Province | Subbasin | % |
---|---|---|
Middle Snake | Malheur | 100.00% |
* Expenditures data includes accruals and are based on data through 31-Oct-2024.
Full Name | Organization | Write Permission | Contact Role | Work Phone | |
---|---|---|---|---|---|
Jay Chong | Bonneville Power Administration | Yes | Contracting Officer | jxchong@bpa.gov | (503) 230-4007 |
Israel Duran | Bonneville Power Administration | Yes | Env. Compliance Lead | induran@bpa.gov | (503) 230-3967 |
Matt Hanneman | Burns-Paiute Tribe | Yes | Contract Manager | matthew.hanneman@burnspaiute-nsn.gov | (541) 573-8086 |
Tammi Holliday | Burns-Paiute Tribe | No | Administrative Contact | tammi.holliday@burnspaiute-nsn.gov | (541) 573-8012 |
David Kaplowe | Bonneville Power Administration | Yes | F&W Approver | djkaplowe@bpa.gov | (503) 230-5365 |
Jennifer McKenna | Bonneville Power Administration | Yes | CO Assistant | jmmckenna@bpa.gov | (503) 314-8915 |
Jessica Power | Bonneville Power Administration | No | CO Assistant | jdpower@bpa.gov | (503) 230-4023 |
Virginia Preiss | Bonneville Power Administration | Yes | COR | vdpreiss@bpa.gov | (503) 230-3619 |
Trey Wall | Burns-Paiute Tribe | Yes | Supervisor | trey.wall@burnspaiute-nsn.gov | (541) 573-8019 |
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Deliverable: M. Cultural Resource clearance complete | B: 165. Complete Environmental Compliance Requirements & Tribal/Cultural Surveys | 12/31/2023 | 12/31/2023 | |
Effective implementation management and timely contract administration | C: 119. Project Administration & Assist Fisheries department | 12/31/2023 | 12/31/2023 | |
Roads maintained | D: 38. Improve roads on mitigation site | 12/31/2023 | 06/30/2023 | |
Diversion dam structure annual maintenance | E: 186. Work on diversion dam structure | 12/31/2023 | 06/30/2023 | |
Fence maintained | F: 186. Maintain Fence | 12/31/2023 | 12/31/2023 | |
Maintain wet meadow irrigation system | H: 198. Maintain Wet Meadow Irrigation and Basic Ditch Maintenance | 12/31/2023 | 12/31/2023 | |
Access created and culvert replaced | I: 38. South-Upper Wetland Ditch Maintenance and Access Creation | 12/31/2023 | 12/31/2023 | |
Planting complete | J: 47. Till, Spray and Seed fields | 12/31/2023 | 12/31/2023 | |
Collect and propagate seeds and stem cuttings for out plantings | K: 98. Collect seed and cuttings for propagation | 12/31/2023 | 06/01/2023 | |
Produce accessible, error-checked datasets | L: 157. Conduct Project Field Surveys | 12/31/2023 | 12/31/2023 | |
Conduct nest box study | M: 158. Band nestlings and adults from nest box study | 12/31/2023 | 12/31/2023 | |
Starlings and house sparrows removed | N: 190. Remove European Starlings and House Sparrows | 12/31/2023 | 06/30/2023 | |
Weed Control | O: 198. Weed Control | 12/31/2023 | 12/31/2023 | |
Plant upland plants in problem areas | P: 47. Plant upland vegetation in invaded/burned areas | 12/31/2023 | 12/31/2023 | |
Conservation Reserve Enhancement Program Maintenance | Q: 198. Cost share: Conservation Reserve Enhancement Program Maintenance | 12/31/2023 | 06/25/2023 | |
Road maintained | R: 33. Improve bridge access road | 12/31/2023 | 12/31/2023 | |
Access controlled | S: 188. Control Access | 12/31/2023 | 06/30/2023 | |
Community education and information | T: 99. Public Education and Information | 12/31/2023 | 12/31/2023 | |
Tribal education complete | U: 99. Tribal Community Education | 12/31/2023 | 12/31/2023 | |
Completed Annual Report | V: 132. Submit Annual Report for 1/1/2022 to 12/31/2022 | 06/05/2023 | 06/05/2023 | |
Prepare Data for 2023 Annual Report | W: 132. Prepare data for draft annual report for period 1/2023 to 12/2023 | 12/31/2023 | ||
Storage container placed | X: 201. Install cargo container to hold project equipment | 12/31/2023 | 12/31/2023 |
Primary Focal Species | Work Statement Elements |
---|---|
Wildlife |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | |||||||
B | 165 | Complete Environmental Compliance Requirements & Tribal/Cultural Surveys | |||||||
C | 119 | Project Administration & Assist Fisheries department | |||||||
D | 38 | Improve roads on mitigation site | 01/01/2023 | ||||||
E | 186 | Work on diversion dam structure | 01/01/2023 | ||||||
F | 186 | Maintain Fence | 01/01/2023 | ||||||
G | 186 | Maintain Corral | 01/01/2023 | ||||||
H | 198 | Maintain Wet Meadow Irrigation and Basic Ditch Maintenance | 01/01/2023 | ||||||
I | 38 | South-Upper Wetland Ditch Maintenance and Access Creation | 04/03/2023 | ||||||
J | 47 | Till, Spray and Seed fields | 04/03/2023 | ||||||
K | 98 | Collect seed and cuttings for propagation | 03/29/2023 | ||||||
L | 157 | Conduct Project Field Surveys | 08/19/2022 | ||||||
M | 158 | Band nestlings and adults from nest box study | 08/19/2022 | ||||||
N | 190 | Remove European Starlings and House Sparrows | 08/19/2022 | ||||||
O | 198 | Weed Control | 04/03/2023 | ||||||
P | 47 | Plant upland vegetation in invaded/burned areas | 04/03/2023 | ||||||
Q | 198 | Cost share: Conservation Reserve Enhancement Program Maintenance | 08/19/2022 | ||||||
R | 33 | Improve bridge access road | 08/19/2022 | ||||||
S | 188 | Control Access | 08/19/2022 | ||||||
T | 99 | Public Education and Information | |||||||
U | 99 | Tribal Community Education | |||||||
V | 132 | Submit Annual Report for 1/1/2022 to 12/31/2022 | |||||||
W | 132 | Prepare data for draft annual report for period 1/2023 to 12/2023 | |||||||
X | 201 | Install cargo container to hold project equipment | 10/02/2023 |