Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 46273 REL 89: 1988-053-03 EXP PARKDALE NOAA COMPARATIVE HATCHERY STUDY
Project Number:
Title:
Hood River Production Program Monitoring and Evaluation (M&E)
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Gorge Hood 100.00%
Contract Number:
46273 REL 89
Contract Title:
1988-053-03 EXP PARKDALE NOAA COMPARATIVE HATCHERY STUDY
Contract Continuation:
Previous: Next:
46273 REL 72: 1988-053-03 EXP PARKDALE NOAA COMPARATIVE HATCHERY STUDY
  • 46273 REL 106: 1988-053-03 EXP PARKDALE NOAA COMPARATIVE HATCHERY STUDY
Contract Status:
Closed
Contract Description:
Objective I. Hood River Spring Chinook Salmon Smolt Quality

The Hood River, Oregon Salmon Production Program is co-managed by the Warm Springs Tribe (WS) and the Oregon Department of Fish and Wildlife (ODFW) for supplementation of spring Chinook salmon in the Hood River system.  The current Master Plan for the Hood River Production Program (March 5, 2008 Draft) calls for a comparative hatchery release study designed to "provide co-managers with the best available information for determining a long term biologically sound and cost effective spring Chinook salmon production strategy for the Hood River Basin that balances harvest needs with ecological considerations".  Rearing facilities, both inside and outside the basin, are being evaluated for long-term use in the Hood River spring Chinook supplementation program.  The objective of this evaluation is to conduct a multi-year (2008-2018) comparative study of Hood River spring Chinook reared at three different hatchery facilities prior to being moved to the West Fork Hood River for final acclimation and release.  The facilities include, Round Butte Hatchery/Pelton Ladder (RBH) on the Deschutes River, OR; Columbia Gorge Hatchery (CGH) a.k.a. Carson National Hatchery on the Wind River, WA; Parkdale Fish Facility (PFF) on the Hood River, OR.  Each year, starting Fall 2008, returning adults will be collected in the Hood River, artificially spawned at the PFF, and gametes will be distributed to each of the respective hatchery facilities for long term-rearing to the parr-smolt stage.   Starting in Spring 2010 uniquely tagged juveniles from RBH and CGH were moved to the Moving Falls Acclimation Pond on the West Fork Hood River for acclimation and forced release in April.  The fish from the PFF are released from that site.  The Hood River Master Plan calls for monitoring fish health, size at release, specific growth rates, rates of precocious male maturation (age-2 minijacks, age-3 jacks) and ultimately smolt-to-adult returns (SAR's) for each brood year/release group.  SAR's for all adult year classes from all brood years are available starting in 2011 with final returns in 2015.   These data will be used to evaluate which hatchery facility/regime is optimum for future long-term implementation in the Hood River Supplementation program.

As part of the broader Revised Hood River Production Master Plan we are conducting the following Hood River Smolt Quality Monitoring and Evaluation Study.  The overall goals will be:

A.  Monitor spring growth and smolt development at all rearing sites.

B.  Provide comparative metrics of smolt quality between rearing sites.

Specifically, we will determine if differences in growth, smolt development and early male maturation, exist between Hood River spring Chinook salmon reared at RBH, PFF and CGH and subsequently released into the West Fork Hood River for three consecutive brood years (BY) 2008-2010 released in years 2010-2012. In addition, we will monitor Deschutes stock spring Chinook reared at RBH and released into the Deschutes River and Carson stock spring Chinook reared at CGH and released into the Wind River.  These measures will allow us to:

C.  Assess the effects on growth and smolt development of transferring fish from out of basin rearing facilities (RBH and CGH) to the acclimation release site at Moving Falls on the West Fork Hood River.  

These physiological/life-history indices will provide early, predictable and replicated comparative data, before the acquisition of full SAR's from 2011-2015, for evaluating the three rearing regimes.  In addition, these metrics are independent of any potential alteration in ocean conditions that can produce variation in SAR's that are unrelated to freshwater rearing.  However, once SAR's are obtained we will be able to:

D.  Correlate physiological indices of growth and smolting to SAR to evaluate key factors responsible for potential differences in survival between release groups

This will allow us to:

E.  Evaluate rearing practices with regard to A, B and C to recommend "best" rearing practices and a long term rearing strategy for the HRPP. Results will be available for managers in late-2012 with the completion of our final comparative physiology report proposed in this SOW.  Final correlational analysis of physiological indicators with SAR's (D) will be conducted as adults return from 2011-2015.

NOTE for FY 15:

For the FY 2015 SOW under this Objective I we will conduct data analysis, graphics and manuscript preparation of a third manuscript from this hatchery evaluation project focused specifically on the the comparison between these three rearing groups and the relationships between smolt physiology, early male maturation and smolt to adult return rates (SARS).
As of the writing of this SOW, the Hood River, Oregon Production Program co-managers have made some programmatic decisions based on results from this project to focus Hood River spring Chinook salmon rearing at Pelton Ladder, Parkdale Fish Facility with potential for longer term in basin rearing at the recently completed Moving Falls Acclimation Facilty on the West Fork of the Hood River.  Rearing of Hood River spring Chinook at Carson hatchery was discontinued.  During this contract period we will conduct spring (pre-release) physiological evaluation (size, growth rate, adiposityt, minijack)  of each separate rearing group produced (Pelton Ladder, Parkdale, Moving Falls) in the Hood Program to help further refine the best strategy or combination of strategies for future production.


Objective II.  Hood River Steelhead Trout Residualism Monitoring

          Like spring Chinook salmon, steelhead trout display significant phenotypic plasticity in both the age of smolting and age of maturation.  Hatchery-reared steelhead may adopt one of three life history pathways after release: 1) smolt and migrate to sea 2) sexually mature and remain in freshwater and attempt to spawn naturally (primarily males), or 3) "residualize" as a non-smolting and non-maturing parr and delay migration or maturation 'decisions' until the subsequent year(s).   The objective of this work is to use a series of recently developed physiological indices to quantify residualism rates of the steelhead trout population supplemented in to the Hood River by WS and ODFW.  These fish are from Hood River natural origin brood stock reared at Oak Springs Hatchery on the Deschutes River, OR and released in to the Hood River in May of each spring.  After transfer of the fish from Oak Springs to the Hood River we will collect 300 fish and sample them for length, weight, condition factor, pituitary glands for measurement of mRNA levels of reproductive hormones, plasma for measurement of 11-ketotestosterone and gonad tissue for mRNA measurement of reproductive hormones and histological analysis.  Finally, we will collect gills for determination of Na+/K+-ATPase enzyme activity as an indicator of smoltification.  These indices will be examined in a multifactorial analysis to catagorize fish into thier respective life-histories.  These data will be used to help determine rates of residualism in Hood River steelhead and to potentially help modify rearing regimes for these fish to minimize residualism rates.  This work will be conducted with S1 steelhead over three consecutive brood years for the reasons outlined above: BY 2011-2013 released in 2012-2014.

NOTE for FY 15
For the FY 2015 SOW under this Objective II we will write a peer reviewed manuscript describing this three year Steelhead physiology assessment and residualism determination.
Account Type(s):
Expense
Contract Start Date:
01/01/2015
Contract End Date:
12/31/2015
Current Contract Value:
$170,000
Expenditures:
$170,000

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental compliance B: 165. BPA environmental compliance 01/30/2015 01/30/2015
Manage and administer BPA project C: 119. Administration of BPA contract 12/31/2015 12/31/2015
HRPP smolt quality and minijack monitoring D: 157. Hood River Spring Chinook Production Program Comparative smolt quality monitoring-BY 2013 04/30/2015 04/30/2015
Hood River Spring Chinook BY 2013 smolt quality and minijack monitoring E: 162. Analyze Hood River Spring Chinook smolt quality data - BY 2013 production groups 08/31/2015 08/31/2015
HRPP Spring Chinook Comparison report Part 3 and Presentation F: 141. Relationship between growth, smolt development, age of maturity, SAR's in Hood River Sp. Chinoo 12/31/2015 12/31/2015
Hood River steelhead life-history summary report G: 141. Using physiological tools to forecast life-history in Hood R. steelhead 12/31/2015 12/31/2015
FY 2014 Annual Report H: 132. Annual report for 1/1/14 -12/31/14 12/31/2015 12/31/2015

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 01/01/2015
B 165 BPA environmental compliance 01/01/2015
C 119 Administration of BPA contract 01/01/2015
D 157 Hood River Spring Chinook Production Program Comparative smolt quality monitoring-BY 2013 01/01/2015
E 162 Analyze Hood River Spring Chinook smolt quality data - BY 2013 production groups 01/01/2015
F 141 Relationship between growth, smolt development, age of maturity, SAR's in Hood River Sp. Chinoo 01/01/2015
G 141 Using physiological tools to forecast life-history in Hood R. steelhead 01/01/2015
H 132 Annual report for 1/1/14 -12/31/14 01/01/2015