Spawning Surveys: Rock Creek Database with Results presented in Annual Report |
B: 157. Spawning ground surveys (redd counts) and scale collection |
|
05/31/2010 |
05/31/2010 |
Survey & Scale Collection: Rock Creek Database with Results presented in Annual Report |
C: 157. Juvenile and resident salmonid population surveys and scale collection |
|
05/14/2010 |
05/14/2010 |
Genetic Sampling: Rock Creek Database with Results presented in Annual Report |
D: 157. Steelhead genetic data collection |
|
05/15/2010 |
05/15/2010 |
Genetic Analysis: Rock Creek Database with Results presented in Annual Report |
E: 162. Steelhead genetic tissue analysis and synthesis |
|
05/16/2011 |
05/16/2011 |
Habitat Surveys: Rock Creek Database with Results presented in Annual Report |
F: 157. All Species: Habitat Surveys |
|
05/15/2010 |
05/15/2010 |
Water Monitoring: Rock Creek Database with Results presented in Annual Report |
G: 157. Water quality and temperature |
|
05/31/2010 |
05/31/2010 |
Pathogen Sampling: Rock Creek Database with Results presented in Annual Report |
H: 157. Pathogen sampling |
|
05/31/2010 |
05/31/2010 |
PITAGIS database |
I: 158. Juvenile steelhead PIT tagging |
|
05/15/2010 |
05/15/2010 |
Scale Analysis: Rock Creek Database with Results presented in Annual Report |
J: 162. Scale Analysis |
|
05/31/2010 |
05/31/2010 |
Spawning Gravel: Rock Creek Database with Results presented in Annual Report |
K: 157. Sample spawning gravel |
|
05/15/2010 |
05/31/2010 |
Funding Package - Submit draft to COTR |
L: 119. Plan and coordinate project funding package |
|
02/01/2010 |
02/26/2010 |
At least one visit to at least one of the local elementary schools by Rock Creek staff person. |
M: 99. Public outreach and education to local residents and other agencies |
|
05/15/2010 |
03/31/2010 |
Data will be available through the EDT Mobrand website under Rock Creek Watershed Database. |
N: 162. EDT modeling; incorporate new habitat and biological data |
|
05/31/2010 |
05/31/2010 |
Rock Creek Prioritization List |
O: 162. Data collected this year will be analyzed and compared with available data from past years |
|
05/28/2010 |
05/28/2010 |
Finalize Year 1 Annual Report & Upload to PISCES |
P: 132. Finalize YR 1 Report and Produce YR 2 Draft Annual Report |
|
07/17/2009 |
07/17/2009 |
Environmental Compliance Documentation |
Q: 165. Participate in ESA/NEPA Compliance for Rock Creek M&E & Fisheries Management |
|
01/11/2010 |
01/11/2010 |
Project Management Activities |
R: 98. Manage daily project activities |
|
05/31/2010 |
05/31/2010 |
Conduct planting at two sites |
S: 47. Plant: Lower Rock Creek Mainstem |
|
05/15/2010 |
05/15/2010 |
Invasive weed control at riparian tree project sites. |
T: 53. Invasive weed control at riparian tree planting sites |
|
04/30/2010 |
04/30/2010 |
Install three piezometers at three locations in Rock Creek |
U: 98. Install three piezometer wells |
|
05/28/2010 |
05/28/2010 |
PIT tag interrogator PTIS MUX maintenance and evaluation |
V: 158. Subcontract for PIT tag interrogator maintenance and monitoring |
|
05/15/2010 |
05/15/2010 |
Spawning Surveys: Rock Creek Database with Results presented in Annual Report |
W: 157. Spawning ground surveys (redd counts) and scale collection II |
|
05/15/2011 |
05/15/2011 |
Survey & Scale Collection: Rock Creek Database with Results presented in Annual Report |
X: 157. Juvenile and resident salmonid population surveys and scale collection II |
|
05/15/2011 |
05/15/2011 |
Genetic Sampling: Rock Creek Database with Results presented in Annual Report |
Y: 157. Steelhead genetic data collection II |
|
05/31/2011 |
05/31/2011 |
Genetic Analysis: Rock Creek Database with Results presented in Annual Report |
Z: 162. Steelhead genetic tissue analysis and synthesis II |
|
05/31/2011 |
05/31/2011 |
Habitat Surveys: Rock Creek Database with Results presented in Annual Report |
AA: 157. All Species: Habitat Surveys II |
|
05/15/2011 |
05/15/2011 |
Water Monitoring: Rock Creek Database with Results presented in Annual Report |
AB: 157. Water quality and temperature |
|
05/31/2011 |
05/15/2011 |
Pathogen Sampling: Rock Creek Database with Results presented in Annual Report |
AC: 157. Pathogen sampling II |
|
05/31/2011 |
|
PITAGIS database |
AD: 158. Juvenile steelhead PIT tagging II |
|
05/31/2011 |
05/31/2011 |
Scale Analysis: Rock Creek Database with Results presented in Annual Report |
AE: 162. Scale Analysis II |
|
05/31/2011 |
05/31/2011 |
Spawning Gravel: Rock Creek Database with Results presented in Annual Report |
AF: 157. Sample spawning gravel II |
|
05/31/2011 |
05/31/2011 |
Funding Package - Submit draft to COTR |
AG: 119. Plan and coordinate project funding package II |
|
04/20/2011 |
05/31/2011 |
At least one visit to at least one of the local elementary schools by Rock Creek staff person. |
AH: 99. Public outreach and education to local residents and other agencies II |
|
05/15/2011 |
05/15/2011 |
Data will be available through the EDT Mobrand website under Rock Creek Watershed Database. |
AI: 162. EDT modeling; incorporate new habitat and biological data II |
|
05/31/2011 |
05/31/2011 |
Rock Creek Prioritization List |
AJ: 162. Data collected this year will be analyzed and compared with available data from past years II |
|
05/31/2011 |
05/31/2011 |
Finalize Year 2 Annual Report & Upload to Pisces |
AK: 132. Finalize Year 2 Annual Report & Produce Draft Year 3 Annual Report |
|
07/31/2011 |
|
Environmental Compliance Documentation |
AL: 165. Participate in ESA/NEPA Compliance for Rock Creek M&E & Fisheries Management II |
|
06/02/2010 |
06/02/2010 |
Project Management Activities |
AM: 98. Coordination Activities |
|
05/31/2011 |
05/31/2011 |
Conduct planting at two sites |
AN: 47. Plant: Lower Rock Creek Mainstem II |
|
05/15/2011 |
05/15/2011 |
Invasive weed control at three sites. |
AO: 53. Invasive weed control at riparian tree planting sites II |
|
04/30/2011 |
04/30/2011 |
Install three piezometers at three locations in Rock Creek |
AP: 98. Install piezometer wells II |
|
05/13/2011 |
05/13/2011 |
PIT tag interrogator PTIS maintenance and evaluation |
AQ: 158. Subcontract for PIT tag interrogator maintenance and monitoring II |
|
07/31/2011 |
07/31/2011 |