Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 59728: 1988-053-08 EXP OAK SPRINGS ODFW HOOD RIVER PRODUCTION
Project Number:
Title:
Hood River Production Operations and Maintenance (O&M) and Powerdale
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Gorge Hood 100.00%
Contract Number:
59728
Contract Title:
1988-053-08 EXP OAK SPRINGS ODFW HOOD RIVER PRODUCTION
Contract Continuation:
Previous: Next:
54581: 1988-053-08 EXP OAK SPRINGS ODFW HOOD RIVER PRODUCTION
  • 63178: 1988-053-08 EXP OAK SPRINGS ODFW HOOD RIVER PRODUCTION
Contract Status:
Closed
Contract Description:
The Oregon Department of Fish  and Wildlife (ODFW) will operate the incubation, early rearing and raceway ponds at Oak Springs Fish Hatchery that are designed for the production of Hood River summer and winter steelhead. The hatchery manager will be responsible for all phases of the steelhead rearing program, including: isolation incubation and early rearing, disease prevention and treatment, fin marking, and transfer of 50,000 winter steelhead smolts and 40,000 summer steelhead smolts to Hood River acclimation facilities, this hatchery production will require close coordination with other Hood River Production Project personnel, from both ODFW and Confederated Tribes of Warm Springs Indians (CTWS). Coordination will include correct external marking, achieving smolt size objective at the pre-determined time of release, and delivery of fish to acclimation facilities. The ODFW Watershed Coordinator will supervise the hatchery manager.

Acronyms:
HMIS:  Hatchery Management Information System
IHOT:  Integrated Hatchery Operations Team
IHN:  Infectious Hematopoietic Necrosis
Account Type(s):
Expense
Contract Start Date:
10/01/2012
Contract End Date:
09/30/2013
Current Contract Value:
$150,486
Expenditures:
$150,486

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Documentation of environmental compliance completed B: 165. NEPA and ESA compliance for project work 09/30/2013 09/30/2013
Progress toward 50,000 winter steelhead at 5 per pound C: 176. BY2013 Hood River Winter steelhead (50,000 smolts) 09/28/2013 09/28/2013
Transfer of 50,000 winter steelhead at 5 per pound complete D: 176. BY2012 Hood River Winter steelhead (50,000 smolts) 05/15/2013 05/02/2013
Mark 100% of steelhead with a goal of 97% mark retention E: 158. Fin clip 100% of BY2012 steelhead smolts 12/15/2012 12/17/2012
Fully functional fish hatchery to produce quality fish F: 61. Day-to-day and "periodically scheduled" maintenance 09/28/2013 09/28/2013
Ongoing and pre-liberation fish health sampling. G: 60. Periodic fish health sampling 09/30/2013 09/30/2013
Annual Operating Plan uploaded to Pisces H: 174. Annual Operating Plan submitted to BPA 06/30/2013 05/30/2013
Project management activities complete I: 119. Manage Project 09/28/2013 09/28/2013

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 1 instance of WE 176 Produce Hatchery Fish
  • 1 instance of WE 60 Maintain Fish Health
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 158 Mark/Tag Animals
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 176 Produce Hatchery Fish

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 10/01/2012
B 165 NEPA and ESA compliance for project work 10/01/2012
C 176 BY2013 Hood River Winter steelhead (50,000 smolts) 10/01/2012
D 176 BY2012 Hood River Winter steelhead (50,000 smolts) 10/01/2012
E 158 Fin clip 100% of BY2012 steelhead smolts 10/01/2012
F 61 Day-to-day and "periodically scheduled" maintenance 10/01/2012
G 60 Periodic fish health sampling 10/01/2012
H 174 Annual Operating Plan submitted to BPA 10/01/2012
I 119 Manage Project 10/01/2012
J 132 No Annual Report due under this contract 10/01/2012