Environmental Permits Obtained |
A: 165. NEPA analysis and documentation |
|
04/28/2023 |
03/31/2023 |
Develop/update prioritized project list |
B: 114. Identify and select new restoration projects in the Hangman watershed |
|
04/28/2023 |
03/31/2023 |
Final Design requirements completed |
C: 175. Finalize design to fill man-made channels on k'wne' 'ulchiyark'wmtsut project properties |
|
07/22/2022 |
08/12/2022 |
Man-made channel and ditches filled |
D: 181. Fill drainage ditches on Phase 3 Reach of k'wne' 'ulchiyark'wmtsut (RM 20.3 - 21.1) |
|
04/28/2023 |
04/28/2023 |
Culvert installed on Parrot Creek |
E: 184. Replace Culvert on Parrot Creek at Old Sanders-Imida Road |
|
04/28/2023 |
|
Plant maintenance completed |
F: 198. Maintain vegetation on Hangman Creek, k'wne' 'ulchiyark'wmtsut |
|
04/28/2023 |
03/31/2023 |
Cut aspen provided to beaver at key locations |
G: 186. Maintain beaver dams in Hangman Creek with hardwood supplementation |
|
04/28/2023 |
04/29/2023 |
Remove non-native cutthroat trout |
H: 190. Remove non-native cutthroat trout from Nehchen Creek |
|
04/30/2023 |
04/28/2023 |
Produce dataset |
I: 157. Sample redband trout and non-native salmonids using migration traps |
|
04/30/2023 |
04/30/2023 |
Produce datasets |
J: 157. Sample redband trout in Hangman Creek |
|
02/17/2023 |
01/20/2023 |
Produce datasets |
K: 157. Collect data and maintain fixed PIT tag antennae arrays |
|
04/30/2023 |
04/28/2023 |
Up to 500 fish PIT-tagged in traps and during summer electroshock surveys |
L: 158. Uniquely mark redband trout in upper Hangman Creek |
|
04/30/2023 |
04/28/2023 |
Produce datasets |
M: 157. Monitor water temperature in Hangman Creek |
|
04/28/2023 |
04/28/2023 |
Produce accessible, error-checked datasets |
N: 157. Collect water quality and quantity data in Hangman Creek |
|
02/10/2023 |
03/17/2023 |
Deliverable: An error-checked data set with metadata |
O: 162. Analyze data generated for redband trout captured in migrant traps in Hangman Creek |
|
04/30/2023 |
04/28/2023 |
Deliverable: An error-checked data set with metadata |
P: 162. Analyze data generated from sampling salmonids in tributary habitats in upper Hangman watershed |
|
04/28/2023 |
04/28/2023 |
Deliverable: An error-checked data set with metadata |
Q: 162. Analyze data logged at stationary PIT antenna arrays for Redband trout in Hangman Creek |
|
04/28/2023 |
04/28/2023 |
Deliverable: An error-checked data set with metadata |
R: 162. Analyze stream temperature data in Hangman Creek |
|
04/28/2023 |
04/14/2023 |
Summarized data maintained in ARC Map layers |
S: 161. Summarize redband trout population status and habitat in Hangman Creek using GIS |
|
04/28/2023 |
04/28/2023 |
Watershed Coordination |
T: 191. Coordinate restoration with regional partners |
|
04/28/2023 |
04/28/2023 |
No annual Report Due this Contract |
V: 132. Review Progress Report Format for the period (May 2022 - April 2023) |
|
04/28/2023 |
|
Effective implementation management and timely contract administration |
W: 119. Manage and administer projects |
|
04/28/2023 |
04/28/2023 |