Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 56586: 2010-001-00 EXP DILLWATER ELJ AND SIDE CHANNEL ENHANCEMENT
Project Number:
Title:
Upper Columbia Programmatic Habitat
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 25.00%
Methow 25.00%
Okanogan 25.00%
Wenatchee 25.00%
Contract Number:
56586
Contract Title:
2010-001-00 EXP DILLWATER ELJ AND SIDE CHANNEL ENHANCEMENT
Contract Continuation:
Previous: Next:
51530: 2010-001-00 EXP DILLWATER ELJ AND SIDE CHANNEL ENHANCEMENT
Contract Status:
Closed
Contract Description:
This project is a carry over from 2011 Targeted Solicitation Process.  The project was delayed due to high flows during the construction window and the inability to perform instream work.

This is one of three projects funded, in part, by BPA (matching funds from SRFB and USFWS) through the Upper Columbia Habitat Project in initially for the FFY 2011 (project # 2010-001-00).  The costs associated with administering this contract are covered under the programmatic project (contract # 55221).  

This newly proposed project is located within the mainstem Entiat River at River Mile (RM) 21.2 to 21.4 in what is known as the “Stillwater Reach.” This reach will be intensively monitored to quantify the biological response to restoration activities by the ISEMP Program from 2012 – 2014.  Our primary intent is to improve habitat complexity for listed salmonids (spring Chinook and steelhead) by constructing several Engineered Log Jams (ELJs) in the main channel and along the banks. The Entiat River currently lacks significant Large Woody Debris (LWD) due to historical in-stream removal and riparian timber harvest practices which continue to limit natural recruitment (ACOE, 2001). Several investigators have suggested that fish habitat in the Entiat River is of low-quality, in-part, due to a lack of in-stream complexity, cover, and deep pools (examples: Andonaegui, 1999; Bureau of Reclamation, 2009). By directly increasing the amount of LWD in the channel, we will improve habitat quality in this reach, as well as promote a positive trajectory for improved geomorphic function.

This contract is awarded to the UCSRB under the programmatic project contract # 55221. The UCSRB manages and coordinates the overall Upper Columbia Habitat Project through the Targeted Solicitation Process. The UCSRB has subcontracted with Chelan County NRD to serve as project sponsor to implement the project.  Chelan County NRD will advertise and award contracts to various subcontractors to prepare documents, harvest and haul logs, construction access improvements, perform helicopter mobilization, build engineered log jams, haul soil amendments, and revegetate the site after construction.   Chelan County NRD will also subcontract with the USFWS to develop the project design.  Chelan County NRD will subcontract with an engineering firm to review the USFWS design. USFWS and other engineering work falls under WE C.   Funding for this project is split between BPA and the SRFB,  Additionally, the USFWS is providing $30,000 for large woody debris acquisition.
Account Type(s):
Expense
Contract Start Date:
03/01/2012
Contract End Date:
01/31/2013
Current Contract Value:
$110,646
Expenditures:
$110,646

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Roy Beaty Bonneville Power Administration Yes F&W Approver rebeaty@bpa.gov (503) 230-5213
Joseph Connor Bonneville Power Administration Yes COR jwconnor@bpa.gov (503) 230-3172
Douglas Corkran Bonneville Power Administration Yes Env. Compliance Lead dfcorkran@bpa.gov (503) 230-7646
Jennifer Hadersberger Chelan County No Interested Party jennifer.hadersberger@co.chelan.wa.us (509) 667-6682
Mike Kane Chelan County Yes Technical Contact mike.kane@co.chelan.wa.us (509) 667-6467
Julie Morgan Upper Columbia Salmon Recovery Board Yes Supervisor julie.morgan@ucsrb.org (509) 662-4710
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Derek Van Marter Upper Columbia Salmon Recovery Board Yes Contract Manager derek.vanmarter@ucsrb.org (509) 670-1462
Debbie West Upper Columbia Salmon Recovery Board Yes Administrative Contact debbie.west@ucsrb.org (509) 888-7265


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Contract Administration A: 119. Manage BPA contracting requirements 01/31/2013 01/31/2013
Complete EC Permitting Processes B: 165. Complete EC permitting processes 01/29/2013 01/29/2013
Preliminary designs for permitting C: 175. Develop preliminary designs for permitting 04/30/2012 04/30/2012
Install Engineered Log Jams D: 29. Install Engineered Log Jams (ELJs) 01/31/2013 01/31/2013
Floodplain Planting and Restoration E: 47. Plant Floodplain 01/31/2013 01/31/2013

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Manage BPA contracting requirements 02/01/2012
B 165 Complete EC permitting processes 02/01/2012
C 175 Develop preliminary designs for permitting 02/01/2012
D 29 Install Engineered Log Jams (ELJs) 02/01/2012
E 47 Plant Floodplain 02/01/2012
F 185 Periodic Status Reports for BPA 02/01/2012
G 132 Project Completion Report (funded through a separate contract) 02/01/2012