00 EXP IDFG ID STEELHEAD M & E STUDIES
Project Number:
Title:
Idaho Salmon & Steelhead Monitoring and Evaluation Studies (M&E)
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
50973
Contract Title:
1990-055-00 EXP IDFG ID STEELHEAD M & E STUDIES
Contract Continuation:
Previous: Next:
45642: 1990-055-00 EXP ID STEELHEAD M&E STUDIES
  • 55728: 1990-055-00 EXP ID STEELHEAD M&E STUDIES
Contract Status:
Closed
Contract Description:
The purpose of the Idaho Steelhead Monitoring & Evaluation Studies (ISMES) is to monitor and evaluate of the status and trends of wild steelhead populations in Idaho. We propose to retain most of the objectives from the last proposal (2007-2009) but they have been expanded to incorporate the mandate from the Idaho Fish Accord to assess the status of wild steelhead in Idaho. The objectives are re-framed to be consistent with the Snake River monitoring and evaluation goals developed by the RPA Workgroup, with the strategies put forth by the Snake River basin fish managers, and with the guidance from NOAA Fisheries (Crawford and Rumsey 2009).

We will assess abundance, productivity, spatial structure, and diversity at the population and major population group scales. We will also assess abundance, productivity, and diversity for the Snake River Distinct Population Segment based on samples from Lower Granite Dam. This element will include both adult and smolt samples. To provide DPS-level monitoring, ISMES will continue to sample adult steelhead at Lower Granite Dam, expand activities to collect smolt samples in coordination with Project 198712700, but the genetic elements have been transferred to a new project (201002600). We will collaborate with this project to break aggregate abundance estimates and age composition into major population groups and, in some cases, populations. Over time, productivity will be assessed. Intensive monitoring efforts will continue (at Fish Creek, Rapid River and Big Creek) as will recent expansions in regards to coordination and support of other intensive steelhead monitoring work in Idaho. We will estimate adult abundance, length distribution, sex ratio, and age composition; smolt abundance, length structure, and age composition; survival of juveniles from spawning stream to Lower Granite and smolt-to-adult return rate. Current extensive monitoring elements are retained (dispersed parr surveys to assess spatial structure and stream water temperature monitoring), as are the population-level genetic work. Genetic elements will emphasize maintenance of the genetic baseline used by project 201002600 as well as genetic diversity.

This statement of work will be organized in accordance with the 2010 proposal. There are 5 objectives:
Objective 1: Monitor status and trends of wild steelhead at Lower Granite Dam. This effort is funded by Idaho Fish Accord monies.
Objective 2:  Conduct intensive, high-precision (fish in, fish out) monitoring of steelhead in Fish Creek (Lochsa population), Rapid River (Little Salmon population), and Big Creek (Lower Middle Fork Salmon population).
Objective 3:  Support and coordinate intensive, high-precision (fish in, fish out) monitoring of wild steelhead at other locations in Idaho. ISMES is the central repository of information for wild steelhead in Idaho. The goal of this work is to collect information where wild steelhead are being passed above hatchery weirs.
Objective 4:  Conduct extensive monitoring in selected streams (snorkel surveys and temperature monitoring).
Objective 5: Monitor temporal and spatial genetic patterns of steelhead populations in Idaho.
Account Type(s):
Expense
Contract Start Date:
01/01/2011
Contract End Date:
12/31/2011
Current Contract Value:
$783,590
Expenditures:
$783,590

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Brenda Aguirre Bonneville Power Administration Yes Env. Compliance Lead baguirre@bpa.gov (503) 230-5928
Jeff Allen Northwest Power and Conservation Council No Interested Party jallen@nwcouncil.org (208) 334-6972x11
Matthew Campbell Idaho Department of Fish and Game (IDFG) Yes Interested Party matthew.campbell@idfg.idaho.gov (208) 939-6713
Conan Chiu Idaho Department of Fish and Game (IDFG) No Administrative Contact conan.chiu@idfg.idaho.gov (208) 287-2813
Tim Copeland Idaho Department of Fish and Game (IDFG) Yes Contract Manager tim.copeland@idfg.idaho.gov (208) 287-2782x232
Mike Edmondson Idaho Governor's Office of Species Conservation No Interested Party mike.edmondson@osc.idaho.gov (208) 334-2189
Lance Hebdon Idaho Department of Fish and Game (IDFG) No Interested Party lance.hebdon@idfg.idaho.gov (208) 287-2711
Amy Hines Idaho Governor's Office of Species Conservation No Interested Party amy.hines@osc.idaho.gov (208) 332-1557
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Susan Offerdal Bonneville Power Administration Yes COR sfofferdal@bpa.gov (503) 230-4070
William Schrader Idaho Department of Fish and Game (IDFG) Yes Supervisor bill.schrader@idfg.idaho.gov (208) 465-8404x235
Susan Smith Idaho Department of Fish and Game (IDFG) No Administrative Contact susan.smith@idfg.idaho.gov (208) 287-2803
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Permits obtained to do field work B: 165. Project Permitting 12/31/2011 12/22/2011
Measure Stream Temperature in Salmon and Clearwater River Tributaries C: 157. Measure Stream Temperature 12/31/2011 12/31/2011
Collect Data from Adult Steelhead in Fish Creek and Rapid River D: 157. Collect Data from Adult Steelhead in Fish Creek & Rapid River 09/30/2011 09/30/2011
Install and Operate Screw Traps in Fish Creek, Rapid River and Big Creek E: 157. Install and Operate Screw Traps (Fish Creek, Rapid River & Big Creek) 11/30/2011 11/07/2011
DNA tissue collection at Salmon & Clearwater River tributaries, traps, and weirs F: 157. Collect DNA Tissue Samples (Salmon & Clearwater River tributaries, traps, & weirs 12/01/2011 11/07/2011
PIT-tagged fish G: 158. PIT tag juveniles in streams (Salmon & Clearwater River tributaries) 12/01/2011 11/07/2011
Snorkel surveys in Clearwater & Salmon River Tributaries H: 157. Snorkel streams to estimate juvenile densities (Salmon & Clearwater River tributaries) 09/30/2011 09/30/2011
Adult steelhead sampling in Big Creek I: 157. Sample adult steelhead in Big Creek (Middle Fk Salmon River) 07/01/2011 05/02/2011
Scale and tissue sample collection J: 157. Sample adult steelhead at Lower Granite Dam 12/15/2011 11/20/2011
Smolt data & samples K: 157. Sample wild steelhead smolts at Lower Granite Dam 07/15/2011 07/15/2011
Age of adult and juvenile steelhead L: 162. Assign ages to adult and juvenile steelhead scale samples collected at trap & weirs in 2010 04/30/2011 04/30/2011
Determine the age of wild adult steelhead M: 162. Assign ages to adult steelhead scale samples collected at Lower Granite Dam during run year 2010-11 12/31/2011 12/31/2011
Determine the age of wild juvenile steelhead N: 162. Assign ages to wild steelhead smolt scale samples collected at Lower Granite Dam during 2011 12/31/2011 12/31/2011
PIT tag files in PTAGIS O: 159. Manage PIT Tag Files 11/30/2011 11/07/2011
Reports & analysis P: 161. Fulfill Data Requests & Make Professional Presentations 12/31/2011 12/31/2011
Databases updated with 2011 data Q: 160. Maintain Databases 12/31/2011 12/31/2011
2010 Stream temperature data summarized R: 162. Summarize 2010 stream temperature data 04/01/2011 04/01/2011
Estimated juvenile production for ISMES streams S: 162. Estimate 2010 juvenile steelhead production and timing in Fish Creek, Rapid River, & Big Creek 04/01/2011 04/01/2011
Juvenile steelhead density estimates T: 162. Estimate fish densities in tributaries surveyed in 2010 04/01/2011 04/01/2011
Adult steelhead escapement into Idaho index streams. U: 162. Estimate 2010 steelhead escapement in Fish Creek, Rapid River & Big Creek 02/28/2011 02/28/2011
Wild adult steelhead escapement above Lower Granite Dam for the 2011 spawn year V: 162. Estimate wild adult steelhead escapement above Lower Granite Dam for spawn year 2011 12/31/2011 12/31/2011
Wild smolt production at Lower Granite Dam W: 162. Estimate wild steelhead smolt production at Lower Granite Dam during 2011 12/31/2011 12/31/2011
Journal articles X: 183. Prepare/Submit Journal Articles 12/31/2011 12/31/2011
2010 Annual Report Y: 132. Produce Annual Report for 2010 10/31/2011 10/26/2011
Manage project administration and coordination Z: 119. Manage Project 12/31/2011 12/31/2011

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 183 Produce Journal Article
  • 8 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 9 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 01/01/2011
B 165 Project Permitting 01/01/2011
C 157 Measure Stream Temperature 01/01/2011
D 157 Collect Data from Adult Steelhead in Fish Creek & Rapid River 04/28/2011
E 157 Install and Operate Screw Traps (Fish Creek, Rapid River & Big Creek) 04/28/2011
F 157 Collect DNA Tissue Samples (Salmon & Clearwater River tributaries, traps, & weirs 04/28/2011
G 158 PIT tag juveniles in streams (Salmon & Clearwater River tributaries) 04/28/2011
H 157 Snorkel streams to estimate juvenile densities (Salmon & Clearwater River tributaries) 01/01/2011
I 157 Sample adult steelhead in Big Creek (Middle Fk Salmon River) 04/28/2011
J 157 Sample adult steelhead at Lower Granite Dam 04/19/2011
K 157 Sample wild steelhead smolts at Lower Granite Dam 04/19/2011
L 162 Assign ages to adult and juvenile steelhead scale samples collected at trap & weirs in 2010 01/01/2011
M 162 Assign ages to adult steelhead scale samples collected at Lower Granite Dam during run year 2010-11 01/01/2011
N 162 Assign ages to wild steelhead smolt scale samples collected at Lower Granite Dam during 2011 01/01/2011
O 159 Manage PIT Tag Files 01/01/2011
P 161 Fulfill Data Requests & Make Professional Presentations 01/01/2011
Q 160 Maintain Databases 01/01/2011
R 162 Summarize 2010 stream temperature data 01/01/2011
S 162 Estimate 2010 juvenile steelhead production and timing in Fish Creek, Rapid River, & Big Creek 01/01/2011
T 162 Estimate fish densities in tributaries surveyed in 2010 01/01/2011
U 162 Estimate 2010 steelhead escapement in Fish Creek, Rapid River & Big Creek 01/01/2011
V 162 Estimate wild adult steelhead escapement above Lower Granite Dam for spawn year 2011 01/01/2011
W 162 Estimate wild steelhead smolt production at Lower Granite Dam during 2011 01/01/2011
X 183 Prepare/Submit Journal Articles 01/01/2011
Y 132 Produce Annual Report for 2010 01/01/2011
Z 119 Manage Project 01/01/2011