Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
71445
Contract Title:
2010-003-00 EXP LOWER SOUTH FORK CLEARWATER RESTORATION 2016
Contract Continuation:
Previous: Next:
67897: 2010-003-00 EXP LOWER SOUTH FORK CLEARWATER RESTORATION 2015
  • 75330: 2010-003-00 EXP LOWER SOUTH FORK CLEARWATER/SLATE CREEK WATERSHED
Contract Status:
Closed
Contract Description:
Contract History:

This project is implemented as part of the Nez Perce-Clearwater National Forests (NPCNF)/Nez Perce Tribe (NPT) restoration partnership.  This project represents a merger of two ongoing Bonneville Power Administration (BPA) and NPT restoration projects, #1996-077-05, Meadow Creek Watershed Restoration and #2000-036-00, Mill Creek Watershed Restoration, and an expansion of the project area to include all of the NPCNF lands in the lower South Fork Clearwater River Basin rather than just selected watersheds.  The restoration partnership has been ongoing in the basin since 1996 and this project unification greatly increases the geographic area covered, and enhances the administrative and financial efficiency in order to maximize the direct benefit to fish and wildlife.

The goal of the project is to restore the physical and biological characteristics of the watershed to provide quality habitat for anadromous and resident fish species that support the historical, cultural, and economic practices of the Nez Perce Tribe.  The South Fork Clearwater River watershed contains proposed critical habitat for listed species Steelhead trout, potential critical habitat for bull Trout, and has moderate habitat potential for Spring Chinook salmon.  Restoration follows a ridge top to ridge top approach with implementation focused on restoring riparian processes by addressing increased water temperatures, increased sedimentation, cattle grazing effects, aquatic habitat connectivity, and exotic, invasive plants.  The cost share for this project has been contributed by the NPCNF who provides at least a 20% match including cash and in-kind contributions. Project planning and implementation responsibilities are also shared with the NPCNF.

FY 16 implementation includes the survey and contract preparation for the future replacement of 1 culvert, 1 culvert replacement (to improve fish passage and hydrologic capacity, reduce potential sediment delivery and provide connectivity), a feasibility study to analyze the impacts of a potential velocity barrier on the South Fork Clearwater River, riparian planting (to decrease water temperatures and reduce potential sediment delivery), fence maintenance (to protect riparian plants), and continued planning and coordination for next year's projects and out-year habitat improvements.  NPT Watershed personnel will also continue an inventory of roads and stream crossings throughout the Lower South Fork Clearwater River watershed in order to identify fish passage barriers and road associated risks to aquatic species.
Account Type(s):
Expense
Contract Start Date:
03/01/2016
Contract End Date:
02/28/2017
Current Contract Value:
$809,471
Expenditures:
$809,471

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Marcie Carter Nez Perce Tribe Yes Supervisor marciec@nezperce.org (208) 621-3534
Miranda Gordon Nez Perce Tribe Yes Technical Contact mirandag@nezperce.org (208) 621-3547
Jenifer Harris Nez Perce Tribe No Interested Party jeniferh@nezperce.org (208) 983-1290
Arleen Henry Nez Perce Tribe No Administrative Contact arleenh@nezperce.org (208) 621-3833
Mark Johnson Nez Perce Tribe Yes Contract Manager markj@nezperce.org (208) 621-3561
Jennifer Lord Bonneville Power Administration Yes COR jklord@bpa.gov (503) 230-5192
Heidi McRoberts Nez Perce Tribe Yes Supervisor heidim@nezperce.org (208) 621-3548
Robert Shull Bonneville Power Administration Yes Env. Compliance Lead rwshull@bpa.gov (503) 230-3962
Emmit Taylor, Jr. Nez Perce Tribe No Technical Contact emmitt@nezperce.org (208) 621-3544
Dorothy Welch Bonneville Power Administration Yes F&W Approver dwwelch@bpa.gov (503) 230-5479
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental compliance documentation submitted to BPA A: 165. Provide environmental compliance information to BPA for projects 02/28/2017 02/28/2017
Culvert replaced B: 184. Replace Leggett Creek Culvert Replacement 11/01/2016 09/01/2016
Designs and Cost Estimates C: 175. Final Design and Cost Estimate for Peasley Creek Culvert 01/31/2017 01/31/2017
Completed MP 28 Fish Passage Study D: 115. Produce Fish Passage Assessment of S. Fork Clearwater River at SH 14, MP 28 02/01/2017 01/31/2017
Riparian Vegetation Planted E: 47. Plant Riparian Vegetation - Previous Restoration Projects 02/28/2017 01/01/2017
Riparian Vegetation Planted F: 47. Plant Riparian Vegetation - McComas Meadows 02/28/2017 02/01/2017
Exclosure Fence Maintained G: 186. Maintain Exclosure Fences - Mill Creek 07/01/2016 06/15/2016
Exclosure fence maintained H: 186. Maintain Exclosure Fences - McComas Meadows 07/01/2016 06/15/2016
Culvert and Bridge Inventory I: 115. Assess Condition of Existing Culverts and Bridges 02/28/2017 02/28/2017
Road Inventory J: 115. Assess Condition of Roads to Identify Aquatic Impacts 02/28/2017 02/28/2017
Manage Projects and Administrative duties K: 119. Management, Coordination, and Communication 02/28/2017 02/28/2017
Upload 2016 Annual Report to Pisces L: 132. 2016 Annual Report - 3/1/2016 - 2/29/2017 02/28/2017 01/20/2017

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 2 instances of WE 47 Plant Vegetation
  • 1 instance of WE 184 Install Fish Passage Structure
  • 3 instances of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 2 instances of WE 47 Plant Vegetation
  • 1 instance of WE 184 Install Fish Passage Structure
  • 3 instances of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Provide environmental compliance information to BPA for projects 03/01/2016
B 184 Replace Leggett Creek Culvert Replacement 03/01/2016
C 175 Final Design and Cost Estimate for Peasley Creek Culvert 01/31/2017
D 115 Produce Fish Passage Assessment of S. Fork Clearwater River at SH 14, MP 28 10/15/2016
E 47 Plant Riparian Vegetation - Previous Restoration Projects 02/24/2016
F 47 Plant Riparian Vegetation - McComas Meadows 02/24/2016
G 186 Maintain Exclosure Fences - Mill Creek 07/01/2016
H 186 Maintain Exclosure Fences - McComas Meadows 03/01/2016
I 115 Assess Condition of Existing Culverts and Bridges 02/28/2017
J 115 Assess Condition of Roads to Identify Aquatic Impacts 02/28/2017
K 119 Management, Coordination, and Communication 03/01/2016
L 132 2016 Annual Report - 3/1/2016 - 2/29/2017 03/01/2016
M 185 Quarterly Status Reports 03/01/2016