Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 74959: 1998-022-00 EXP PINE CREEK CONSERVATION AREA
Project Number:
Title:
Pine Creek Conservation Area
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau John Day 100.00%
Contract Number:
74959
Contract Title:
1998-022-00 EXP PINE CREEK CONSERVATION AREA
Contract Continuation:
Previous: Next:
71455: 1998-022-00 EXP PINE CREEK CONSERVATION AREA
  • 78292: 1998-022-00 EXP PINE CREEK CONSERVATION AREA
Contract Status:
Closed
Contract Description:
Contract for 2017 Operations & Management of the Pine Creek Conservation Area by the Confederated Tribes of Warm Springs:  

The Conservation Area includes the Pine Creek Ranch and Wagner Ranch Acquisitions, and is managed by the Tribes in accordance with the Pine Creek Conservation Area Wildlife Habitat and Watershed Management Plan.   This plan serves as the site-specific management plan called for in Section 3. (b) of the Memorandum of Agreement (MOA)  between the Tribes and BPA.  The MOA is the primary legal document guiding the Tribes' management of the property.  This plan is supplemental to the MOA, and provides further definition to the Tribes commitment to manage the property for fish and wildlife habitat.  

Pine Creek Conservation Area is intended, as a wildlife and watershed mitigation site, to partially offset wildlife habitat losses caused by John Day Dam on the Columbia River.  Habitat management will, as specified in the MOA between BPA and the Tribes, to the extent possible, focus on strategies designed to achieve and maintain native habitat that is naturally self-sustaining.  

In many cases, recovery of watershed functions or native plant communities may only occur over the course of several decades.  Other changes, such as community dominance by invasive species, may be permanent without active intervention on the part of land managers.  Future climate changes may also limit or prevent recovery to historic conditions.  

Where possible, altered or damaged ecosystem functions will be restored through passive restoration techniques, such as the prevention of activities which degrade or prevent recovery.  Passive restoration strategies will be paired with active interventions as needed, such as replacement of culverts creating fish passage barriers.  It is hoped that these efforts will lead to conservation of biodiversity in the form of native fish, wildlife, and plant communities.  

An additional goal for the project is to work in partnership with neighboring landowners, local, state and federal agencies, conservation organizations, and educational groups, and serve as an example of watershed recovery and wildlife habitat management in the lower John Day Basin.  Successful monitoring of changes to vegetation, wildlife, fish use and distribution, and hydrology are critical to this effort.  

Several specific management objectives are described in the approved Wildlife Habitat and Watershed Management Plan, and are to be addressed by this Statement of Work and its Work Elements.  In most cases, WE's are ongoing activities developed in long term furtherance of the objectives.  A set of administrative Work Elements including identification numbers A (165); L (185); M (132) and N (119) within the scope of work will contribute to the achievement of all management plan objectives listed below.  

The following are the management plan objectives most closely pertaining to specific WE identification numbers within this 2017 SOW:

Upland Areas (Section VII in the Plan):  Addressed by WE's D (26); F (198); G (199); H (27); and K (47).
1. Maintain a diverse, dynamic mosaic of native vegetation communities and wildlife habitats.  Maintain or increase the extent of native bunchgrass and shrub steppe communities.  

2. Maintain appropriate vegetation for healthy watershed function, including infiltration, storage, and release of water to maintain or improve water quality, water quantity and the timing and duration of flow.  

3. Allow the occurrence of natural disturbance processes within their range of natural variability and the practical constraints of limited land area and altered ecological potential.    

4. Reduce ongoing encroachment of western juniper into bunchgrass and shrub steppe habitat types.  Reduce the impacts of juniper encroachment on watershed hydrology.  Maintain a diversity of western juniper age classes and habitat structural conditions.  

Riparian Habitat Areas (Section VIII): Addressed by WE's F (198); G (199); J (29); and K (47).
5. Facilitate recovery of riparian systems in Proper Functioning Condition (Prichard, 1998) that will allow development of desired habitat characteristics.  

6. Provide quality aquatic and riparian habitats for native fish and wildlife, within their natural potential.  

7. Establish functioning riparian buffers and wildlife habitat by restoring key native vegetation species in abandoned agricultural fields adjacent to Pine Creek and the John Day River.  

Listed Species (Section IX): Addressed by WE's B (188) (i.e. regulation of uses by the public and outside interests); and A (165) (assuring environmental compliance in management activities and specific projects).
8. Protect habitats of all listed species as appropriate.  

Wildlife and Fish (Section X): Addressed by WE B (188) (i.e. regulation of uses including the hunting program); and WE's F (198); G (199);  J (29); and K (47).
9. Manage for native habitats that will sustain populations of diverse native wildlife species, while providing continued hunting opportunities for tribal members and the public.  

10. Protect, maintain, or increase local populations of native steelhead and redband trout (Oncorhynchus mykiss) by allowing natural recovery of habitat.  

Cultural and Historic Resources (Section XII): Addressed by WE A (165)  and clearances obtained as part of specific projects under other work elements including WE's G (199);  J (29);  and K (47).
13.   Protect cultural and historic resources and avoid impacts to these resources from management activities.  

Introduced Plant Species Management (Section XIV): Addressed by WE's D (26) (reducing cattle impacts); WE F (198) (control of weeds); and K (47) (recovery of degraded lowland fields).
14. Minimize the impacts of introduced species on native vegetation and hydrological function.  

15. Reduce the potential spread of noxious weeds to uninfested areas and neighboring lands.  

Grazing and Fences (Sections XV & XVI): Addressed by WE D (26) (reducing cattle trespass and cooperative repairing of exterior fences); WE F (198) (weed control); and H (27) (removing obsolete interior fence).
16. Allow habitat recovery to occur prior to any managed livestock grazing on deeded lands.  Utilize livestock grazing only as a wildlife habitat management tool, in conjunction with this plan and/ or future revisions.  Coordinate management of Spring Basin, Amine Peak and Rim BLM grazing allotments with Prineville District BLM.  

17. Work with neighbors to maintain or replace boundary fences as necessary to minimize trespass grazing.  

18. Reduce the impact of interior fences on natural movement patterns of wildlife.  

Roads (Section XVII): Addressed through regulating access and public uses of roads under WE B (188), and management of fire buffers and juniper encroachment under WE G (199).
19. Minimize impacts of roads, including erosion and weed dispersal.  Maintain only road segments necessary for management access to property.  Allow unnecessary road segments to revegetate.  

Fire Management (Section XVIII): Addressed indirectly by WE C (99) includes representation of CTWS during responses to any naturally-caused managed wildfires on the property, in a planning/coordination and natural resource advisory capacity.  Addressed directly by WE G (199).
20. Allow wildfires to play a role in the restoration and maintenance of native upland habitats, while taking into consideration concerns of neighboring landowners.  

21. Utilize prescription fires in a safe and appropriate manner to benefit native habitats, e.g., by minimizing juniper encroachment.  

Tribal and Public Access (Section XIX): Addressed by WE's B (188); and C (99).
22. Allow regulated tribal and public access.  Restrict access or activities that may harm natural resources or interfere with achievement of management objectives.  

Land Exchange (Section XX): Addressed by WE I (172).
23. Work with the Prineville District BLM to achieve an equal-value land exchange that would consolidate Conservation Area habitat and facilitate management of tribal and public lands.  

Monitoring and Evaluation (Section XXI): Addressed specifically by WE E (157) and under WE B (188) (research coordination).
24. Accurately monitor and evaluate changes in riparian conditions, upland vegetation, and wildlife habitats, and fish and wildlife use.  Document the effects of management actions.  Facilitate increased understanding of ecosystem recovery processes and potentials.  

25. Encourage natural sciences research and educational activities.  Addressed specifically by WE's B (188);  C (99);  and E (157).
Account Type(s):
Expense
Contract Start Date:
02/01/2017
Contract End Date:
01/31/2018
Current Contract Value:
$411,625
Expenditures:
$411,625

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Robert Brunoe Confederated Tribes of Warm Springs No Supervisor robert.brunoe@ctwsbnr.org (541) 553-2014
Jay Chong Bonneville Power Administration Yes Contracting Officer jxchong@bpa.gov (503) 230-4007
Brian Cochran Confederated Tribes of Warm Springs Yes Contract Manager brian.cochran@ctwsbnr.org (541) 553-2003
Leslie Cochran Confederated Tribes of Warm Springs No Administrative Contact leslie.cochran@wstribes.org (541) 553-3477
Luca De Stefanis Bonneville Power Administration No Env. Compliance Lead ltdestefanis@bpa.gov (503) 230-5263
Lisa Dexter Bonneville Power Administration No Interested Party lldexter@bpa.gov (503) 230-3893
Desmond Gelman Bonneville Power Administration No CO Assistant dxgelman@bpa.gov (503) 230-4960
El Freda Gentry Confederated Tribes of Warm Springs No Administrative Contact elfreda.gentry@wstribes.org (541) 553-3375
Rick Hayes Confederated Tribes of Warm Springs Yes Contract Manager rhh1957@mail.com (541) 763-2116
Dennis Johnson Confederated Tribes of Warm Springs No Interested Party dennis.johnson@wstribes.org (541) 553-3479
Troy Johnson Confederated Tribes of Warm Springs No troy.johnson@ctwsbnr.org (541) 489-3477
Arthur Mitchell Confederated Tribes of Warm Springs No Administrative Contact arthur.mitchell@wstribes.org (541) 553-3219
Tybee Sheidler Bonneville Power Administration No tasheidler@bpa.gov (503) 230-3820
Dorothy Welch Bonneville Power Administration Yes F&W Approver dwwelch@bpa.gov (503) 230-5479
Ellen Wilt Bonneville Power Administration Yes COR ewwilt@bpa.gov (503) 230-5732


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Coordination with BPA Environmental Compliance Group Completed A: 165. Conservation Area Environmental Compliance for Ongoing O&M Activities 01/31/2018 01/31/2018
Public Access Program Implemented B: 188. Manage Public Access and Provide Information 01/31/2018 01/31/2018
CTWS Represented in Community and Partnerships C: 99. Represent the CTWS 01/31/2018 01/31/2018
Trespass Livestock Monitored and Removed D: 26. Monitor for Trespass Livestock and Coordinate Removal with Owners 01/31/2018 01/31/2018
Monitoring Data Collected and Managed E: 157. Collect 2017-2018 Monitoring Data 01/31/2018 01/31/2018
Vegetation Maintained F: 198. Maintain Riparian Plantings and Control Weeds 01/31/2018 01/31/2018
Vegetation Removed G: 199. Remove Western Juniper 01/31/2018 01/31/2018
Ranch Debris Removed H: 27. Remove Interior Fences and Debris Dumps 01/31/2018 01/31/2018
Land Exchange Implementation Actions Completed I: 172. Implement Land Exchange between Tribes and BLM 01/31/2018
Install Artificial Beaver Dam Analogs J: 29. Install Artificial Beaver Dam Analogs 01/31/2018 01/31/2018
Propagate Native Vegetation: Lowland Fields along Pine Creek and areas burned in June 2017 K: 47. Restore Lowland Fields along Pine Creek 01/31/2018 01/31/2018
Administrative Documents Completed and Submitted to BPA L: 119. Prepare Administrative Documents and Submit to BPA 01/31/2018 01/31/2018
Progress Report Completed and Approved M: 132. Produce and Submit Progress Report for Prior Performance Period (2016-2017) 11/30/2017 11/30/2017
Completed building or facility O: 201. Assemble non-plumbed/non-electified storage building at PCCA headquarters 01/31/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 199 Remove Vegetation
  • 1 instance of WE 26 Investigate Trespass
  • 1 instance of WE 27 Remove Debris
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Conservation Area Environmental Compliance for Ongoing O&M Activities 02/01/2017
B 188 Manage Public Access and Provide Information 10/16/2018
C 99 Represent the CTWS 02/01/2017
D 26 Monitor for Trespass Livestock and Coordinate Removal with Owners 02/01/2017
E 157 Collect 2017-2018 Monitoring Data 10/16/2018
F 198 Maintain Riparian Plantings and Control Weeds 10/16/2018
G 199 Remove Western Juniper 10/16/2018
H 27 Remove Interior Fences and Debris Dumps 10/16/2018
I 172 Implement Land Exchange between Tribes and BLM 02/01/2017
J 29 Install Artificial Beaver Dam Analogs
K 47 Restore Lowland Fields along Pine Creek 10/16/2018
L 119 Prepare Administrative Documents and Submit to BPA 02/01/2017
M 132 Produce and Submit Progress Report for Prior Performance Period (2016-2017) 02/01/2017
N 185 Periodic Status Reports for BPA 02/01/2017
O 201 Assemble non-plumbed/non-electified storage building at PCCA headquarters 02/01/2017