Province | Subbasin | % |
---|---|---|
Middle Snake | Malheur | 100.00% |
* Expenditures data includes accruals and are based on data through 31-Oct-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Cultural Resource clearance complete | B: 165. Complete Environmental Compliance Requirements & Tribal/Cultural Surveys | 12/31/2020 | 12/28/2020 | |
Completed Annual Report | C: 132. Submit Annual Report for 1/1/2019 to 12/31/2019 | 06/05/2020 | 05/27/2020 | |
Prepare Data for 2020 Annual Report | D: 132. Prepare data for draft annual report for period 1/2020 to 12/2020 | 12/31/2020 | 12/28/2020 | |
Project administration | E: 119. Project Administration & Assist Fisheries department | 12/31/2020 | 12/28/2020 | |
Improved roads | F: 38. Improve roads on mitigation site | 12/31/2020 | 12/28/2020 | |
Work on diversion dam structure | G: 186. Work on diversion dam structure | 12/31/2020 | 12/29/2020 | |
Fence Maintained | H: 186. Maintain Fence | 12/31/2020 | 12/29/2020 | |
Maintain Wet Meadow Irrigation System | I: 198. Maintain Wet Meadow Irrigation and Basic Ditch Maintenance | 12/31/2020 | 12/29/2020 | |
Access created and culvert replaced | J: 186. South-Upper Wetland Ditch Maintenance and Access Creation | 12/31/2020 | 12/29/2020 | |
Planting complete | K: 47. Till, Spray and Seed fields | 12/31/2020 | 12/29/2020 | |
Collect and Propagate seeds and stem cuttings for out plantings | L: 47. Collect seed and cuttings for propagation | 12/31/2020 | 12/29/2020 | |
Data Collected and entered | M: 157. Conduct Project Surveys | 12/31/2020 | 12/29/2020 | |
Conduct nest box study | N: 158. Band nestlings and adults from nest box study | 12/31/2020 | 09/30/2020 | |
Starlings and house sparrows removed | O: 190. Remove European Starlings and House Sparrows | 12/31/2020 | 12/29/2020 | |
Access controlled | P: 188. Control Access | 12/31/2020 | 12/29/2020 | |
Community education and information | Q: 99. Public Education and Information | 12/31/2020 | 12/29/2020 | |
Tribal education complete | R: 99. Tribal Community Education | 12/31/2020 | 12/29/2020 | |
Weed Control | S: 198. Cost share: Weed Control | 12/31/2020 | 12/29/2020 | |
Conservation Reserve Enhancement Program Maintenance | T: 198. Cost share: Conservation Reserve Enhancement Program Maintenance | 12/31/2020 | 12/29/2020 | |
waterline installation complete | U: 186. BOG: Waterline installation | 12/31/2020 | 12/29/2020 | |
Mitigation | V: 186. Mitigation work | 12/31/2020 | 12/29/2020 | |
Road maintained | W: 33. Improve bridge access road | 12/31/2020 | ||
Deliver updated sub-basin plan | X: 193. Update Malheur River Sub-basin Plan | 12/31/2020 | 12/29/2020 |
Primary Focal Species | Work Statement Elements |
---|---|
Wildlife |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | |||||||
B | 165 | Complete Environmental Compliance Requirements & Tribal/Cultural Surveys | |||||||
C | 132 | Submit Annual Report for 1/1/2019 to 12/31/2019 | |||||||
D | 132 | Prepare data for draft annual report for period 1/2020 to 12/2020 | |||||||
E | 119 | Project Administration & Assist Fisheries department | |||||||
F | 38 | Improve roads on mitigation site | 10/09/2020 | ||||||
G | 186 | Work on diversion dam structure | 10/09/2020 | ||||||
H | 186 | Maintain Fence | 10/09/2020 | ||||||
I | 198 | Maintain Wet Meadow Irrigation and Basic Ditch Maintenance | 10/09/2020 | ||||||
J | 186 | South-Upper Wetland Ditch Maintenance and Access Creation | 10/09/2020 | ||||||
K | 47 | Till, Spray and Seed fields | 10/09/2020 | ||||||
L | 47 | Collect seed and cuttings for propagation | 10/09/2020 | ||||||
M | 157 | Conduct Project Surveys | 07/01/2020 | ||||||
N | 158 | Band nestlings and adults from nest box study | 10/09/2020 | ||||||
O | 190 | Remove European Starlings and House Sparrows | 10/09/2020 | ||||||
P | 188 | Control Access | 11/07/2019 | ||||||
Q | 99 | Public Education and Information | |||||||
R | 99 | Tribal Community Education | |||||||
S | 198 | Cost share: Weed Control | 10/09/2020 | ||||||
T | 198 | Cost share: Conservation Reserve Enhancement Program Maintenance | 10/09/2020 | ||||||
U | 186 | BOG: Waterline installation | 10/19/2020 | ||||||
V | 186 | Mitigation work | 10/19/2020 | ||||||
W | 33 | Improve bridge access road | |||||||
X | 193 | Update Malheur River Sub-basin Plan |