Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 71783: 1992-026-01 EXP EAST SHEEP CREEK CULVERT REPLACEMENT
Project Number:
Title:
Grande Ronde Model Watershed
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
71783
Contract Title:
1992-026-01 EXP EAST SHEEP CREEK CULVERT REPLACEMENT
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
Introduction

Sheep Creek and East Sheep Creek is spawning and rearing habitat for summer steelhead and is designated critical habitat for bull trout.  Spring/summer chinook spawning and rearing habitat is located with Sheep Creek.  Redband trout also exist within the above stream. The 5182500 culvert on East Sheep Creek Culvert is currently undersized and does not pass fish at all life stages.  

Project Objectives

•   Improve passage for steelhead, chinook and bull trout.
•   Improve natural flow pattern.  
•   Reduce the risk of culvert failure.

Project Description

Replace culvert 5182500  to provide for adequate fish passage, allow for a natural streambed and meet bankfull criteria. Proposed to be funded through BPA funds.

Highlighted Construction requirements:

a.   Finished road grade shall match the existing road grade.

b.   All tree, shrub, brush removal shall be coordinated with a Forest Service fish biologist or hydrologist prior to removal.

c.   When reconstructing the stream channel, consult with District resource specialists as necessary to achieve final grades and layouts as agreed to by the contracting officer.

d.   Contractor shall use the existing roadway for a staging area.

e.   All material within the existing bankfull width and the ordinary high water mark shall be streambed simulation material, other than the surface course aggregate under the footings.

f.    A USFS fish biologist or hydrologist will be on site when the stream channel and streambed are constructed.  The biologist or hydrologist will ensure that the substrate is sufficient to pass fish and that the material is installed properly to streambed grade level.

g.   All instream work will be completed during the instream work window (July 1 – July 31) of one year.

h.   The dewatering plan shall minimize sediment from entering the stream, maintain stream flows downstream of the work area, and shall be designed to minimize impact on construction of the new culvert.

i.    Fish will be salvaged prior to project implementation with appropriate block nets installed.  An electroshocker will be used to salvage the fish.  The fish will be placed downstream of project operations.
     All fish salvage operations will be supervised by a Forest Service fish biologist.
  
j.    Rehabilitate the site with native seed, mulch and native conifer/deciduous seedlings.
Account Type(s):
Expense
Contract Start Date:
03/01/2016
Contract End Date:
02/28/2017
Current Contract Value:
$0
Expenditures:
$0

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Mason Bailie Grande Ronde Model Watershed Foundation No Interested Party mason@grmw.org (541) 663-0570
Amanda Coffman Grande Ronde Model Watershed Foundation No Contract Manager amanda@grmw.org (541) 663-0570
Mary Estes Grande Ronde Model Watershed Foundation No Interested Party mary@grmw.org (541) 663-0570
Tracy Hauser Bonneville Power Administration Yes COR tlhauser@bpa.gov (503) 230-4296
Aric Johnson US Forest Service (USFS) No Supervisor ajjohnson@fs.fed.us (541) 962-8517
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Joe Platz US Department of Agriculture (USDA) Yes Contract Manager joe.platz@usda.gov (541) 962-8571
Robert Shull Bonneville Power Administration Yes Env. Compliance Lead rwshull@bpa.gov (503) 230-3962
John Skidmore Bonneville Power Administration Yes F&W Approver jtskidmore@bpa.gov (503) 230-5494
Jesse Steele Grande Ronde Model Watershed Foundation No Interested Party jesse@grmw.org (541) 663-0570
Connar Stone Grande Ronde Model Watershed Foundation No Interested Party connar@grmw.org (541) 663-0570
Alexandra Towne Grande Ronde Model Watershed Foundation Yes Interested Party alex@grmw.org (541) 663-0570


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Produce Environmental Compliance Documents A: 165. Environmental Compliance 01/31/2017
Culvert Replacement for Fish Passage B: 184. Road 510 East Sheep Creek Culvert Replacement 11/30/2016
All administrative tasks fulfilled with timely quality products C: 119. Project Contract Administration 01/31/2017

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 184 Install Fish Passage Structure
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 184 Install Fish Passage Structure

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance 03/01/2016
B 184 Road 510 East Sheep Creek Culvert Replacement 03/08/2016
C 119 Project Contract Administration 03/01/2016
D 132 East Sheep Creek Culvert Replacement Completion Report - March 2016 - January 2017 03/01/2016
E 185 Periodic Status Reports for BPA 03/01/2016