Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 67276: 2007-396-00 CAP WALLA WALLA BASINWIDE TRIB PASSAGE
Project Number:
Title:
Walla Walla Basinwide Tributary Passage and Flow
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Walla Walla 100.00%
Contract Number:
67276
Contract Title:
2007-396-00 CAP WALLA WALLA BASINWIDE TRIB PASSAGE
Contract Continuation:
Previous: Next:
63647: 2007-396-00 CAP WALLA WALLA BASINWIDE TRIB PASSAGE
Contract Status:
Closed
Contract Description:
A three-mile segment of the Walla Walla River near Milton-Freewater, Oregon, was dewatered each summer for the last century creating the need for fish rescues.  The rescues have not been necessary the last eleven years after aggressive irrigation efficiency programs and new wells now maintain at least 27 cfs instream throughout the spring and 25 cfs instream throughout the summer.  However, half of these bypass flows are created by an increase in supplemental well use at unsustainable rates.  Additional irrigation conservation practices, combined with winter/spring groundwater recharge, will allow irrigators to reduce their demand on the river, reduce negative impacts to groundwater, and protect the conserved water as instream water rights. Projects planned under this contract will help WWBWC and the Walla Walla Basin continue their efforts to increase water in the Walla Walla River, its tributaries, and the shallow aquifer in order to ensure viable fish habitat in the basin.
Account Type(s):
Capital
Contract Start Date:
11/01/2014
Contract End Date:
10/31/2015
Current Contract Value:
$38,634
Expenditures:
$38,634

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Jonathan Goodman Bonneville Power Administration Yes Env. Compliance Lead jdgoodman@bpa.gov (503) 230-4764
Wendy Harris Walla Walla Basin Watershed Council Yes Contract Manager wendy.harris@wwbwc.org (541) 938-2170
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Amber MacLachlan Bonneville Power Administration Yes Contracting Officer almcmahon@bpa.gov (503) 230-3983
Brien Rose US Geological Survey (USGS) No Interested Party brose@usgs.gov (509) 538-2299x360
Brian Wolcott Walla Walla Basin Watershed Council No Supervisor brian.wolcott@wwbwc.org (541) 938-2170
Tracey Yerxa Bonneville Power Administration Yes COR tyerxa@bpa.gov (503) 230-4738


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
All administrative tasks fulfilled with timely quality products B: 119. Admin oversight for Cap Activities 10/31/2015 10/31/2015
Environmental Compliance complete C: 165. Environmental Compliance Documentation for all cap actions 10/31/2015 10/31/2015
Little Walla Walla Diversion Telemetry Installed D: 84. Little Walla Walla Diversion Telemetry 10/31/2015 10/31/2015
WWRID Frog Measurement Device Installed E: 148. WWRID Frog Measurement 04/30/2015 02/27/2015

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 148 Install Flow Measuring Device
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 148 Install Flow Measuring Device
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 148 Install Flow Measuring Device

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 11/01/2014
B 119 Admin oversight for Cap Activities 11/01/2014
C 165 Environmental Compliance Documentation for all cap actions 11/01/2014
D 84 Little Walla Walla Diversion Telemetry 06/26/2015
E 148 WWRID Frog Measurement 11/01/2014
F 132 No Annual Progress Report Due Under This Contract 11/01/2014