Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 63276: 1998-019-00 EXP WIND RIVER WATERSHED USGS
Project Number:
Title:
Wind River Watershed
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Gorge Wind 100.00%
Contract Number:
63276
Contract Title:
1998-019-00 EXP WIND RIVER WATERSHED USGS
Contract Continuation:
Previous: Next:
59821: 1998-019-00 EXP WIND RIVER WATERSHED USGS
  • 66668: 1998-019-00 EXP WIND RIVER WATERSHED USGS
Contract Status:
Closed
Contract Description:
Title: Wind River Watershed Project: FY2014

The Wind River Watershed Project has a goal of increasing instream PIT-tag detection capabilities within the Wind River subbasin.  Increased PIT tagging of parr steelhead and deployment of instream readers in tributary and mainstem locations will contribute to understanding of varying life-histories of steelhead within the Wind River.  Expanded instream detection capability within the watershed will also provide companion data to help track adult and smolt populations within the Wind Subbasin and can inform managers about the efficacy of restoration actions.  

Below are listed some of the specific research questions we hope to address with increased data and scope of work.


The Wind River Project involves data collection under two of the monitoring types listed in the Draft Columbia River Basin Monitoring, Evaluation, Research, and Reporting Plan (MERR): 1) Status and Trend, and 2) Action Effectiveness.  Status and trend data (abundance estimates) are collected on wild lower Columbia River steelhead smolts and adults in the Wind River subbasin, which is managed as a wild steelhead sanctuary with no hatchery steelhead.  These data, and a study design that will allow evaluation of the removal of Hemlock Dam on Trout Creek, will provide Action Effectiveness Monitoring for habitat restoration actions including Hemlock Dam removal and instream restoration actions.  The MERR recommends that Action Effectiveness Monitoring be conducted in an intensively monitored watershed, which the Wind River has been listed as by the Washington Salmon Recovery Funding Board (SRFB) and the Lower Columbia River Salmon Recovery Plan (Ruckelshaus and Koenings 2005; LCFRB 2004a).

The Columbia River Basin Research Plan (CRBRP) lists 12 focal research areas, each with critical uncertainties that need to be addressed.  The work of the Wind River Project will contribute information to four of these focal research areas and their associated critical uncertainties.

Tributary and Mainstem Habitat –
Work with lower Columbia River (LCR) steelhead in the Wind River will help address questions related to the full life cycle of this salmonid species.
Critical uncertainties that Wind River data can contribute to understanding:
1)To what extent do tributary habitat restoration actions affect the survival, productivity, distribution, and abundance of native fish populations?
2)Are the current procedures being used to identify limiting habitat factors accurate?

Harvest –
PIT tagging of LCR steelhead in the Wind River provides marked fish to determine losses of adult steelhead between Bonneville Dam and the Wind River due to tribal harvest and sport fishery mortality.
Critical uncertainties that Wind River data can contribute to understanding:
1)What are the effects of fishery interceptions and harvest in mixed-stock areas, such as the ocean and mainstem Columbia, on the abundance, productivity and viability of ESUs or populations, and how can fishery interceptions and harvests of ESUs or populations, both hatchery and wild, best be managed to minimize the effects of harvest on the abundance, productivity, and viability of those ESUs and populations?

Population Structure and Diversity –
Work with LCR steelhead in the Wind River subbasin and its watersheds will provide data to evaluate processes influencing their distribution, interconnection, and population dynamics through time and space.  Estimation of populations of smolts and adults and PIT tagging of parr coupled with instream PIT tag readers in mainstem and tributaries to provide data on movement and rearing habits will contribute to understanding of co-occurring life-history types and use of tributary and mainstem habitats.
Critical uncertainties that Wind River data can contribute to understanding:
1)What approaches to population recovery and habitat restoration are most effective in regaining meta-population structure and diversity that will increase viability of fish and wildlife in the Columbia River Basin?

Monitoring and Evaluation –
Monitoring of LCR steelhead populations in the Wind River provides a critical dataset on a wild steelhead population in the Lower Columbia, relatively free of hatchery influence.  Evaluation of habitat restorations projects, including the removal of Hemlock Dam, will help to quantify what gains may be expected from restoration actions taken to restore depressed populations of wild steelhead.
Critical uncertainties that Wind River data can contribute to understanding:
1) Can a common probabilistic (statistical) site selection procedure for population and habitat status and trend monitoring be developed cooperatively?
2) Can empirical (e.g. regression) models for prediction of current abundance or presence-absence of focal species concurrent with the collection of data on status and trends of wildlife and fish populations and habitat be developed.


The Wind River Subbasin Plan outlines a number of goals that on-going work in the Wind River will help to address.  Work with PIT tagging and instream detection systems in mainstem and tributaries will provide information to help address the goal that the summer steelhead population in the Wind River be productive, abundant, exhibits multiple life history strategies, and utilize significant portions of the subbasin.  Implementation of habitat project, along with monitoring of habitat and water temperatures will help address the goals of lowering water temperatures, improving flows, and restoring habitat diversity.


The ISRP/ISAB Tagging Report (ISRP/ISAB 2009) makes a number of recommendations for improvements and better collection of data with various tagging methods.  Because the Wind River Project is using PIT tags and includes monitoring of parr to smolt to adult life history strategies and survivals, we will be deploying multiple instream PIT tag detection systems.  These methods and data should help further knowledge related to recommendation 3.5, which states: “We recommend for PIT tags, further development of prototype in-stream transceivers for detection in tributaries to monitor smolt and adult movements in both large and small tributaries to better understand salmonid behavior and migration timing, fate of juvenile, smolt, and adult migrants before and after dam passage and to spawning grounds.”   Installation of multiple instream PIT-tag detection systems in the mainstem Wind River and tributaries will help further the understanding of knowledge that can be gained with these systems.

The Tagging Report lists, as examples of data contributing to better understanding of salmonid behavior and migration timing, the fall migrants documented at Beaver Creek in the Methow Subbasin and Rattlesnake Creek in the White Salmon Subbasin.  Both of these projects were done by personnel from USGS Columbia River Research Laboratory (CRRL) who will be primary personnel in the Wind River project.  These varied life history expressions are critical to a complete understanding of salmonid population dynamics and may be critical to maintain with environmental changes through restoration, climate change, or introduced species.  

In-stream detection does require some ability to estimate detection efficiencies at different life-stages and flows.  Personnel from CRRL have been exploring methods for efficiencies (Connolly et al. 2008) and guidelines have been provided (Connolly 2010) in the PNAMP Special Publication, Tagging, Telemetry, and Marking Measures for Monitoring Fish Populations (Chapter 7, Wolf and O’Neal 2010).



Objectives, Tasks, and Methods


OBJ 1. Build and install a multiplexing PIT tag interrogation system in Trout Creek at the Forest Road 43 Bridge..  
      
OBJ 2. Maintain six PIT tag interrogation systems.  Ensure data from PIT tag interrogators are submitted to the PTAGIS database.

OBJ 3. PIT tag 1,500 steelhead parr in headwater areas of the Wind River subbasin.

OBJ 4. Produce an Annual Report covering November 2012 - December 2013 activities.

OBJ. 5. Begin to compile and synthesize recapture and interrogation data from steelhead parr PIT tagged in the Wind River to date.

OBJ 6. Maintain at least five thermologgers in the Wind River subbasin at locations where steelhead parr are being PIT tagged.
Account Type(s):
Expense
Contract Start Date:
11/01/2013
Contract End Date:
10/31/2014
Current Contract Value:
$191,635
Expenditures:
$191,635

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Patrick Connolly US Geological Survey (USGS) Yes Supervisor pconnolly@usgs.gov (509) 538-2299x269
Elizabeth Gordon US Geological Survey (USGS) No Administrative Contact egordon@usgs.gov (509) 538-2299x241
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Mary Haight Bonneville Power Administration Yes COR mthaight@bpa.gov (503) 230-3112
Ian Jezorek US Geological Survey (USGS) Yes Contract Manager ijezorek@usgs.gov (509) 538-2908
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Seok Wilson US Geological Survey (USGS) No Administrative Contact shwilson@usgs.gov (509) 538-2299


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Document that all EC has been completed B: 165. Obtain Environmental Compliance Coverage 10/31/2014 10/30/2014
All administrative tasks fulfilled with timely quality products C: 119. Manage Project 10/31/2014 10/30/2014
Attach Progress Report in Pisces D: 132. Submit Technical Progress Report for period (Nov2012) to (Dec2013) 03/15/2014 05/28/2014
2013 BiOp Annual Report E: 141. Submit BiOp Annual Report 03/15/2014 03/15/2014
Share project information F: 191. Share project activity and progress with partner agencies 10/31/2014 10/30/2014
Maintain thermologgers G: 157. Maintain and download thermologgers 10/31/2014 10/30/2014
Maintain upper Wind PIT tag interrogation system H: 157. Maintain the upper Wind PIT tag interrogation system and ensure data collection 10/31/2014 10/30/2014
Maintain PIT tag interrogation system I: 157. Maintain the Trout Creek PIT tag interrogation system and ensure data collection 10/31/2014 10/30/2014
PIT tag 1,500 steelhead parr J: 158. PIT tag a total of 1,500 steelhead parr in the headwaters of the Wind River subbasin 10/31/2014 10/15/2014
Maintain the three Allflex PIT tag interrogators K: 157. Maintain the three Allflex PIT tag interrogators 10/31/2014 10/30/2014
Install a PIT tag interrogation system in Trout Creek at the 43 Road L: 70. Install a PIT tag interrogation system in Trout Creek at the 43 Road 10/31/2014 09/12/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 4 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 11/01/2013
B 165 Obtain Environmental Compliance Coverage 11/01/2013
C 119 Manage Project 11/01/2013
D 132 Submit Technical Progress Report for period (Nov2012) to (Dec2013) 11/01/2013
E 141 Submit BiOp Annual Report 11/01/2013
F 191 Share project activity and progress with partner agencies 11/01/2013
G 157 Maintain and download thermologgers 08/30/2013
H 157 Maintain the upper Wind PIT tag interrogation system and ensure data collection 08/30/2013
I 157 Maintain the Trout Creek PIT tag interrogation system and ensure data collection 08/30/2013
J 158 PIT tag a total of 1,500 steelhead parr in the headwaters of the Wind River subbasin 08/30/2013
K 157 Maintain the three Allflex PIT tag interrogators 08/30/2013
L 70 Install a PIT tag interrogation system in Trout Creek at the 43 Road 08/27/2014