Obtain all necessary permits. Work with BPA EC lead, Invasive species management and prevention |
B: 165. Environmental Compliance |
|
04/30/2022 |
04/22/2022 |
Effective implementation management and timely contract administration |
D: 119. Administrative Oversight of the Chief Joseph Hatchery M&E Program |
|
04/30/2022 |
04/22/2022 |
A data set on rotary screw trap operations and a section of the Annual Report |
E: 157. Assessing Summer/Fall Chinook Outmigrants with a Rotary Screw Trap on the Okanogan River |
|
02/28/2022 |
02/28/2022 |
Present juvenile outmigration results at the APR and update status and trends in annual report |
F: 162. Analyze Juvenile Chinook Outmigration |
|
04/30/2022 |
03/29/2022 |
Upload PIT tag files to PTAGIS |
G: 158. Collect and PIT Tag Natural-Origin Juvenile Summer Chinook Salmon |
|
07/16/2021 |
07/23/2021 |
An error-checked dataset and report in AFS manuscript style |
H: 162. Genotype Okanogan and Similkameen Chinook Baseline Samples |
|
04/30/2022 |
03/02/2022 |
Update key assumptions in ISIT, presentation at APR and section of annual report. |
I: 162. Estimate Spring and Summer Chinook Migration and Survival Using Pit Tags |
|
04/30/2022 |
03/11/2022 |
Produce accessible, error-checked datasets |
J: 157. Conduct Spring Chinook Spawning Ground Surveys in the Okanogan Tributaries |
|
04/30/2022 |
03/25/2022 |
Conduct trapping and monitor Okanogan weir operations and section of the Annual Report |
K: 157. Okanogan River Temporary Weir Operations |
|
04/30/2022 |
04/15/2022 |
Present results at the APR and generate a section of the annual report for weir monitoring. |
L: 162. Analyze Results of Weir Monitoring |
|
03/31/2022 |
03/29/2022 |
Produce accessible, error-checked datasets and section of the Annual Report |
M: 157. Monitor Natural Juvenile Spring Chinook Productivity |
|
04/30/2022 |
03/18/2022 |
Produce accessible, error-checked datasets and section of the Annual Report |
N: 162. Analyze Juvenile Spring Chinook Productivity |
|
04/30/2022 |
03/11/2022 |
Produce accessible, error-checked datasets |
O: 157. Conduct Summer/Fall Chinook Redd Surveys on the Okanogan and Similkameen Rivers |
|
04/29/2022 |
02/25/2022 |
Produce accessible, error-checked datasets |
P: 157. Conduct Summer/Fall Chinook Carcass Collection on the Okanogan and Similkameen Rivers |
|
03/31/2022 |
03/25/2022 |
Spawning ground survey summary and analysis for APR presentations, ISIT, and the annual report |
Q: 162. Analyze Data for Summer/Fall Chinook Spawning Ground Surveys |
|
04/30/2022 |
03/30/2022 |
Produce accessible, error-checked datasets |
R: 157. Collect Water for eDNA |
|
04/29/2022 |
04/22/2022 |
APR presentation and section of the annual report |
S: 162. Analysis of Water Samples for eDNA |
|
04/30/2022 |
03/29/2022 |
Produce accessible, error-checked datasets and tissue samples for CRITFC |
T: 157. Collect Tissue Samples for PBT |
|
11/19/2021 |
11/18/2021 |
Produce accessible, error-checked datasets |
U: 157. Collect Scales from CJH Summer/Fall Broodstock |
|
03/31/2022 |
02/11/2022 |
Hatchery APR presentation and a section of the annual report |
V: 162. Determine Age Structure of Integrated Broodstock |
|
04/30/2022 |
03/29/2022 |
Produce accessible, error-checked datasets |
W: 157. Process Coded Wire Tag Snouts in a Lab |
|
04/29/2022 |
03/04/2022 |
Produce accessible, error-checked datasets |
X: 157. Estimate Tribal Harvest for Spring and Summer/Fall Chinook |
|
12/31/2021 |
11/30/2021 |
Data summary and analysis input to ISIT, presented at APR and a section of the annual report |
Y: 162. Retrieve and Analyze CWT Information for Okanogan Summer/Fall Chinook |
|
04/30/2022 |
03/29/2022 |
Maintenance and enhancement of the CJH M&E and Harvest applications and reporting tools with data storage backup |
Z: 160. Database and Module Maintenance and Enhancement |
|
04/30/2022 |
04/22/2022 |
CJHP Annual Program Review Tool Updates and Maintenance |
AA: 162. Assimilate and Analyze ISIT Input Parameters |
|
04/30/2022 |
04/22/2022 |
2021 Annual Program Review (APR) and section of the annual report |
AB: 161. Annual Program Review |
|
04/30/2022 |
04/13/2022 |
Completed Annual Report |
AC: 132. Submit 2018 Annual Progress Report- CJH Summer Chinook |
|
06/30/2021 |
05/17/2021 |
Completed Annual Report |
AD: 132. Submit 2018 Annual Progress Report- CJH Spring Chinook |
|
07/30/2021 |
09/01/2021 |
Completed Annual Reports |
AE: 132. Submit 2019 Annual Progress Report |
|
04/29/2022 |
04/28/2022 |
Completed Annual Reports |
AF: 132. Prepare Draft 2020 Annual Progress Reports |
|
04/29/2022 |
|