Contract 69256: 2010-034-00 EXP CCT-UPPER COLUMBIA-OKANOGAN- SPRING CHINOOK
Project Number:
Title:
Upper Columbia Spring Chinook and Steelhead Juvenile and Adult Abundance, Productivity and Spatial Structure Monitoring
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 5.00%
Methow 35.00%
Okanogan 25.00%
Wenatchee 35.00%
Contract Number:
69256
Contract Title:
2010-034-00 EXP CCT-UPPER COLUMBIA-OKANOGAN- SPRING CHINOOK
Contract Continuation:
Previous: Next:
65556: 2010-034-00 EXP CCT-UPPER COLUMBIA-OKANOGAN- SPRING CHINOOK
  • 72904: 2010-034-00 EXP CCT-UPPER COLUMBIA-OKANOGAN-SPRING CHINOOK
Contract Status:
Closed
Contract Description:
Background Information concerning the overall project:

In 2015 we do not plan to purchase and install any new arrays under this contract but may assists in site development and provide O&M for sites funded through other sources. Additional interrogation system installations may occur in locations within Canada depending on inter governmental approvals and our ability to secure outside funding for equipment purchases and installation support. Additional temporary arrays will be secured as funding allows and placed in Upper Omak Creek, Haynes Creek, Tesdalindon Creek or McClean Creek and ongoing O&M at all sites will be covered under this contract regardless of whom funds the array installation.  

This contract provides funding to expand BPA project # 2010-034-00 into the Okanogan subbasin to complete coverage of the entire Upper Columbia ESU for summer steelhead. The master project is part of a unique, well coordinated,  and standardized group of monitoring and evaluation program(s) that exist in the Upper Columbia River Basin.  Monitoring and evaluation programs are funded by a combination of  federal (BPA, BOR, USFWS), State, Tribal, and regional (PUDs) entities.  While all these various programs contribute data to estimate VSP parameters for spring Chinook and summer steelhead, these programs also share common deficiencies related to precision and accuracy of the abundance estimates.  Existing M & E activities combined with recent advances in PIT tag technology provide an opportunity to improve the quality of the data generated to make proper management decisions concerning ESA listed species.  The overall objectives of the project are to: 1) evaluate precision and accuracy of the smolt monitoring methodology for both steelhead and spring Chinook , 2) estimate the proportion of hatchery steelhead in each primary population, 3) estimate the precision of redd counts for both steelhead and spring Chinook and 4) evaluate the accuracy of the steelhead spawning ground survey design.  This contract provides operations and maintenance support to the Colville Tribes that supports basin wide PIT tag integration infrastructure used for a multitude of monitoring and evaluation efforts.  These tasks address in part or fully the critical uncertainties identified under Supplementation in the Columbia River Basin Research Plan (2006-03) and steelhead population characteristics (abundance, productivity, and ratio of hatchery fish) under the Fish and Wildlife Program.  Additionally, all of the studies in this proposal are directly consistent with RPAs for the FCRPS BiOp.  In summary, the umbrella project seeks to build on the existing programs in all the subbasins while this contract focuses on supporting the PIT tagging efforts specific to the Okanogan River basin. This contract provides information and equipment needed for long term monitoring of VSP parameters with a known level of accuracy and precision of the Okanogan subbasins summer steelhead population that link directly to a subset of tasks contained in the umbrella project (i.e. PIT-tag array deployment and development of precision and accuracy estimates, validation of summer steelhead redd survey methodology, and potentially a more viable way to enumerate adult steelhead returns under all environmental conditions).

Prior to this project only one intermittent PIT tag array existed in the Okanogan River basin on Omak Creek. With the funding from this project the Colville Tribes have partnered with WDFW, CRITFC, ONA, Grant PUD, Douglas PUD and BPA to embark upon creating a basin wide network of PIT-tag interrogation systems throughout the Okanogan River basin numbering close to 30 when the goal is fully realized. This contract supports installation of some sites and ongoing O&M for all sites within the Okanogan River Basin. Two types of arrays are used in the Okanogan River Basinwide PIT-tag array. Permanent arrays are used to enumerate both adult returns and juvenile out-migrants on perennial streams and the mainstem river. Temporary interrogation sites are installed, operated, and removed annually on a seasonally basis primarily to document distribution extents of adult steelhead, to document fish passage at barriers, and to enumerate adult returns to intermittent watersheds. The O&M for all these arrays is provided under this contract.

WDFW will be the research lead for the project and will conduct all the analysis and complete research reports, obtain all necessary environmental compliance permits under CR-285357 for the project which includes CR-285358. Andrew Murdoch will be the point of contact for WDFW.  Colville Tribes will be the primary contractor for array installation, operation, and maintenance of sites located within the Okanogan Basin.  John Arterburn is the point of contact for the Colville Tribes.

BiOp reporting for this contract will be covered under CR# 285357, 2010-034-00 EXP UPPER COLUMBIA SPRING CHINOOK, by Andrew Murdoch of the WDFW.
Account Type(s):
Expense
Contract Start Date:
07/01/2015
Contract End Date:
06/30/2016
Current Contract Value:
$150,000
Expenditures:
$150,000

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance documents provided under CR-285357 A: 165. Environmental compliance documents for this project provided under CR-285357 06/30/2016 06/30/2016
All administrative tasks fulfilled with timely quality products B: 119. Manage and administer project 06/30/2016 06/30/2016
Conducted site specific assessments and developed landowner agreements C: 114. Conduct site specific assessments and develop landowner agreements 12/31/2015 12/31/2015
PIT tag recapture data uploaded D: 159. Upload PIT tag data to PTAGIS database 06/30/2016 06/30/2016
Number and age of hatchery and wild steelhead based upon PIT tag detections estimated E: 162. Estimate the number and age of hatchery and wild steelhead 03/31/2016 03/31/2016
Installed, operated, maintain, and removed temporary PIT tag antennas F: 70. Construct, install, maintain, and remove temporary PIT tag arrays in preselected locations 06/30/2016 06/30/2016
Keep permanent sites fully operational G: 98. Operate , maintain, and update existing permanent PIT-tag array infrastructure 06/30/2016 06/30/2016
Support the lead Project Sponsor H: 202. BiOp RPA Report for CY 2015 06/30/2016 06/30/2016

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 98 Other
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental compliance documents for this project provided under CR-285357 07/01/2015
B 119 Manage and administer project 07/01/2015
C 114 Conduct site specific assessments and develop landowner agreements 07/01/2015
D 159 Upload PIT tag data to PTAGIS database 07/01/2015
E 162 Estimate the number and age of hatchery and wild steelhead 07/01/2015
F 70 Construct, install, maintain, and remove temporary PIT tag arrays in preselected locations 07/01/2015
G 98 Operate , maintain, and update existing permanent PIT-tag array infrastructure 07/01/2015
H 202 BiOp RPA Report for CY 2015
I 185 Periodic Status Reports for BPA 07/01/2015
J 132 Submit Progress Report - Not applicable in this contract 07/01/2015