Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 61818: 2003-017-00 EXP ISEMP - TERRAQUA COODINATION WENATCHEE/ENTIAT R
Project Number:
Title:
Integrated Status and Effectiveness Monitoring Program (ISEMP)
BPA PM:
Stage:
Complete
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
61818
Contract Title:
2003-017-00 EXP ISEMP - TERRAQUA COODINATION WENATCHEE/ENTIAT R
Contract Continuation:
Previous: Next:
57863: 2003-017-00 EXP ISEMP - TERRAQUA COODINATION WENATCHEE/ENTIAT R
  • 65674: 2003-017-00 EXP ISEMP - TERRAQUA COORDINATION-WENATCHEE/ENTIAT R
Contract Status:
Closed
Contract Description:
Contract Description: The Integrated Status and Effectiveness Monitoring Program (ISEMP, 2003-017-00) is an ongoing collaborative effort to design, test, implement and evaluate Status and Trends Monitoring for salmon and steelhead populations and their habitat, and watershed-scale Effectiveness Monitoring for management actions impacting salmon and steelhead populations and habitat in the Interior Columbia River Basin.

ISEMP explicitly addresses work requirements of many 2008 FCRPS Biological Opinion RPAs (56.1, 56.2, 56.3, 57.1, 57.2, 57.3, 57.4, 57.5) and is directly related to additional 2008 FCRPS Biological Opinion implementation strategy requirements and recommendations. ISEMP takes a pilot-project approach to the research and development of monitoring by implementing experimental programs in several major subbasins of the Interior Columbia: the Wenatchee, Entiat, Methow, John Day, South Fork Salmon and Lemhi River basins. The overall goal of the project is to provide regional salmon management agencies with the data, information and tools necessary to design efficient and effective monitoring programs.

Specifically, ISEMP generates quantitative guidance on and examples of: the robustness and limitations of population and habitat monitoring protocols, indicators and metrics; sampling design approaches for the distribution of monitoring effort in time and space; analytical approaches to the evaluation of monitoring data, information and programs; effective data management and communication designs that support the use, standardization and compilation of implementation, compliance, status, trends and effectiveness monitoring data by regional data generators and decision makers; and finally the design and implementation of watershed-scale restoration actions to maximize both the biological impact and associated learning opportunities resulting from the design and implementation strategy.

Through its work to date, ISEMP has developed expertise in the coordination and implementation of large-scale monitoring data collection programs. Applying this experience, ISEMP coordinates the installation, maintenance and calibration of in-stream PIT tag arrays across the Snake River basin and is designing and coordinating the implementation of a Columbia River basin-wide stream habitat status and trends monitoring. These programmatic implementation facets of ISEMP leverage previous experience with logistics and social factors to effectively implement comprehensive, standardized monitoring research and development at an unprecedented scale.  

This contract is one of several contracts that will implement this project.


The final report for this contract will contain data that will 1) be submitted to NOAA Fisheries (also a contractor under this project) for use in a project level integrated Annual Report and 2) be submitted to BPA as a contract final report according to the terms of this contract.  Terraqua's role has been, and continues to be, to enable the Bonneville Power Administration to continue to implement Project #2003-017-00 in the Wenatchee and Entiat and other pilot subbasins. Objectives of this work have been, and continue to be:

In 2013,

- Coordinate contract development between Bonneville and entities participating in implementation of ISEMP in the Wenatchee/Entiat and other pilot subbasins.

- Coordinate contract implementation between Bonneville and entities participating in ISEMP in the Wenatchee/Entiat and other pilot subbasins to ensure that implementation activities meet the purpose and needs of ISEMP.

- Implement selected monitoring and analysis activities.

- Analyze and report results related to the implementation of monitoring activities.

However, for FY13 Terraqua has removed some tasks and reduced the scope of other tasks that were included in Release#6 to fit the scope of work with the level of funding for FY13:
1)  Implementation Strategy Updates and Protocol development is once again not funded for FY13;
2)  The scope of some reporting elements that were more prominent in earlier releases has been reduced, e.g WE D 15.2 Program Reporting has been reduced by 32%
Account Type(s):
Expense
Contract Start Date:
07/01/2013
Contract End Date:
06/30/2014
Current Contract Value:
$745,150
Expenditures:
$745,150

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract
Pricing Method:
Time and Materials
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
David Byrnes Bonneville Power Administration Yes COR dmbyrnes@bpa.gov (503) 230-3171
Chris Fryefield Bonneville Power Administration Yes Env. Compliance Lead cbfryefield@bpa.gov (503) 230-4187
Chris Jordan National Oceanic and Atmospheric Administration Yes Supervisor chris.jordan@noaa.gov (541) 754-4629
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Pamela Nelle Terraqua, Inc. Yes Technical Contact pamela@terraqua.biz (509) 885-8143
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Michael Ward Terraqua, Inc. Yes Contract Manager mike@terraqua.biz (509) 486-2426


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance supporting documentation B: 165. 15.13 Environmental Compliance (Fast Track) 07/12/2013 11/19/2013
Meeting minutes / Coordination reports C: 189. 15.1 ISEMP Wenatchee/Entiat/Methow Coordination 06/30/2014 06/30/2014
Produce final FY12 ISEMP Synthesis Program Report D: 141. 15.2 ISEMP Program Report 06/30/2014
Meeting minutes E: 189. 15.4 ISEMP Pilot Subbasin Coordination 06/30/2014 06/30/2014
Final field data F: 157. 15.7 Entiat IMW - Effectiveness - Habitat Monitoring 11/30/2013 02/28/2014
Assist with PIT tagging fish G: 158. 15.8 PIT tag juveniles as part of the Entiat IMW 06/30/2014 06/30/2014
CHaMP habitat data from up to 50 sites in the Wenatchee and Entiat watersheds H: 157. 15.9 Fish Habitat Status and Trend Monitoring in two subbasins 11/30/2013 11/30/2013
Fish monitoring data from up to 50 status and trend sites I: 158. 15.10 PIT tagging juvenile salmon and steelhead for UC status and trend monitoring 11/30/2013 11/30/2013
Upper Columbia data analysis preparation and reporting J: 162. 15.12 Upper Columbia Data Analysis Preparation and Reporting 06/30/2014 06/30/2014
Funding Package - Submit draft to COTR K: 119. 15.13 Project Management (Fast Track) 06/30/2014 06/30/2014
Social structure underlying community of practice fish and habitat monitoring and restoration M: 162. 15.14 Develop models of information and learning flow 06/30/2014 06/30/2014
Steelhead scale analysis N: 157. 15.15 Steelhead scale analysis 06/30/2014 06/30/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (Oncorhynchus mykiss) - All Populations
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 07/01/2013
B 165 15.13 Environmental Compliance (Fast Track) 07/01/2013
C 189 15.1 ISEMP Wenatchee/Entiat/Methow Coordination 07/01/2013
D 141 15.2 ISEMP Program Report 07/01/2013
E 189 15.4 ISEMP Pilot Subbasin Coordination 07/01/2013
F 157 15.7 Entiat IMW - Effectiveness - Habitat Monitoring 07/01/2013
G 158 15.8 PIT tag juveniles as part of the Entiat IMW 07/01/2013
H 157 15.9 Fish Habitat Status and Trend Monitoring in two subbasins 07/01/2013
I 158 15.10 PIT tagging juvenile salmon and steelhead for UC status and trend monitoring 07/01/2013
J 162 15.12 Upper Columbia Data Analysis Preparation and Reporting 07/01/2013
K 119 15.13 Project Management (Fast Track) 07/01/2013
L 132 15.13 Submit Progress Report for the period January 2013 through December 2013 07/01/2013
M 162 15.14 Develop models of information and learning flow 07/01/2013
N 157 15.15 Steelhead scale analysis 07/01/2013