Province | Subbasin | % |
---|---|---|
Columbia Plateau | Columbia Lower Middle | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Funding Package - Submit draft to COTR | A: 119. Contract development & direction | 04/01/2011 | 03/31/2011 | |
Final version of Strategic Plan for Master Plan Document | B: 174. Strategic Plan element of the Master Plan | 10/29/2010 | 10/28/2010 | |
Workshop Proceedings | C: 189. Strategic Planning Workshop: Part 2 | 06/30/2011 | ||
Manuscript | D: 183. Symposium Article | 06/30/2011 | ||
Coordination work products | E: 168. Conceptual Plan Coordination | 06/30/2011 | ||
Draft Master Plan | F: 174. Master Plan Development | 06/30/2011 | ||
Diagrams, drawings, draft design | G: 175. Conceptual Design | 06/30/2011 |
Primary Focal Species | Work Statement Elements |
---|---|
Sturgeon, White (A. transmontanus) - Lower Columbia River |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 119 | Contract development & direction | 07/01/2010 | ||||||
B | 174 | Strategic Plan element of the Master Plan | 07/01/2010 | ||||||
C | 189 | Strategic Planning Workshop: Part 2 | 07/01/2010 | ||||||
D | 183 | Symposium Article | 07/01/2010 | ||||||
E | 168 | Conceptual Plan Coordination | 07/01/2010 | ||||||
F | 174 | Master Plan Development | 07/01/2010 | ||||||
G | 175 | Conceptual Design | 07/01/2010 | ||||||
H | 185 | Periodic Status Reports for BPA | 07/01/2010 | ||||||
I | 132 | The Draft Step 1 Master Plan will be considered to be the Progress Report | 07/01/2010 |