Province | Subbasin | % |
---|---|---|
Blue Mountain | Imnaha | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Ensure Environmental Compliance Requirements Have Been Met | A: 165. Ensure Environmental Compliance Requirements Have Been Met | 12/31/2012 | 12/31/2012 | |
Manage and Administer Project | B: 119. Manage and Administer Project | 12/31/2012 | 12/31/2012 | |
Local and Regional Smolt Monitoring Project Planning | C: 122. Local and Regional Smolt Monitoring Project Planning | 12/31/2012 | 12/31/2012 | |
Attend Smolt Monitoring and Fish Production Coordination Meetings | D: 189. Attend Smolt Monitoring and Fish Production Coordination Meetings | 12/31/2012 | 12/31/2012 | |
Install and remove screw traps | E: 70. Install and Remove Screw Traps | 12/31/2012 | 12/31/2012 | |
Operate Juvenile Screw Trap | F: 157. Operate Juvenile Screw Trap | 12/01/2012 | 12/01/2012 | |
PIT Tag Natural Origin Steelhead | G: 158. PIT Tag Natural Origin Steelhead | 12/31/2012 | 12/31/2012 | |
Collect PIT Tag Data | H: 157. Collect PIT Tag Data | 12/31/2012 | 12/31/2012 | |
Analyze PIT Tag Data | I: 162. Analyze PIT Tag Data | 12/31/2012 | 12/31/2012 | |
Analyze Length and Weight Data | J: 162. Analyze Length and Weight Data | 12/31/2012 | 12/31/2012 | |
Upload/Download PIT Tag Data to/from the PTAGIS Database | K: 159. Upload/Download PIT Tag Data to/from the PTAGIS Database | 12/31/2012 | 12/31/2012 | |
Download River Flow and Temperature Data | L: 159. Download River Flow and Temperature Data | 12/31/2012 | 12/31/2012 | |
Public Outreach for Fisheries Education | M: 99. Public Outreach For Fisheries Education | 12/31/2012 | 12/31/2012 | |
Disseminate Summary Reports | N: 161. Disseminate Summary Reports | 12/31/2012 | 12/31/2012 | |
Attach Progress Report in Pisces | P: 132. Submit Progress Report for the period Jan 2011 to Dec 2011 | 12/31/2012 | ||
Attach Progress Report in Pisces | Q: 132. Submit Progress Report for the period (Jan 2010) to (Dec 2010) | 06/22/2012 | ||
Attach Progress Report in Pisces | R: 132. Submit Progress Report for the period (Jan 2009) to (Dec 2009) | 02/06/2012 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened) |
|
Steelhead (O. mykiss) - Snake River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Ensure Environmental Compliance Requirements Have Been Met | 01/01/2012 | ||||||
B | 119 | Manage and Administer Project | 01/01/2012 | ||||||
C | 122 | Local and Regional Smolt Monitoring Project Planning | 01/01/2012 | ||||||
D | 189 | Attend Smolt Monitoring and Fish Production Coordination Meetings | 01/01/2012 | ||||||
E | 70 | Install and Remove Screw Traps | 01/01/2012 | ||||||
F | 157 | Operate Juvenile Screw Trap | 01/01/2012 | ||||||
G | 158 | PIT Tag Natural Origin Steelhead | 01/01/2012 | ||||||
H | 157 | Collect PIT Tag Data | 01/01/2012 | ||||||
I | 162 | Analyze PIT Tag Data | 01/01/2012 | ||||||
J | 162 | Analyze Length and Weight Data | 01/01/2012 | ||||||
K | 159 | Upload/Download PIT Tag Data to/from the PTAGIS Database | 01/01/2012 | ||||||
L | 159 | Download River Flow and Temperature Data | 01/01/2012 | ||||||
M | 99 | Public Outreach For Fisheries Education | 01/01/2012 | ||||||
N | 161 | Disseminate Summary Reports | 01/01/2012 | ||||||
O | 185 | Periodic Status Reports for BPA | 01/01/2012 | ||||||
P | 132 | Submit Progress Report for the period Jan 2011 to Dec 2011 | 01/01/2012 | ||||||
Q | 132 | Submit Progress Report for the period (Jan 2010) to (Dec 2010) | 01/01/2012 | ||||||
R | 132 | Submit Progress Report for the period (Jan 2009) to (Dec 2009) | 01/01/2012 |