Province | Subbasin | % |
---|---|---|
Columbia Plateau | Walla Walla | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Full Name | Organization | Write Permission | Contact Role | Work Phone | |
---|---|---|---|---|---|
Dawn Boorse | Bonneville Power Administration | Yes | Env. Compliance Lead | drboorse@bpa.gov | (503) 230-5678 |
Jonathan Goodman | Bonneville Power Administration | Yes | Interested Party | jdgoodman@bpa.gov | (503) 230-4764 |
Wendy Harris | Walla Walla Basin Watershed Council | Yes | Contract Manager | wendy.harris@wwbwc.org | (541) 938-2170 |
Peter Lofy | Bonneville Power Administration | Yes | F&W Approver | ptlofy@bpa.gov | (503) 230-4193 |
Amber MacLachlan | Bonneville Power Administration | Yes | Contracting Officer | almcmahon@bpa.gov | (503) 230-3983 |
Brian Wolcott | Walla Walla Basin Watershed Council | Yes | Supervisor | brian.wolcott@wwbwc.org | (541) 938-2170 |
Tracey Yerxa | Bonneville Power Administration | Yes | COR | tyerxa@bpa.gov | (503) 230-4738 |
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
All administrative tasks fulfilled with timely quality products | B: 119. Admin Oversight for Expense Activities | 10/31/2015 | 10/31/2015 | |
Environmental Compliance complete | C: 165. Environmental Compliance Documentation for all exp actions | 10/31/2015 | 10/31/2015 | |
Final Designs for Upcoming Projects | D: 175. Produce Final Designs for Upcoming Projects | 10/31/2015 | 10/31/2015 | |
Mud Creek Recharge Site Constructed | E: 98. Mud Creek Recharge | 10/31/2015 | 10/31/2015 | |
Chuckhole Recharge Site Constructed | F: 98. Chuckhole Recharge | 10/31/2015 | 10/31/2015 | |
Fruitvale Recharge Site Constructed | G: 98. Fruitvale Recharge | 10/31/2015 | 10/31/2015 | |
Washington Mud Creek Recharge Site Constructed | H: 98. Washington Mud Creek Recharge Project | 10/31/2015 | 10/31/2015 | |
Anspach Recharge Expansion Site Constructed | I: 98. Anspach Recharge Expansion | 10/31/2015 | 10/31/2015 | |
Anspach Recharge Expansion Piping | J: 98. Anspach Recharge Pipeline | 10/31/2015 | 10/31/2015 | |
Recharge wells installed | K: 98. Install Recharge Wells | 10/30/2015 | 10/30/2015 | |
Smith Sill Fish Passage Improvement completed | L: 85. Smith Sill Fish Passage Improvement Project | 10/31/2015 | 09/30/2015 | |
Surface Water Data collected for recharge projects and water monitoring | M: 157. Collect Surface Water Data for Recharge project and Water monitoring | 10/31/2015 | 10/31/2015 | |
Groundwater Data collected for recharge projects and water monitoring | N: 157. Collect Groundwater Data for Recharge project and Water monitoring | 10/31/2015 | 10/31/2015 | |
Produce accessible, error-checked datasets | O: 157. Collect Water Temperature Data for Recharge project and Water monitoring | 10/31/2015 | 10/31/2015 | |
Updated WWBWC Database | P: 160. Maintain Surface Water Database for Recharge project and Water monitoring | 10/31/2015 | 10/31/2015 | |
Maintain Groundwater Database | Q: 160. Maintain Groundwater Database for Recharge project and Water monitoring | 10/31/2015 | 10/31/2015 | |
Maintain water temperature database | R: 160. Maintain Water Temperature Database for Recharge project and Water monitoring | 10/31/2015 | 10/31/2015 | |
Results on the success of the Recharge Project, On-farm Efficiency, and Water Management | S: 162. Analyze Surface Water Data for Recharge Project | 10/31/2015 | 10/31/2015 | |
Results on the success of the Recharge Project, On-farm Efficiency, and Water Management | T: 162. Analyze Groundwater Data for Recharge Project | 10/31/2015 | 10/31/2015 | |
Results on the success of the Recharge Project, On-farm Efficiency, and Water Management | U: 162. Analyze Water Temperature Data for Recharge Project | 10/31/2015 | 10/31/2015 | |
Education and Outreach | V: 99. Irrigation Efficiency and Aquifer Recharge project | 10/31/2015 | 10/31/2015 | |
Annual Progress Report for period 11-1-13 to 10-31-14 | W: 132. Annual Progress Report (11-1-13 to10-31-14) | 10/31/2015 | ||
EC Only - Locust Road Dual Purpose Bulge | X: 98. Recharge Facility: Locust Road Dual Purpose Bulge | 10/31/2015 | ||
White Ditch Piping - Phase II EC Complete | Z: 203. White Ditch Piping Phase II | 10/31/2015 | ||
Youth and Adult Presentations | AA: 99. Youth and adult presentations | 08/31/2015 | 08/31/2015 | |
White Ditch Piping - Phase 1, Section 2 complete | AB: 203. White Ditch Piping - Phase 1 Section 2 | 10/31/2015 | 10/31/2015 | |
Nursery Bridge Fish Passage and Habitat Assessment Channel Survey Completed | AC: 115. Nursery Bridge Fish Passage & Habitat Assessment Channel Survey | 10/31/2015 | 10/31/2015 | |
Eastside fishway diversion and habitat site survey Completed | AD: 115. Eastside fishway diversion and habitat site survey | 10/31/2015 | 10/31/2015 | |
Gomes and Poe Flow Meters Installed | AE: 148. FWUA Flow Meters | 09/30/2015 | 08/03/2015 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU |
|
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 11/01/2014 | ||||||
B | 119 | Admin Oversight for Expense Activities | 11/01/2014 | ||||||
C | 165 | Environmental Compliance Documentation for all exp actions | 11/01/2014 | ||||||
D | 175 | Produce Final Designs for Upcoming Projects | 11/01/2014 | ||||||
E | 98 | Mud Creek Recharge | 05/28/2015 | ||||||
F | 98 | Chuckhole Recharge | 05/28/2015 | ||||||
G | 98 | Fruitvale Recharge | 05/28/2015 | ||||||
H | 98 | Washington Mud Creek Recharge Project | 08/10/2015 | ||||||
I | 98 | Anspach Recharge Expansion | 11/01/2014 | ||||||
J | 98 | Anspach Recharge Pipeline | 05/28/2015 | ||||||
K | 98 | Install Recharge Wells | 05/28/2015 | ||||||
L | 85 | Smith Sill Fish Passage Improvement Project | 08/14/2015 | ||||||
M | 157 | Collect Surface Water Data for Recharge project and Water monitoring | 11/01/2014 | ||||||
N | 157 | Collect Groundwater Data for Recharge project and Water monitoring | 11/01/2014 | ||||||
O | 157 | Collect Water Temperature Data for Recharge project and Water monitoring | 11/01/2014 | ||||||
P | 160 | Maintain Surface Water Database for Recharge project and Water monitoring | 11/01/2014 | ||||||
Q | 160 | Maintain Groundwater Database for Recharge project and Water monitoring | 11/01/2014 | ||||||
R | 160 | Maintain Water Temperature Database for Recharge project and Water monitoring | 11/01/2014 | ||||||
S | 162 | Analyze Surface Water Data for Recharge Project | 11/01/2014 | ||||||
T | 162 | Analyze Groundwater Data for Recharge Project | 11/01/2014 | ||||||
U | 162 | Analyze Water Temperature Data for Recharge Project | 11/01/2014 | ||||||
V | 99 | Irrigation Efficiency and Aquifer Recharge project | 11/01/2014 | ||||||
W | 132 | Annual Progress Report (11-1-13 to10-31-14) | 11/01/2014 | ||||||
X | 98 | Recharge Facility: Locust Road Dual Purpose Bulge | |||||||
Y | 184 | Nursery Bridge Fish Passage - Phase II | |||||||
Z | 203 | White Ditch Piping Phase II | |||||||
AA | 99 | Youth and adult presentations | 11/01/2014 | ||||||
AB | 203 | White Ditch Piping - Phase 1 Section 2 | 11/01/2014 | ||||||
AC | 115 | Nursery Bridge Fish Passage & Habitat Assessment Channel Survey | 11/01/2014 | ||||||
AD | 115 | Eastside fishway diversion and habitat site survey | 11/01/2014 | ||||||
AE | 148 | FWUA Flow Meters | 11/01/2014 |