Idaho scientific collection, transportation, and federal permits |
A: 165. Obtain necessary permits and set up contract for genetic analysis |
|
06/15/2010 |
05/07/2010 |
Weekly electrofishing collection of bull trout below Albeni Falls Dam |
B: 157. Weekly electrofishing to collect a representative sample of bull trout below Albeni Falls Dam |
|
04/28/2011 |
04/28/2011 |
Angling for bull trout below Albeni Falls Dam |
C: 157. Angling for bull trout and westslope cutthroat trout |
|
04/30/2011 |
04/12/2011 |
Implanting of radio tags |
D: 158. Implant combination radio acoustic transmitter into bull trout and westslope cutthroat trout |
|
04/30/2011 |
04/30/2011 |
Bull trout transported above Albeni Falls Dam |
E: 28. Transport bull trout above Albeni Falls Dam |
|
04/29/2011 |
04/29/2011 |
Genetic Analysis |
F: 157. Rapid response genetic analysis of bull trout biopsy samples |
|
04/29/2011 |
04/29/2011 |
Location and habitat data prepared for analysis |
G: 157. Manually track Bull trout and westslope cutthroat trout in the Pend Oreille River |
|
04/15/2011 |
04/15/2011 |
Tracking of radio tagged fish with aircraft, vehicle, and boat. |
H: 157. Mobile tracking surveys by fixed wing aircraft and vehicle |
|
04/14/2011 |
04/14/2011 |
Analyzed data for annual technical report. |
I: 162. Analysis of bull trout and westslope cutthroat trout radio telemetry data |
|
04/29/2011 |
04/29/2011 |
Annual maintenance of monitoring equipment |
J: 70. Annual overhaul and recalibration of ground receiver stations |
|
03/31/2011 |
03/21/2011 |
Electrofishing data entry |
K: 157. Compile electronic spread sheet data base of electrofishing data |
|
04/29/2011 |
04/29/2011 |
Downloading stationary ground radio receiver |
L: 157. Download stationary ground radio receiving station |
|
04/29/2011 |
04/29/2011 |
Data analysis of tracking data |
M: 162. Data reduction and analysis |
|
04/14/2011 |
04/14/2011 |
Project coordination among stakeholders |
N: 189. Project coordination among all stakeholders |
|
04/29/2011 |
04/29/2011 |
Funding Package - Submit draft to COTR |
O: 119. Manage Project |
|
02/01/2011 |
01/24/2011 |
Final report uploaded to the BPA website |
P: 132. Submit Annual Report for the period (5/1/2010) to (4/30/2011) |
|
04/30/2011 |
04/30/2011 |
Attach Progress Report in Pisces |
Q: 132. Submit Progress Report for the period (5/1/10) to (4/30/11) |
|
06/22/2010 |
06/22/2010 |