Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 71355: 2010-001-00 EXP BARKLEY BEAR PRE-IMPLEMENTATION
Project Number:
Title:
Upper Columbia Programmatic Habitat
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 25.00%
Methow 25.00%
Okanogan 25.00%
Wenatchee 25.00%
Contract Number:
71355
Contract Title:
2010-001-00 EXP BARKLEY BEAR PRE-IMPLEMENTATION
Contract Continuation:
Previous: Next:
n/a
  • 74958: 2010-001-00 EXP BARKLEY BEAR PRE-IMPLEMENTATION
Contract Status:
Closed
Contract Description:
Methow Salmon Recovery Foundation (MSRF) and its partners, including Bureau of Reclamation (Reclamation), UCSRB, and USGS plan to implement a reach-scale salmon habitat enhancement project in the Middle Methow (M2) River in FY 2018. The Barkley Bear Pre-Implementation Project will conduct project development and environmental compliance activities in advance of the implementation contract for the M2 Barkley Bear Habitat Project funded through the UCSRB targeted solicitation process.

Project development activities for this project include on-site vegetation surveys, topographic surveys, hydrologic monitoring and data collection, wetland delineation, fish surveys (presence/absence/use), photo points, pre-implementation weed removal, concept development, landowner/stakeholder outreach and coordination, and related project coordination activities.  MSRF will also coordinate with BPA to initiate the HIP III design/review process for the larger implementation project.

Environmental compliance for this pre-implementation effort includes Section 106 cultural consultation, limited federal Section 7 ESA consultation (USFWS and NOAA) as needed for pre-implementation activities such as surveying, geotechnical investigations, or installation of test wells.  The state-required SEPA process was completed previously for the reach-based M2 project prior to work at Whitefish Island (2012) and WDFW Floodplain (2013).  Other permitting processes completed through APPS for  the WDFW Hydraulic Project Authorization and the JARPA process for Corps of Engineers Nationwide permits, county shorelines and floodplain development, and water quality permits may also be initiated and/or completed in this contract if sufficient design information is completed during the contract period.  

The goal of this Barkley Bear pre-implementation contract would be to work with BPA, UCSRB, the Bureau of Reclamation, and USGS to develop and design a preferred alternative for implementation at the site and to complete state, local, and BPA's federal EC requirements as early in the process as feasible in order to ensure completion of these requirements within the respective timelines, to allow construction to proceed in 2018.
Account Type(s):
Expense
Contract Start Date:
02/15/2016
Contract End Date:
02/14/2017
Current Contract Value:
$67,465
Expenditures:
$67,465

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Complete Environmental Compliance permitting processes A: 165. Obtain Required Permits, Authorizations, and Documentation for the Barkley Bear project 02/14/2017 02/14/2017
All administrative tasks fulfilled with timely quality products B: 119. Manage BPA Contracting Requirements 02/14/2017 02/14/2017
Obtain data to support design C: 115. Obtain Data to Inform Development of Preferred Alternative 02/14/2017 02/14/2017
Select Preferred Alternatives and Initiate Design Process D: 174. Develop Preferred Alternatives for Design Development 02/14/2017 02/14/2017

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 174 Produce Plan
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 174 Produce Plan

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Obtain Required Permits, Authorizations, and Documentation for the Barkley Bear project 02/15/2016
B 119 Manage BPA Contracting Requirements 02/15/2016
C 115 Obtain Data to Inform Development of Preferred Alternative 10/17/2016
D 174 Develop Preferred Alternatives for Design Development 02/15/2016
E 185 Periodic Status Reports for BPA 02/15/2016
F 132 Submit Progress Report for the period (FEB 2016) to (FEB 2017) - funded through a separate contract 02/15/2016