Province | Subbasin | % |
---|---|---|
Lower Columbia | Willamette | 100.00% |
* Expenditures data includes accruals and are based on data through 31-Oct-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Ensure environmental compliance requirements are complete | A: 165. Complete Environmental Compliance Requirements | 03/31/2023 | 03/31/2023 | |
Install HDX antennas and cameras in old fishway and the lamprey ramps | B: 157. Install video cameras for lamprey ramps and the old fishway and HDX antenna in old fishway | 03/31/2023 | 03/31/2023 | |
Review video of hard drives for lamprey passage. | C: 162. Video review for lamprey recorded passing old fishway and lamprey ramps | 03/31/2023 | 03/31/2023 | |
Record entry an passage of PIT tagged lamprey into Abernethy Creek | D: 157. Install HDX antenna arrays in Abernethy Creek | 03/31/2023 | 03/31/2023 | |
Capture, Mark, Inspect Lamprey and Operate HDX Array(s) at Willamette Falls | E: 157. Collect and examine lamprey to calculate adult escapement | 03/31/2023 | 03/31/2023 | |
Analyze PIT tag detections from PIT antenna arrays | F: 162. Analyze PIT tag detections from antenna arrays in WFFL, old fishway, and Abernethy Creek | 03/31/2023 | 03/31/2023 | |
Tag Adult Lamprey at Willamette Falls | G: 158. HDX tag adult Pacific lamprey at Willamette Falls | 03/31/2023 | 03/31/2023 | |
Develop Plan to collect tissue samples of ammocoetes above and below Willamette Falls, begin sampling and analyze tissue samples. | H: 156. Collect tissue samples from ammocoetes near tributary mouths and rearing habitats in the mainstem Willamette River downstream of Willamette Falls | 03/31/2023 | 03/31/2023 | |
Conduct Creel Surveys | I: 157. Conduct creel surveys | 03/31/2023 | 03/31/2023 | |
Estimate Lamprey Harvest at Willamette Falls | J: 162. Record and Report Harvest | 03/31/2023 | 07/18/2022 | |
Collect Larval Lamprey Samples | K: 157. Collect tissue samples from ammocoetes | 03/31/2023 | ||
Genetic Analysis of Larval lamprey Tissue Samples | L: 162. Analysis of tissue samples from larval lamprey | 03/31/2023 | ||
Willamette Falls Pacific Lamprey Technical Working Group (WFPLTWG) | M: 191. Participate in Willamette Falls Pacific Lamprey Technical Working Group (WFPLTWG) | 03/31/2023 | 03/31/2023 | |
Effective implementation management and timely contract administration | N: 119. Manage Project | 03/31/2023 | 03/31/2023 | |
Completed Annual Report | O: 132. Submit Progress Report for the period January 1, 2021 - December 31, 2021 | 03/31/2023 |
Primary Focal Species | Work Statement Elements |
---|---|
Lamprey, Pacific (Entosphenus tridentata) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Complete Environmental Compliance Requirements | |||||||
B | 157 | Install video cameras for lamprey ramps and the old fishway and HDX antenna in old fishway | 07/29/2022 | ||||||
C | 162 | Video review for lamprey recorded passing old fishway and lamprey ramps | |||||||
D | 157 | Install HDX antenna arrays in Abernethy Creek | 07/29/2022 | ||||||
E | 157 | Collect and examine lamprey to calculate adult escapement | 07/29/2022 | ||||||
F | 162 | Analyze PIT tag detections from antenna arrays in WFFL, old fishway, and Abernethy Creek | |||||||
G | 158 | HDX tag adult Pacific lamprey at Willamette Falls | 07/29/2022 | ||||||
H | 156 | Collect tissue samples from ammocoetes near tributary mouths and rearing habitats in the mainstem Willamette River downstream of Willamette Falls | 07/29/2022 | ||||||
I | 157 | Conduct creel surveys | 07/29/2022 | ||||||
J | 162 | Record and Report Harvest | |||||||
K | 157 | Collect tissue samples from ammocoetes | 07/29/2022 | ||||||
L | 162 | Analysis of tissue samples from larval lamprey | |||||||
M | 191 | Participate in Willamette Falls Pacific Lamprey Technical Working Group (WFPLTWG) | |||||||
N | 119 | Manage Project | |||||||
O | 132 | Submit Progress Report for the period January 1, 2021 - December 31, 2021 | |||||||
P | 185 | Periodic Status Reports for BPA |