SOW Report
Contract 63588: 1997-015-01 EXP IMNAHA RIVER SMOLT MONITORING - NPT
Project Number:
Title:
Imnaha River Steelhead Status and Smolt Monitoring
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Imnaha 100.00%
Contract Number:
63588
Contract Title:
1997-015-01 EXP IMNAHA RIVER SMOLT MONITORING - NPT
Contract Continuation:
Previous: Next:
60624: 1997-015-01 EXP IMNAHA RIVER SMOLT MONITORING - NPT
  • 67554: 1997-015-01 EXP IMNAHA RIVER SMOLT MONITORING - NPT
Contract Status:
Closed
Contract Description:
A:  ADMINISTRATIVE SUMMARY:

Organization:  Nez Perce Tribe
Address:  P.O. Box 365, Lapwai, ID 83540
Project Leader:  James R. Harbeck
Telephone:  (541) 432-2501
Address:  500 N. Main St, Joseph Oregon 97846
Administrative Contact: Arleen Henry
Telephone:   (208) 843-7317 Ext. 3833

B:  AUTHORIZATION:
The Fish Passage Center's Smolt Monitoring Program is identified in Appendix G of the 2000 FCRPS Biological Opinion (action 1193).  The Northwest Power Planning Council's 1987 Fish and Wildlife Program established the Fish Passage Center (FPC) to manage fish mitigation measures on behalf of the fishery agencies and tribes represented on the Columbia Basin Fish and Wildlife Authority (CBFWA). The FPC accomplishes this through the Smolt Monitoring Program (SMP).  SMP is implemented at selected smolt monitoring sites. The Nez Perce Tribe operates one of these sites on the Imnaha River.  The objectives of the SMP program are: 1) planning and implementing the annual smolt monitoring program, 2) developing and implementing flow and spill requests, and 3) monitoring and analyzing research results to assist in implementing the water budget and spill planning and in preparing reports."

C:  COORDINATION:
This project has been ongoing since 1994 as part of the Smolt Monitoring by Non-Federal Entities (Project No. 198712700) and the FPC's SMP.  It is coordinated with all salmon managers in the Columbia River basin through the Columbia Basin Fish and Wildlife Authority.  It is closely coordinated with ongoing Lower Snake River Compensation Plan (LSRCP) hatchery evaluation studies in the Imnaha River and with the Oregon Department of Fish and Wildlife through annual operation plan meetings.  The LSRCP program provides cost-share funds which are tightly coordinated to ensure collection of an essential time series of information on anadromous salmonids emigrating primarily through the fall and spring from the Imnaha River which is not duplicated by other efforts. The Imnaha SMP program will also continue to monitor throughout the year to provide better estimates of smolt production. The program will continue to coordinate with the Northeast Oregon Hatchery Monitoring and Evaluation program to develop and implement a study design to assess juvenile salmonid survival and smolt to adult returns to Lower Granite Dam (LGR) through technical work groups within NPT.

D:  BACKGROUND:

The USFWS Lower Snake River Compensation Plan (LSRCP) funded the first two years (1992 and 1993) of this project, through the BPA.  Direct BPA funding began in 1994.  This project provides the FPC's SMP with tributary specific emigration data from the Imnaha River.  It continues a collection of a time series of Chinook salmon and steelhead smolt arrival and survival information to mainstem dams.  The project now monitors emigration from the Imnaha River for 10 or more months in the year. This allows for estimates of the total emigrating wild populations.

The FPC will be provided with an index of daily fish catch and condition from the Imnaha River, and smolt performance characteristics past the series of hydroelectric projects on the Snake and Columbia River.  Indices of fish passage, migration strength (or peak migration) and migration timing are provided for Imnaha River smolts at key monitoring sites and mainstem dams.  PIT tagged smolts also provide measures of smolt travel time and in-river survival through key index reaches.  This is accomplished by individual tag detections at mainstem sites on the lower Snake and Columbia rivers.  Additionally, fish quality and descaling information are collected at the Imnaha River trap and provide indicators of the health of emigrating smolts.  The data provided to the FPC is used for in-season operational decisions relative to flow and spill management, particularly during periods when spill is being provided to improve smolt passage.    

Smolt monitoring and PIT tagging is conducted during the spring, fall and winter emigration periods.  The project will PIT tag up to 4,600 natural steelhead smolts during the spring to provide emigration timing, travel time, and estimated survival from the mouth of the Imnaha River to Snake River and Columbia River dams.  The project will assist the LSRCP hatchery evaluation study with PIT tagging additional steelhead smolts depending on the needs of the LSRCP project.  The project will also assist LSRCP with PIT tagging spring and fall emigrating natural Chinook salmon smolts.
Account Type(s):
Expense
Contract Start Date:
01/01/2014
Contract End Date:
12/31/2014
Current Contract Value:
$345,167
Expenditures:
$345,167

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Briana Anderson Fish Passage Center No Interested Party banderson@fpc.org (503) 230-4099
Katey Grange Bonneville Power Administration No Interested Party kcgrange@bpa.gov (503) 230-4047
James Harbeck Nez Perce Tribe Yes Contract Manager jimh@nezperce.org (541) 432-2501
Arleen Henry Nez Perce Tribe No Administrative Contact arleenh@nezperce.org (208) 621-3833
Jay Hesse Nez Perce Tribe Yes Supervisor jayh@nezperce.org (208) 621-3552
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Donald Rose Bonneville Power Administration Yes Interested Party dlrose@bpa.gov (503) 230-3796
Barbara Shields Bonneville Power Administration Yes COR bashields@bpa.gov (503) 230-4748
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Jason Vogel Nez Perce Tribe No Interested Party jasonv@nezperce.org (208) 621-3602
Jesse Wilson Bonneville Power Administration Yes Env. Compliance Lead jcwilson@bpa.gov (503) 230-4506


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Ensure Environmental Compliance Requirements Have Been Met B: 165. Ensure Environmental Compliance Requirements Have Been Met 12/31/2014 12/31/2014
Manage and Administer Project C: 119. Manage and Administer Project 12/31/2014 12/31/2014
Local and Regional Smolt Monitoring Project Planning D: 122. Local and Regional Smolt Monitoring Project Planning 12/31/2014 12/31/2014
Install and remove screw traps E: 70. Install and Remove Screw Traps 12/31/2014 01/01/2014
Operate Juvenile Screw Trap F: 157. Operate Juvenile Screw Trap 12/31/2014 12/31/2014
PIT Tag Natural Origin Steelhead G: 158. PIT Tag Natural Origin Steelhead 12/31/2014 12/31/2014
Collect PIT Tag Data H: 157. Collect PIT Tag Data 12/31/2014 12/31/2014
Analyze PIT Tag Data I: 162. Analyze PIT Tag Data 12/31/2014 12/31/2014
Upload/Download PIT Tag Data to/from the PTAGIS Database J: 159. Upload/Download PIT Tag Data to/from the PTAGIS Database 12/31/2014 12/31/2014
Analyze Biological Data K: 162. Analyze Biological Data 12/31/2014 12/31/2014
Download River Flow and Temperature Data L: 159. Download River Flow and Temperature Data 12/31/2014 12/31/2014
Public Outreach for Fisheries Education M: 99. Public Outreach For Fisheries Education 12/31/2014 12/31/2014
Disseminate Project Information N: 161. Disseminate Project Information 12/31/2014 12/31/2014
Attach Progress Report in Pisces O: 132. Submit Progress Report for the period (Jan 1, 2013) to (Dec 31, 2013) 11/15/2014
BiOp Report P: 141. BiOp reporting for BPA RM&E report format and the creation of the RPA Report in Taurus 12/31/2014 05/12/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 2 instances of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 2 instances of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 2 instances of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 2 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 01/01/2014
B 165 Ensure Environmental Compliance Requirements Have Been Met 01/01/2014
C 119 Manage and Administer Project 01/01/2014
D 122 Local and Regional Smolt Monitoring Project Planning 01/01/2014
E 70 Install and Remove Screw Traps 10/28/2013
F 157 Operate Juvenile Screw Trap 10/28/2013
G 158 PIT Tag Natural Origin Steelhead 10/28/2013
H 157 Collect PIT Tag Data 10/28/2013
I 162 Analyze PIT Tag Data 01/01/2014
J 159 Upload/Download PIT Tag Data to/from the PTAGIS Database 01/01/2014
K 162 Analyze Biological Data 01/01/2014
L 159 Download River Flow and Temperature Data 01/01/2014
M 99 Public Outreach For Fisheries Education 01/01/2014
N 161 Disseminate Project Information 01/01/2014
O 132 Submit Progress Report for the period (Jan 1, 2013) to (Dec 31, 2013) 01/01/2014
P 141 BiOp reporting for BPA RM&E report format and the creation of the RPA Report in Taurus 01/01/2014