Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 37879: 1999-019-00 EXP 12-MILE LAND ACQUISITION FOR SECT 206
Project Number:
Title:
Restore 12 Mile Reach of Upper Salmon River
Stage:
Closed
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
37879
Contract Title:
1999-019-00 EXP 12-MILE LAND ACQUISITION FOR SECT 206
Contract Continuation:
Previous: Next:
32493: 199901900 EXP RESTORE SALMON RIVER 12-MILE REACH CHALLIS, ID
  • 44104: 1999-019-00 RESTORE 12 MILE REACH UPPER SALMON R. CHALLIS,ID
Contract Status:
History
Contract Description:
Work holistically to restore the channelized Salmon River corridor to a natural meandering form in balance with watershed processes that will restore geomorphic diversity, reduce bank erosion, lower summer temperatures and improve critical fish habitat. US Army Corps of Engineers will provide 65% cost share for the project.  This contract seeks to purchase conservation easements along the 12-mile reach of the Salmon River from the Highway 75 Junction to Highway 93 Bridge (estimated at about 12 miles) in fulfillment of the 35% portion required by BPA.  The Corps will carry out habitat restoration activities on the acquired properties as required by the in site conditions.  Efforts include, but are not limited to, spring development, reconnection, diversion removal, fencing, side-channel enhancement, substrate improvements, etc.  Additionally, as conservation easements are acquired, the District will work with landowners to ensure compliance is maintained as stipulated in the purchase agreement.
Account Type(s):
Expense
Contract Start Date:
05/01/2008
Contract End Date:
08/31/2009
Current Contract Value:
$16,581
Expenditures:
$16,581

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Karma Bragg Custer Soil and Water Conservation District (SWCD) Yes Administrative Contact cswcd@custertel.net (208) 879-4428
Carl Christianson US Army Corps of Engineers (COE) No Interested Party carl.j.christianson@usace.army.mil (509) 527-7260
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Gerald McClintock Bonneville Power Administration Yes COR gmcclintock@bpa.gov (503) 230-5375
Ted O'Neal Custer Soil and Water Conservation District (SWCD) No Supervisor tdoneal@custertel.net (208) 879-4428
Rick Philps Custer Soil and Water Conservation District (SWCD) No Contract Manager (208) 879-4428
Brent Stanger No Interested Party (208) 733-0874
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
List of identified projects A: 114. Identify Project Opportunities in the 12-Mile Reach 08/31/2009 08/31/2009
Official appraisal of potential easements B: 172. Land Acquisition/Conservation Easements 08/31/2009 08/31/2009
Visitation Log C: 26. Investigate Trespass on Easement Property 08/31/2009 04/30/2009
BPA required administrative documents D: 119. Manage and Administer Projects 08/31/2009 08/31/2009

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 26 Investigate Trespass
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 1 instance of WE 26 Investigate Trespass
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 26 Investigate Trespass
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 114 Identify Project Opportunities in the 12-Mile Reach 02/09/2007
B 172 Land Acquisition/Conservation Easements 02/09/2007
C 26 Investigate Trespass on Easement Property 02/09/2007
D 119 Manage and Administer Projects 02/09/2007
E 132 Submit Annual Report for the period (October 2006 to September 2007) 02/09/2007
F 185 Periodic Status Reports for BPA 02/09/2007
G 165 Finalize EA for entire project area (Produced by COE) 02/09/2007
H 175 Develop engineering designs for Site 3 (Produced by COE) 02/09/2007
I 100 Construction Oversight for Site 3 implementation (Performed by COE) 02/09/2007