Province | Subbasin | % |
---|---|---|
Basinwide | - | 100.00% |
Previous: | Next: |
---|---|
n/a |
* Expenditures data includes accruals and are based on data through 28-Feb-2025.
Full Name | Organization | Write Permission | Contact Role | Work Phone | |
---|---|---|---|---|---|
Jennifer Harlan | US Geological Survey (USGS) | No | Administrative Contact | jharlan@usgs.gov | (509) 538-2983 |
David Kaplowe | Bonneville Power Administration | Yes | F&W Approver | djkaplowe@bpa.gov | (503) 230-5365 |
Marty Liedtke | US Geological Survey (USGS) | Yes | Contract Manager | tliedtke@usgs.gov | (509) 538-2963 |
Siena Lopez-Johnston | Bonneville Power Administration | Yes | COR | smlopez@bpa.gov | (503) 230-3635 |
Khanida Mote | Bonneville Power Administration | Yes | Contracting Officer | kpmote@bpa.gov | (503) 230-4599 |
William Stinnette | Bonneville Power Administration | No | Env. Compliance Lead | wwstinnette@bpa.gov | (503) 230-4643 |
Steve Waste | US Geological Survey (USGS) | No | Supervisor | swaste@usgs.gov | (509) 538-2299x236 |
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
EC Requirements Complete | A: 165. Complete Environmental Compliance Requirements | 12/31/2021 | 12/31/2020 | |
Pilot test of an acoustic telemetry array to monitor juvenile lamprey in the lower Columbia River | B: 157. Acoustic Array Installation & Evaluation in lower Columbia River - JLAT study | 11/01/2021 | ||
Deliverable: An accessible, error-checked data set with metadata | C: 162. Analysis of JLAT acoustic array detection efficiency | 11/01/2021 | ||
Larval lamprey salvage & transport to lab | D: 28. Salvage & transport larval lamprey for lab survival study | 06/30/2021 | 11/30/2020 | |
Evaluate lamprey in lab following different salvage techniques | E: 157. Lab study evaluating larval lamprey survival following salvage | 12/31/2021 | 12/31/2020 | |
Deliverable: An accessible, error-checked data set with metadata | F: 162. Analysis of larval lamprey following salvage lab study | 12/31/2021 | 12/02/2021 | |
Completed Annual Report | H: 132. Submit Progress Report for the period 6/1/2020 to 12/31/2021 | 12/31/2021 | 12/02/2021 | |
Effective implementation management and timely contract administration | I: 119. Project management | 12/31/2021 | 12/02/2021 |
Primary Focal Species | Work Statement Elements |
---|---|
Lamprey, Pacific (Entosphenus tridentata) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Complete Environmental Compliance Requirements | |||||||
B | 157 | Acoustic Array Installation & Evaluation in lower Columbia River - JLAT study | 10/06/2020 | ||||||
C | 162 | Analysis of JLAT acoustic array detection efficiency | |||||||
D | 28 | Salvage & transport larval lamprey for lab survival study | 10/06/2020 | ||||||
E | 157 | Lab study evaluating larval lamprey survival following salvage | 10/06/2020 | ||||||
F | 162 | Analysis of larval lamprey following salvage lab study | |||||||
G | 185 | Periodic Status Reports for BPA | |||||||
H | 132 | Submit Progress Report for the period 6/1/2020 to 12/31/2021 | |||||||
I | 119 | Project management |