Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 63047: 1991-061-00 EXP SWANSON LAKES WILDLIFE AREA O&M
Project Number:
Title:
Swanson Lake Wildlife Mitigation
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Crab 100.00%
Contract Number:
63047
Contract Title:
1991-061-00 EXP SWANSON LAKES WILDLIFE AREA O&M
Contract Continuation:
Previous: Next:
59964: 1991-061-00 EXP SWANSON LAKES WILDLIFE AREA O&M
  • 66989: 1991-061-00 EXP SWANSON LAKES O&M PROJECT IMPLEMENTATION
Contract Status:
Closed
Contract Description:
The Swanson Lakes Wildlife Area (SLWA) was initially approved as a wildlife mitigation project in 1992 and was re-approved for operations and maintenance (O&M) funding in 2002 under the Sub-basin Planning Process for the Columbia Plateau Province. This project partially addresses adverse impacts caused by the construction of Chief Joseph and Grand Coulee hydroelectric dams. On the Swanson Lakes Wildlife Area, wildlife habitat enhancement efforts to meet mitigation objectives have been performed between 1993 and 2006, with enhancements completed as of 2006. Continued operation and maintenance activities funded by BPA are necessary to maintain wildlife habitat benefits and to ensure BPA's mitigation obligation is met. These activities are essential to further the goal of the Washington Department of Fish and Wildlife (WDFW) to protect shrubsteppe and other habitats necessary to recover and sustain local and region-wide populations of Columbian sharp-tailed grouse.

Management actions planned for FY 14 include continued weed control, and management of extant shrubsteppe and riparian habitats, both  pre-existing and restored or enhanced sites, to maintain current HU values at SLWA. This may include activities such as replanting shrubs and trees lost to unexpected mortality, and inter-seeding restored grasslands if needed.

Roads, fences, parking areas, signs, and the kiosk will be maintained, repaired and replaced as needed. Debris and garbage will be removed and disposed of. Facilities, vehicles, and equipment will be maintained. One all-terrain vehicle, year model 1995, is scheduled for replacement. Facility maintenance costs may fluctuate unexpectedly, due to the advanced age of the headquarters building, a farmhouse built about 1915. Examples of possible unexpected costs would be minor to extensive sub-roofing or plumbing repairs.

Other tasks listed in the contract will be performed as needed.
Account Type(s):
Expense
Contract Start Date:
10/01/2013
Contract End Date:
09/30/2014
Current Contract Value:
$225,033
Expenditures:
$225,033

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Deliverable: Receipt of environmental compliance clearance from BPA B: 165. Environmental compliance documentation 12/31/2013 12/31/2013
Functional boundary fencing and gates C: 186. Maintain fences and gates 09/30/2014 09/30/2014
Maintained roads, culverts, parking areas, signs, and kiosk D: 188. Maintain roads, culverts, parking areas and signs 09/30/2014 09/30/2014
Land leased from WDNR - WDFW Real Estate section can provide copies of leases. E: 92. Maintain leases 09/30/2014 09/30/2013
Safe, functional buildings and wells F: 186. Maintain facilities 09/30/2014 09/30/2014
Administrative duties completed G: 119. General project administration 09/30/2014 09/30/2014
Maintain extant and restored habitat, control noxious weeds. H: 198. Maintain extant/restored vegetation and control weeds 09/30/2014 09/30/2011
Annual report of FY 13 activities I: 132. Submit Progress Report for the period October 2012 through September 2013 02/15/2014 03/17/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 1 instance of WE 198 Maintain Vegetation
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 92 Lease Land

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 10/01/2013
B 165 Environmental compliance documentation 10/01/2013
C 186 Maintain fences and gates 08/04/2014
D 188 Maintain roads, culverts, parking areas and signs 09/24/2013
E 92 Maintain leases 08/20/2013
F 186 Maintain facilities 08/04/2014
G 119 General project administration 07/18/2013
H 198 Maintain extant/restored vegetation and control weeds 10/01/2013
I 132 Submit Progress Report for the period October 2012 through September 2013 10/01/2013