Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 51809: 1998-016-00 EXP ESCAPEMENT/PRODUCTIVITY SPRING
Project Number:
Title:
Escapement and Productivity of Spring Chinook and Steelhead
BPA PM:
Stage:
Complete
Area:
Province Subbasin %
Columbia Plateau John Day 100.00%
Contract Number:
51809
Contract Title:
1998-016-00 EXP ESCAPEMENT/PRODUCTIVITY SPRING
Contract Continuation:
Previous: Next:
46071: 1998-016-00 EXP ESCAPEMENT/PRODUCTIVITY SPRING
  • 56008: 1998-016-00 EXP ESCAPEMENT/PRODUCTIVITY SPRING
Contract Status:
Closed
Contract Description:
Salmonid Productivity, Status, and Trend Monitoring
in the John Day River Basin
Statement of Work and Budget FY2010

BPA Project Number:  1998-016-00
Contract Number:  
Performance/Budget Period: 1 Feb. 2010 to 31 Jan. 2010
The John Day River subbasin supports one of the last remaining intact wild populations of spring Chinook salmon and summer steelhead in the Columbia River Basin. These populations, however, remain depressed relative to historic levels. Numerous habitat protection and rehabilitation projects to improve salmonid freshwater production and survival have been implemented in the basin and are in need of effectiveness monitoring. While our monitoring efforts outlined here will not specifically measure the effectiveness of any particular project, they will provide much needed background (status and trend) information for developing context for project-specific effectiveness monitoring efforts. To meet the data needs as index stocks, to assess the long-term effectiveness of habitat projects, and to differentiate freshwater and ocean survival, sufficient annual estimates of spawner escapement, age structure, SAR, and egg-to-smolt survival are needed.  Additional sampling and analyses to meet these goals include an estimate of smolt abundance and SAR rates. Columbia Basin managers have identified the John Day subbasin spring Chinook population as an index population for assessing the effects of alternative future management actions on salmon stocks in the Columbia Basin.

This work is integrated with the current RM&E effort for the John Day River basin. Our efforts provide nearly all of the status and trend monitoring, and some of the effectiveness monitoring, for the RM&E projects. Coordination occurs through periodic meetings. Trap operations coincide with current research efforts and comanagers participate.


References:

Hart, P.J.B. and T.J. Pitcher. 1969. Field trials of fish marking using a jet inoculator. Journal of Fish Biology. 1:383-385.

Keefe, M.L., and five co-authors. 1998. Investigations into the early life history of naturally produced spring chinook salmon in the Grande Ronde River basin. Oregon Department of Fish and Wildlife, La Grande, OR. Annual Progress Report to Bonneville Power Administration. Project No. 92-026-04 (https://efw.bpa.gov/Environment/EW/EWP/DOCS/REPORTS/HABITAT/H33299-4.pdf).

Lindsay, R.B., and five co-authors. 1986. Study of wild spring chinook salmon in the John Day River System. Oregon Department of Fish and Wildlife, Portland, OR. Final Report to Bonneville Power Administration. Project No. 79-004-00.
https://efw.bpa.gov/Environment/EW/EWP/DOCS/REPORTS/HABITAT/H39796-1.pdf

Thedinga J.F., M.L. Murphy, S.W. Johnson, J.M. Lorenz, and K.V. Koski. 1994. Determination of salmonid smolt yield with rotary screw traps in the Situk River, Alaska, to predict effects of glacial flooding. North American Journal of Fisheries Management. 14:837-851.

Wilson, W.A., J.R. Ruzycki, R.W. Carmichael, S. Onjukka, G. Claire, and J. Seals. 2001. John Day Spring Chinook Salmon Escapement and Productivity Monitoring. Annual Progress Report to Bonneville Power Administration. Project No. 98-016-00.
Account Type(s):
Expense
Contract Start Date:
02/01/2011
Contract End Date:
01/31/2012
Current Contract Value:
$340,660
Expenditures:
$340,660

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
4(d) Report A: 165. Produce NEPA checklist and Regulatory Clearances to BPA 12/30/2011 12/30/2011
SAR & abundance estimates B: 157. SAR and Outmigrant Abundance 12/30/2011 12/30/2011
Professional Presentation of Results C: 161. Present Project Data at Professional Meetings 03/11/2011 03/11/2011
Funding Package - Submit draft to COTR D: 119. SOW and Budget for FY 2012 10/20/2011 10/20/2011
September Accrual Submittal E: 119. Provide September Accrual Information 09/01/2011 09/01/2011
Final report uploaded to the BPA website G: 132. Submit Annual Report for the period (2/01/10) to (1/31/11) 04/30/2011 04/29/2011

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Produce NEPA checklist and Regulatory Clearances to BPA 02/01/2011
B 157 SAR and Outmigrant Abundance 03/26/2012
C 161 Present Project Data at Professional Meetings 02/01/2011
D 119 SOW and Budget for FY 2012 02/01/2011
E 119 Provide September Accrual Information 02/01/2011
F 185 Periodic Status Reports for BPA 02/01/2011
G 132 Submit Annual Report for the period (2/01/10) to (1/31/11) 02/01/2011