Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 74017 REL 12: 1998-010-05 EXP FALL CHINOOK ACCLIMATION FACILITIES
Project Number:
Title:
Fall Chinook Acclimation Facilities on Snake/Clearwater Rivers
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Blue Mountain Snake Hells Canyon 100.00%
Contract Number:
74017 REL 12
Contract Title:
1998-010-05 EXP FALL CHINOOK ACCLIMATION FACILITIES
Contract Continuation:
Previous: Next:
74769: 1998-010-05 EXP FALL CHINOOK ACCLIMATION FACILITIES
Contract Status:
Closed
Contract Description:
AUTHORIZATION:
US vs. OR, Production Advisory Committee, supported and directed the construction and operation of acclimation and release facilities for Snake River fall Chinook from Lyons Ferry Hatchery at three sites above Lower Granite Dam.  These projects were constructed as part of a funding package ($5.0 million add-on) provided by the Corps of Engineer's headquarters to the Walla Walla District to comply with the language in a Senate conference report (Senate Report, 103-672, P7) describing desired work to be accomplished under the Lower Snake River Fish and Wildlife Compensation Plan.

The conference report specified that:
"Only projects which will protect, maintain, and enhance biological diversity of existing wild stocks should be pursued."
A portion of the conference report language provides for final rearing and/or acclimation facilities for fall Chinook on the Snake River.  Snake River fall Chinook have been listed as a threatened species by NMFS under the Endangered Species Act.  The progeny of fish released by the project will be listed fish, thus the project will directly contribute to recovery of a listed species.
Funding for planning, engineering, conceptual design, NEPA, and construction has been secured from the COE.

FACILITIES:
The project is located in the Blue Mountain Province and the Snake Hells Canyon Sub Basin.  Two acclimation facilities, Capt. John Rapids and Pittsburg Landing are located on the Snake River between Asotin, WA. and Hells Canyon Dam and one facility is located on the Clearwater River at Big Canyon.  The Capt. John Rapids facility is a single pond while Pittsburg Landing and Big Canyon sites consist of portable fish rearing tanks assembled and disassembled each year.  Acclimation of 450,000 smolts (150,000 each facility) begins in March and ends 6 weeks later.  Acclimate up to 1.6 million sub-yearlings for 3 weeks following the yearling release.  All fish are transported from the Lyons Ferry Hatchery Complex which is a Lower Snake River Compensation Plan funded facility.

PROJECT GOALS:
This is a supplementation project; in that hatchery produced fish will be released into the natural spawning habitat in an effort to return a greater number of spawners and enhance natural production.  The stock selected for release is the only Snake River basin origin hatchery stock in the Pacific Northwest and the hatchery propagating the stock has been designated as a gene bank for Snake River fall Chinook.  This is a long-term project, and will ultimately work towards achieving de-listing goals established by NMFS.

RPA'S
The Snake River Fall Chinook Acclimation Project is an existing safety-net project and is addressed in the 2000 Biological Opinion Action 177:                    

"This action funds the actual implementation and operation of safety-net projects.  Depending on the planning results, specific measures may include funding modifications  of existing facilities, or construction and operation of new facilities.  The obligation to fund the safety-net program, including O&M, monitoring, and evaluation, will continue indefinitely, as circumstances warrant."

Deliverables for this project include:    
                                     Acclimate and release 450,000 yearling smolts
                                     Acclimate and release 1,600,000 sub-yearling smolts
Account Type(s):
Expense
Contract Start Date:
01/01/2018
Contract End Date:
12/31/2018
Current Contract Value:
$834,249
Expenditures:
$834,249

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Anthony Broncheau Nez Perce Tribe No Administrative Contact anthonyb@nezperce.org (208) 843-7317
Katey Grange Bonneville Power Administration Yes Env. Compliance Lead kcgrange@bpa.gov (503) 230-4047
Heidi Haak Bonneville Power Administration No Interested Party hlhaak@bpa.gov (541) 922-6856
Arleen Henry Nez Perce Tribe Yes Administrative Contact arleenh@nezperce.org (208) 621-3833
Rebecca Johnson Nez Perce Tribe Yes Supervisor beckyj@nezperce.org (208) 621-4629
Mike Key Nez Perce Tribe Yes Contract Manager mikek@nezperce.org (208) 843-7300x4633
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Bruce McLeod Nez Perce Tribe Yes Technical Contact brucem@nezperce.org (208) 843-7320x4628
Eric McOmie Bonneville Power Administration Yes COR ermcomie@bpa.gov (503) 230-4964
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
Tish Whitman Nez Perce Tribe Yes Interested Party tishw@nezperce.org (208) 843-7320
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Permits/Authorizations Acquired A: 165. Obtain Permits and submit copies to BPA NEPA group 10/06/2018 10/06/2018
Coordination and Transport B: 66. Transport yearling, sub-yearling and adult fall chinook Salmon (FSC) 12/31/2018 12/31/2018
Facilities and equipment maintained and secured. C: 61. Fall Chinook Acclimation Facility Maintenance 12/31/2018 12/31/2018
Produce Annual Maintenance Plan. Attach final AOP in Pisces. D: 174. Produce Annual Maintenance Plan 12/31/2018 12/31/2018
Acclimation and fish release from Big Canyon Creek (Yearling) E: 176. Acclimate Fall Chinook at Big Canyon Creek (Yearling) 12/31/2018 12/31/2018
Acclimation and fish release from Big Canyon Creek (Sub-yearling) F: 176. Acclimate Fall Chinook at Big Canyon (sub-yearling) 12/31/2018 12/31/2018
Acclimation and fish release from Captain John Rapids (Yearling) G: 176. Acclimate Fall Chinook at Captain John Rapids (Yearling) 12/31/2018 12/31/2018
Acclimation and fish release from Captain John Rapids (Sub-yearling) H: 176. Acclimate Fall Chinook at Captain John Rapids (Sub-yearling) 12/31/2018 12/31/2018
Acclimation and fish release from Pittsburg Landing I: 176. Acclimate Fall Chinook at Pittsburg Landing (Yearling) 12/31/2018 12/31/2018
Acclimation and fish release from Pittsburg Landing (Sub-yearling) J: 176. Acclimate Fall Chinook at Pittsburg Landing (Sub-yearling) 12/31/2018 12/31/2018
Information efforts for the public and cooperators K: 99. Conduct outreach and public education efforts 12/31/2018 12/31/2018
Coordination with all Cooperators L: 189. Fall Chinook acclimation Project Coordination 12/31/2018 12/31/2018
Completed Annual Report M: 132. Submit Progress Report for the period 1/1/2017 to 12/31/2017 09/01/2018 09/01/2018
Manage project in accordance with NPT and BPA requirements & submit FY16 SOW/Budget/Inventory N: 119. Manage and Administer Fall Chinook Acclimation Project 12/31/2018 12/31/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 6 instances of WE 176 Produce Hatchery Fish
  • 1 instance of WE 66 Trap/Collect/Hold/Transport Fish - Hatchery
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Obtain Permits and submit copies to BPA NEPA group 01/01/2018
B 66 Transport yearling, sub-yearling and adult fall chinook Salmon (FSC) 01/01/2018
C 61 Fall Chinook Acclimation Facility Maintenance 01/01/2018
D 174 Produce Annual Maintenance Plan 01/01/2018
E 176 Acclimate Fall Chinook at Big Canyon Creek (Yearling) 01/01/2018
F 176 Acclimate Fall Chinook at Big Canyon (sub-yearling) 01/01/2018
G 176 Acclimate Fall Chinook at Captain John Rapids (Yearling) 01/01/2018
H 176 Acclimate Fall Chinook at Captain John Rapids (Sub-yearling) 01/01/2018
I 176 Acclimate Fall Chinook at Pittsburg Landing (Yearling) 01/01/2018
J 176 Acclimate Fall Chinook at Pittsburg Landing (Sub-yearling) 01/01/2018
K 99 Conduct outreach and public education efforts 01/01/2018
L 189 Fall Chinook acclimation Project Coordination 01/01/2018
M 132 Submit Progress Report for the period 1/1/2017 to 12/31/2017 01/01/2018
N 119 Manage and Administer Fall Chinook Acclimation Project 01/01/2018
O 185 Periodic Status Reports for BPA 01/01/2018