SOW Report
Contract 88420: 2009-012-00 EXP WILLAMETTE MISSION PHASE 7 FINAL
Project Number:
Title:
Willamette Bi-Op Habitat Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Lower Columbia Willamette 100.00%
Contract Number:
88420
Contract Title:
2009-012-00 EXP WILLAMETTE MISSION PHASE 7 FINAL
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
This contract is for Willamette Mission State Park Floodplain Reforestation, Phase 7.  The restoration project will enhance the quality of Willamette River floodplain forest and aquatic habitat at an anchor habitat in the mid-Willamette Valley. This final phase will complete plant establishment treatments in the Riparian Edge Units which include the Willamette Edge, Mission Edge, Goose Lake Edge, and Windsor Edge.

These units total 211 gross acres, but treatments will focus on  82 acres within these units associated with native plantings that occurred in 2020 and 2021. Plant establishment treatments are primarily targeted mowing and herbicide spraying of priority noxious weeds. For all locations where native planting occurred, 3-5 years of plant establishment maintenance is planned to help the plantings reach a free to grow stage. The funds associated with this BPA contract will be used for some, but not all, of these mecha... nical and chemical plant establishment treatments used to treat invasive weeds.   
Account Type(s):
Expense
Contract Start Date:
09/01/2021
Contract End Date:
08/31/2022
Current Contract Value:
$39,715
Expenditures:
$39,715

* Expenditures data includes accruals and are based on data through 28-Feb-2025.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
MarkerMarkerMarkerMarker
500 m
2000 ft
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing 5 of 5 Work Statement Elements
Sort Order
WSEV ID
WE ID
Work Element Name
Title
Description
WSE Effective Budget
% of Total WSE Effective Budget
WSE Start
WSE End
A212816185Produce CBFish Status ReportPeriodic Status Reports for BPAThe Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR.$1,0002.52%01/01/202208/31/2022
B212817119Manage and Administer ProjectsContract Administrative FunctionsComplete all BPA reporting and administrative requirements on time.$1,0002.52%09/01/202108/31/2022
C212818165Produce Environmental Compliance DocumentationEnvironmental compliance documentationAssist BPA with completing environmental compliance for the project.$1,0002.52%09/01/202108/31/2022
D212820198Maintain VegetationPlant establishment treatments to control invasive plants growing within planting areasDuring the winter of 2020 and 2021, bare root native trees and shrubs were planted with non-BPA funding in the Mission Edge, Willamette Edge, Goose Lake, and Windsor Edge Management Units. To help these plantings achieve a free to grow status, priority weed control will take place seasonally in the planting areas. Priority weeds such as Armenian blackberry, reed canarygrass, yellow toad flax, shiny leaf geranium, clematis and ivy will be treated with both mechanical and chemical methods. Mechanical and chemical treatments of invasive plants will be done using a sub-contractor.$35,71589.93%09/01/202108/31/2022
E212821132Produce Progress (Annual) ReportSubmit Progress Report for the period (Sept 2021) to (Aug 2022)The progress report summarizes the project goal, objectives, completed and uncompleted deliverables, problems encountered, lessons learned, and long-term planning. Examples of long-term planning include future improvements, new directions, or any ramping up or ramping down of contract components or of the project as a whole. Non-technical Progress Reports must conform to BPA guidelines. See the "Non-technical Progress Report" link at: http://www.cbfish.org/Help.mvc/GuidanceDocuments. The final progress report will use the "Habitat Report Template" found at the above link.$1,0002.52%06/01/202208/31/2022
      
$39,715
   

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration B: 119. Contract Administrative Functions 08/31/2022 08/31/2022
All Environmental Compliance Documentation will be completed C: 165. Environmental compliance documentation 08/31/2022 08/31/2022
Invasive plants have been treated using chemical and mechanical methods D: 198. Plant establishment treatments to control invasive plants growing within planting areas 08/31/2022 08/31/2022
Completed Annual Report E: 132. Submit Progress Report for the period (Sept 2021) to (Aug 2022) 08/31/2022 08/31/2022

Viewing of Implementation Metrics
Loading...
Sort Order
WE ID
Work Element Name
Title
Description
Metric ID
Metric
End Fiscal Year
Planned
Actual
Contractor Comments
All Measures
Annual Progress Report Measures
Populations
Viewing of Environmental Metrics Customize
Loading...
WSE ID
WSE Start
WSE End
WE ID
Title
WSE Progress
Study Plan
Protocol
Category
Subcategory
Focus 1
Focus 2
Specific Metric Title

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Willamette River ESU (Threatened)
  • 1 instance of WE 198 Maintain Vegetation
Steelhead (O. mykiss) - Upper Willamette River DPS (Threatened)
  • 1 instance of WE 198 Maintain Vegetation

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 119 Contract Administrative Functions
C 165 Environmental compliance documentation
D 198 Plant establishment treatments to control invasive plants growing within planting areas 06/17/2021
E 132 Submit Progress Report for the period (Sept 2021) to (Aug 2022)