Contract 56065 REL 21: 2007-246-00 EXP RESTORATION OF BULL TROUT PASS
Project Number:
Title:
Restoration of Bull Trout Passage at Albeni Falls Dam
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Pend Oreille 100.00%
Contract Number:
56065 REL 21
Contract Title:
2007-246-00 EXP RESTORATION OF BULL TROUT PASS
Contract Continuation:
Previous: Next:
56065 REL 18: 2007-246-00 EXP PNNL RESTORATION OF BULL TROUT PASS
  • 56065 REL 24: 2007-246-00 EXP PNNL RESTORATION OF BULL TROUT PASS
Contract Status:
Closed
Contract Description:
The primary goal of the proposed project is to monitor and evaluate the effectiveness of a fish trap installed in the tailrace of Albeni Falls Dam by the Kalispel Tribe of Indians (herein ‘Tribe’).  The Tribe requested the assistance of PNNL to evaluate the trap based on their experience with telemetry monitoring technologies and over a decade of unique experience studying migratory bull trout at Albeni Falls Dam and in the Pend Oreille River system.  The trap will be primarily designed to capture migrating bull trout Salvelinus confluentus and westslope cutthroat trout Oncorhynchus clarki lewisi, which will then be manually transported above Albeni Falls Dam by the Tribe as a means of temporary passage until a more permanent fish passage structure is built.  
A secondary goal is to continue operation of previously installed telemetry equipment downstream of Albeni Falls Dam that are being used to evaluate use of coldwater refuges of bull trout; refuges that are necessary for fish entrained downstream of AFD to survive high summer water temperatures.

PNNL has two objectives for the May 2017 - April 2018 contract period:

1) Determine the movement behavior of tagged fish within the tailrace of Albeni Falls Dam and whether they enter the fish trap, or come in close proximity of the trap but do not enter it.
2) Continue radio telemetry system monitoring downstream of Albeni Falls Dam in the Pend Oreille River to identify bull trout use of coldwater refuge habitat.
Account Type(s):
Expense
Contract Start Date:
05/01/2017
Contract End Date:
04/30/2018
Current Contract Value:
$70,482
Expenditures:
$70,482

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Martin Allen Bonneville Power Administration Yes COR mballen@bpa.gov (503) 230-5115
Amber Allman Pacific Northwest National Laboratory No Contract Manager amber.allman@pnnl.gov (509) 375-2039
Brian Bellgraph Pacific Northwest National Laboratory Yes Supervisor brian.bellgraph@pnnl.gov (509) 371-7185
Desmond Gelman Bonneville Power Administration No CO Assistant dxgelman@bpa.gov (503) 230-4960
Kristen Jule Bonneville Power Administration Yes F&W Approver krjule@bpa.gov (503) 230-3588
Joe Maroney Kalispel Tribe Yes Interested Party jmaroney@knrd.org (509) 447-7272
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Jennifer Snyder Bonneville Power Administration Yes Env. Compliance Lead jasnyder@bpa.gov (503) 230-4187
Janie Vickerman Pacific Northwest National Laboratory Yes Administrative Contact janie.vickerman@pnnl.gov (509) 371-7260


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Ensure environmental compliance requirements are complete B: 165. Complete environmental compliance requirements 04/30/2018 04/30/2018
3 new sites and new antenna at fish trap C: 70. Install new telemetry equipment 06/30/2017 06/30/2017
Functioning radio monitoring stations throughout study period D: 157. Maintain and download radio receiving stations 04/30/2018 04/30/2018
Develop a profile of each fish tracked E: 162. Data reduction and analysis 02/28/2018 02/28/2018
Completed Annual Report F: 132. Submit Progress Report for the period 1 Jan 2017 through 31 Dec 2017 04/30/2018
All administrative tasks fulfilled with timely quality products G: 119. Manage Project 04/30/2018 04/30/2018
Testing and calibration of all monitoring stations, or remove stations H: 70. Test all stations prior to next monitoring season, if applicable. Otherwise, uninstall equipment. 04/30/2018 04/24/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Trout, Bull (S. confluentus) (Threatened)
  • 2 instances of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 05/01/2017
B 165 Complete environmental compliance requirements 05/01/2017
C 70 Install new telemetry equipment 05/01/2017
D 157 Maintain and download radio receiving stations 05/01/2017
E 162 Data reduction and analysis 05/01/2017
F 132 Submit Progress Report for the period 1 Jan 2017 through 31 Dec 2017 05/01/2017
G 119 Manage Project 05/01/2017
H 70 Test all stations prior to next monitoring season, if applicable. Otherwise, uninstall equipment. 05/01/2017