Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 46273 REL 88: 2003-017-00 EXP ISEMP - NOAA FISHERIES COORDINATION - PROJ DESIGN
Project Number:
Title:
Integrated Status and Effectiveness Monitoring Program (ISEMP)
BPA PM:
Stage:
Complete
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
46273 REL 88
Contract Title:
2003-017-00 EXP ISEMP - NOAA FISHERIES COORDINATION - PROJ DESIGN
Contract Continuation:
Previous: Next:
46273 REL 69: 2003-017-00 EXP ISEMP - NOAA FISHERIES COORDINATION - PROJ DESIGN
  • 46273 REL 104: 2003-017-00 EXP ISEMP - NOAA FISHERIES COORDINATION - PROJ DESIGN
Contract Status:
Closed
Contract Description:
This project seeks to develop two novel monitoring and evaluation programs: (i) subbasin-scale pilot status and trend monitoring efforts for anadromous salmonids and their habitat in the Wenatchee, John Day and Salmon River basins, and (ii) effectiveness monitoring for suites of habitat restoration projects in selected watersheds within the three target subbasins.  This work builds on current status and trend monitoring programs within each of these basins; however, the proposed work differs structurally from much of the ongoing status and trend monitoring work as it focuses on the explicit development and testing of the sampling protocols and methodologies required for generating habitat and population monitoring data of known spatio-temporal resolution, accuracy and precision.  The proposed work expands on the utility of status monitoring data to explicitly address watershed-scale questions of habitat restoration action effectiveness.  The ultimate objective of the project is to develop an end-to-end data gathering to analysis system that supports tributary habitat off-site mitigation actions.

This contract's specific portion of the entire project (2003-017-00) will address overall coordination tasks.  The overall technical and scientific coordination of the project will be accomplished by the project sponsor (NMFS/NWFSC, Dr. Chris Jordan) through this contract.  

This contract will also cover three additional technical coordination tasks: data collation to support initial design and scoping, data management system design and development, and statistical support for project data analysis.  These tasks fall under the overarching heading of technical project management, and are identified as individual tasks as they will be accomplished through a variety of subcontracting vehicles initiated by the project sponsor.

The role of actions under this contract are to integrate and oversee all other ISEMP (2003-017) contract and cost-share actions.  As a result, some WEs appear redundant with other contracts; however, these are shared tasks and tasks where direct NOAA staff or contractor participation is necessary.  All potential WE overlap is identified in the WE description.

Coordination with USFS's monitoring program PIBO
As part of the work expected under this contract, specific effort will be directed to developing interoperability between CHaMP and PIBO monitoring metrics.  The work involved to advance the interoperability includes two components: data analysis methods that make use of both program's data, and the development of a data management system to store metrics from both programs.  The outcome of this work will be a report on suggested analytical methods for joint data analysis.   The data management system to jointly serve monitoring metrics from both programs will also be an outcome of the coordination efforts, but will be accomplished through different CHaMP/ISEMP (non-NOAA effort).


Coordination with BPA's monitoring program AEM
As part of the work expected under this contract, specific effort will be directed to tracking the coordination of implementing CHaMP and AEM -ield data collection and post-processing.  The work involved to track coordination includes two components: ongoing journaling of coordination effort, and a post-season meeting to evaluate the efficacy of planned coordination of field data collection, post-processing of data, data management, and issues that arose from study design coordination.  The outcome of this work will be a report on the joint operation experience from field season 2014.
Account Type(s):
Expense
Contract Start Date:
07/01/2014
Contract End Date:
06/30/2015
Current Contract Value:
$173,659
Expenditures:
$173,659

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Christopher Beasley Quantitative Consultants Inc Yes Interested Party chris@qcinc.org (360) 620-2883
Joseph Connor Bonneville Power Administration Yes COR jwconnor@bpa.gov (503) 230-3172
Michael Ford National Oceanic and Atmospheric Administration Yes Supervisor mike.ford@noaa.gov (206) 860-5612
Chris Jordan National Oceanic and Atmospheric Administration Yes Contract Manager chris.jordan@noaa.gov (541) 754-4629
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Amy Mai Bonneville Power Administration Yes Env. Compliance Lead aemai@bpa.gov (503) 230-7349
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Pamela Nelle Terraqua, Inc. Yes Interested Party pamela@terraqua.biz (509) 885-8143
Mary Nolting National Oceanic and Atmospheric Administration No Administrative Contact mary.nolting@noaa.gov (206) 860-3232
Carol Volk South Fork Research, Inc. Yes Interested Party carol@southforkresearch.org (206) 240-0301
Michael Ward Terraqua, Inc. Yes Technical Contact mike@terraqua.biz (509) 486-2426
Jody White Quantitative Consultants Inc Yes Interested Party jody@qcinc.org (208) 860-5269


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
In-water work -- Beaver Dam Support B: 29. Install Beaver Dam Support structures 11/30/2014 11/30/2014
PIT tag antenna design standardization C: 156. PIT tag antenna design and installation 06/30/2015 06/30/2015
ISEMP Project Data Reduction and Analysis D: 162. ISEMP data analysis coordination 06/30/2015 06/30/2015
All administrative tasks fulfilled with timely quality products E: 119. Manage and Administer Projects 06/30/2015 06/30/2015
Environmental Compliance supporting documentation F: 165. Environmental Compliance 06/30/2015 06/30/2015
Summary Report for Contract 64273/rel 69 G: 132. Final Progress Report for Contract Year 2013 09/30/2014 08/31/2014
Submit relevant material to annual CHaMP Lessons Learned Report H: 141. Support Development of CHaMP Annual Synthesis Report 03/31/2015 03/31/2015
ISEMP annual summary report components I: 141. Support Development of ISEMP Annual Synthesis Report 05/31/2015 05/31/2015
Summary of CHaMP-PIBO coordination issues J: 141. Support Coordination of CHaMP and PIBO monitoring work 06/30/2015 06/30/2015
Summary of CHaMP-AEM coordination issues K: 141. Support Coordination of CHaMP and AEM monitoring work 06/30/2015 06/30/2015
BiOp RM&E Report L: 141. Support Development of BiOp RPA Report & RM&E Report 05/31/2015 05/31/2015

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 07/01/2014
B 29 Install Beaver Dam Support structures 07/01/2014
C 156 PIT tag antenna design and installation 07/01/2014
D 162 ISEMP data analysis coordination 07/01/2014
E 119 Manage and Administer Projects 07/01/2014
F 165 Environmental Compliance 07/01/2014
G 132 Final Progress Report for Contract Year 2013 07/01/2014
H 141 Support Development of CHaMP Annual Synthesis Report 07/01/2014
I 141 Support Development of ISEMP Annual Synthesis Report 07/01/2014
J 141 Support Coordination of CHaMP and PIBO monitoring work 07/01/2014
K 141 Support Coordination of CHaMP and AEM monitoring work 07/01/2014
L 141 Support Development of BiOp RPA Report & RM&E Report 07/01/2014