Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 73982 REL 25: 2002-037-00 EXP FRESHWATER MUSSELS IN UMATILLA & JOHN DAY
Project Number:
Title:
Freshwater Mussel Research and Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Umatilla 100.00%
Contract Number:
73982 REL 25
Contract Title:
2002-037-00 EXP FRESHWATER MUSSELS IN UMATILLA & JOHN DAY
Contract Continuation:
Previous: Next:
73906: 2002-037-00 EXP FRESHWATER MUSSELS IN UMATILLA & JOHN DAY
  • 73982 REL 54: 2002-037-00 EXP FRESHWATER MUSSELS IN UMATILLA & JOHN DAY
Contract Status:
Closed
Contract Description:
This contract for FY2018  is approved under the Columbia Basin Fish Accords 10 year MOA with the Confederated Tribes of the Umatilla Indian Reservation (CTUIR).   Since its inception in 2003, the Freshwater Mussel Project of the CTUIR has conducted research designed to understand the biology and ecology of freshwater mussels. Specifically, the project has focused on three main components designed to determine: 1) the status and distribution of freshwater mussels in CTUIR Tribal lands; (2) factors controlling the distribution and abundance of mussels, and (3) to assess genetic differences among western freshwater mussel species in the Columbia River basin.  The project now begins focus on the long-term goal of restoration of freshwater mussels to the Umatilla River basin as part of ongoing efforts to rebuild ecosystem diversity, function, and traditional cultural opportunities in the basin.

Freshwater mussels in western North America (Genera Anodonta, Margaritifera, and Gonidea) are notoriously understudied, although they have historically been a major component of the biomass in western aquatic systems and likely have a disproportionately large impact on ecological stability and processes in these systems.  BPA and CTUIR have funded pioneering work on the genetic composition and taxonomy of western freshwater mussels.  Now that the basic genetic subdivisions and landscape patterns of genetic variance have been described for these groups of mussels, studies focused on habitat requirements and ecological roles can be designed appropriately.  Such studies are critical for effective monitoring, conservation, and restoration programs.  

CTUIR's interest in conserving freshwater mussels and restoring viable populations is in the context of a “First Foods” resource management on Tribal and ceded lands.  One of the major goals of CTUIR is to restore sustainable populations of freshwater mussels to the Umatilla River system.  The John Day, Grande Ronde, and Walla Walla River systems, on ceded lands, contain populations of freshwater mussels, and are a high priority for conservation.  These river systems (particularly the John Day) also provide opportunities to study the distribution, habitat requirements, and ecosystem functions of freshwater mussels.  Conclusions drawn from the distribution of mussels in this system can inform restoration efforts in other rivers, such as the Umatilla.
Account Type(s):
Expense
Contract Start Date:
10/01/2017
Contract End Date:
09/30/2018
Current Contract Value:
$330,620
Expenditures:
$330,620

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Complete environmental compliance A: 165. Environmental Compliance for mussel project 09/30/2018 09/30/2018
Monitor mussel populations in Umatilla River and other basins B: 157. Monitor mussel populations in Umatilla River and other sub-basins 09/30/2018 09/30/2018
Continue to hold freshwater mussels in Walla Walla laboratory facility C: 157. FW Mussel propagation, culture, and restoration in the Umatilla Sub-basin and other sub-basins 09/30/2018 09/30/2018
Continue to hold host fish in Walla Walla laboratory facility D: 157. House fish at Walla Walla laboratory facility for host work and propagation efforts 09/30/2018 09/30/2018
Produce accessible, error-checked datasets E: 157. Apply and Evaluate BMPs for freshwater mussel relocation activities 09/30/2018 09/30/2018
Supplementation research plan for freshwater mussels F: 174. Develop supplementation research plan for Freshwater Mussel Project 09/30/2018
Submit data to CTUIR central database G: 159. Submit data to CTUIR central database 09/30/2018 09/30/2018
All administrative tasks fulfilled with timely quality products H: 119. Project Management for mussel project 09/30/2018 09/30/2018
2015 Annual Report I: 132. Annual Report for CY2015 01/15/2018 02/07/2018
2016 Annual Report J: 132. Annual Report for CY2016 01/15/2018 02/07/2018
2017 Annual Report K: 132. Annual Report for CY2017 05/01/2018 02/13/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Freshwater Mussels
  • 1 instance of WE 174 Produce Plan
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
Wildlife
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance for mussel project 10/01/2017
B 157 Monitor mussel populations in Umatilla River and other sub-basins 10/01/2017
C 157 FW Mussel propagation, culture, and restoration in the Umatilla Sub-basin and other sub-basins 05/01/2018
D 157 House fish at Walla Walla laboratory facility for host work and propagation efforts 10/01/2017
E 157 Apply and Evaluate BMPs for freshwater mussel relocation activities 10/01/2017
F 174 Develop supplementation research plan for Freshwater Mussel Project 10/01/2017
G 159 Submit data to CTUIR central database 10/01/2017
H 119 Project Management for mussel project 10/01/2017
I 132 Annual Report for CY2015 10/01/2017
J 132 Annual Report for CY2016 10/01/2017
K 132 Annual Report for CY2017 10/01/2017
L 185 Periodic Status Reports for BPA 10/01/2017