SOW Report
Contract 40388: 199604300 EXP JCAPE M&E
Project Number:
Title:
Johnson Creek Artificial Propagation Enhancement
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
40388
Contract Title:
199604300 EXP JCAPE M&E
Contract Continuation:
Previous: Next:
35880: 199604300 EXP JCAPE M/E
  • 45239: 199604300 EXP JCAPE M&E
Contract Status:
Closed
Contract Description:
In 1998, the JCAPE project requested an emergency Step-2 action from the Northwest Power and Conservation Council (NPCC) to begin limited salmon supplementation of the Johnson Creek stock of summer Chinook salmon population.  This request was to produce 100,000 smolts in existing facilities at the McCall Fish Hatchery.  This action allowed the JCAPE project to start the recovery of the Johnson Creek stock while the JCAPE project continued development through the NPCC 3-Step review process.  This limited production has now occurred in 1998, 2000, 2001, 2002, 2003, 2004, 2005, 2006, 2007, and 2008.  The original proposal for the JCAPE project was to produce 300,000 smolts annually. This level of production would have required the development of new satellite facilities on Johnson Creek and the expansion of the McCall Fish Hatchery.  NOAA Fisheries indicated, in August 2002, that they would only permit the JCAPE project for 100,000 smolts.  This level of production could be accomplished utilized existing hatchery facilities without modifications.

Johnson Creek Artificial Propagation Enhancement Project is a conservation program that will spawn, incubate, rear, and release summer Chinook salmon. This program will utilize existing incubation and rearing facilities at the Lower Snake River Compensation Plan (LSRCP) juvenile rearing hatchery at McCall, Idaho.  Juvenile fish will be reared to the smolt stage and direct released into Johnson Creek.  The production goal for Johnson Creek Chinook salmon remains 100,000 smolts.  These numbers are authorized by NMFS through Section 10 permits of the Endangered Species Act (ESA Permit #1250, approval pending).

Juveniles will be raised to smolts from incubation to release in variable water temperature conditions mimicking the natural regime. Rearing conditions will also include low density (0.1 to 0.30 lb/cf/in), and natural photo-period (indoors).  Smolts will be direct released into a known natural production area in Johnson Creek with the intent that the returning adults will spawn in their natural habitat.  Releases of juvenile smolts occurred in 2000, 2002, 2003, 2004, 2005, 2006, 2007, and 2008.  Existing McCall Fish Hatchery facility structure limits JCAPE production to one final rearing container. As such, concurrent comparative rearing strategies are not possible.

This program, initiated prior to the first releases of supplemented fish, has been collecting baseline life-history characteristic information, to examine survival of the natural fish in Johnson Creek and any potential effects that the supplementation program may have on the natural population. This M&E program quantifies 38 key performance measures, which are being standardized throughout Columbia River Basin (within Collaborative System-wide Monitoring and Evaluation Project), and contributes to regional monitoring and evaluation (RM&E) efforts addressing critical uncertainties associated with supplementation and ESA listed stock status/recovery.  These performance measures are listed in six major categories: (1) Abundance, (2) Survival-Productivity, (3) Distribution, (4) Genetic, (5) Life History, and (6) Habitat.  Evaluation under the context of these performance measures give us the most accurate means to evaluate this supplementation program.
Account Type(s):
Expense
Contract Start Date:
01/01/2009
Contract End Date:
12/31/2009
Current Contract Value:
$581,362
Expenditures:
$581,362

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Arleen Henry Nez Perce Tribe No Administrative Contact arleenh@nezperce.org (208) 621-3833
Jay Hesse Nez Perce Tribe No Supervisor jayh@nezperce.org (208) 621-3552
Rebecca Johnson Nez Perce Tribe Yes Technical Contact beckyj@nezperce.org (208) 621-4629
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Jonathan McCloud Bonneville Power Administration Yes COR jmmccloud@bpa.gov (503) 230-3110
Craig Rabe Nez Perce Tribe Yes Contract Manager craigr@nezperce.org (208) 634-5290x3311
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Jason Vogel Nez Perce Tribe No Interested Party jasonv@nezperce.org (208) 621-3602
Nancy Weintraub Bonneville Power Administration No Env. Compliance Lead nhweintraub@bpa.gov (503) 230-5373


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Obtain and submit environmental permits A: 165. Obtain Permits and submit copies to BPA NEPA group 03/31/2009 03/31/2009
Escapement monitoring and adult production estimation B: 157. Monitor Johnson Creek Adult Escapement and Estimate Adult Production 10/31/2009 10/31/2009
Redd & Carcass surveys C: 157. Conduct Redd Counts, Prespawning, and Carcass Surveys 10/01/2009 10/01/2009
Screw trap install and remove D: 70. Install and Remove Screw Trap 12/15/2009 12/15/2009
Collection of genetic samples and bony structures E: 157. Collect DNA, Scale, Snout & Fin Ray Samples from Adult summer Chinook Salmon in JC 12/31/2009 12/28/2009
Mark & tag summer chinook F: 158. Mark Juvenile and Adult Summer Chinook Salmon 12/31/2009 12/28/2009
Screw trap operation G: 157. Operate Juvenile Screw Traps 12/31/2009 12/28/2009
Public outreach H: 99. Public Outreach for Fisheries Education 05/31/2009 05/31/2009
Manage PIT tag files I: 159. Manage PIT Tag Files 12/15/2009 12/15/2009
Evaluate effectiveness of supplementation program J: 162. Evaluate Effects of Supplementation Using Performance Measure Evaluation 12/31/2009 12/28/2009
Coordination of data collection and dissemination K: 189. Coordinate JCAPE M&E Activities with Cooperating Agencies 12/01/2009 12/01/2009
Quarterly Report submission L: 141. Produce Quarterly Reports 12/31/2009 12/28/2009
Report preparation and submission (2008 progress report) M: 132. Submit Progress Report for the period 1/2/2008 to 12/31/2008 12/31/2009 12/23/2009
Manage and administer project N: 119. Manage and Administer Projects 12/31/2009 12/28/2009

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 4 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Obtain Permits and submit copies to BPA NEPA group 02/09/2007
B 157 Monitor Johnson Creek Adult Escapement and Estimate Adult Production 06/30/2008
C 157 Conduct Redd Counts, Prespawning, and Carcass Surveys 10/20/2008
D 70 Install and Remove Screw Trap 06/30/2008
E 157 Collect DNA, Scale, Snout & Fin Ray Samples from Adult summer Chinook Salmon in JC 06/30/2008
F 158 Mark Juvenile and Adult Summer Chinook Salmon 06/30/2008
G 157 Operate Juvenile Screw Traps 06/30/2008
H 99 Public Outreach for Fisheries Education 02/09/2007
I 159 Manage PIT Tag Files 02/09/2007
J 162 Evaluate Effects of Supplementation Using Performance Measure Evaluation 02/09/2007
K 189 Coordinate JCAPE M&E Activities with Cooperating Agencies 02/09/2007
L 141 Produce Quarterly Reports 02/09/2007
M 132 Submit Progress Report for the period 1/2/2008 to 12/31/2008 02/09/2007
N 119 Manage and Administer Projects 02/09/2007
O 185 Periodic Status Reports for BPA 02/09/2007