Province | Subbasin | % |
---|---|---|
Lower Columbia | Columbia Lower | 100.00% |
* Expenditures data includes accruals and are based on data through 31-Dec-2024.
Full Name | Organization | Write Permission | Contact Role | Work Phone | |
---|---|---|---|---|---|
Brian Calkins | Washington Department of Fish and Wildlife (WDFW) | Yes | Technical Contact | calkibc@dfw.wa.gov | (360) 906-6725 |
Paul Dahmer | Washington Department of Fish and Wildlife (WDFW) | Yes | Contract Manager | paul.dahmer@dfw.wa.gov | (360) 902-2480 |
Joe Deherrera | Bonneville Power Administration | Yes | COR | jldeherrera@bpa.gov | (503) 230-3442 |
Brenda Heister | Bonneville Power Administration | Yes | Contracting Officer | bsheister@bpa.gov | (503) 230-3531 |
Lynn Needham | Washington Department of Fish and Wildlife (WDFW) | No | Administrative Contact | lynn.needham@dfw.wa.gov | (360) 664-4994 |
Ted Nelson | Washington Department of Fish and Wildlife (WDFW) | No | Administrative Contact | nelsotfn@dfw.wa.gov | (360) 902-2401 |
Karen Southwell | Washington Department of Fish and Wildlife (WDFW) | No | Administrative Contact | southkjs@dfw.wa.gov | (360) 664-4993 |
Benjamin Zelinsky | Bonneville Power Administration | Yes | F&W Approver | bdzelinsky@bpa.gov | (503) 230-4737 |
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Deliverable complete | A: 181. Install Water Control Structures (Shillapoo Lakebed) | 09/30/2005 | ||
Deliverable complete | B: 175. Develop Construction Plan(s) for Smaller Wetland Basins Throughout the Shillapoo Wildlife Area | 09/30/2005 | ||
Deliverable complete | C: 18. Operate Wetland Management Facilities and Structures (Including Pumps) and Repair as Needed | 06/30/2005 | ||
Deliverable complete | D: 53. Remove Vegetation (Moist Soil Management Practices) | 09/30/2005 | ||
Deliverable complete | E: 22. Maintain Vegetation (Upland Goose Forage) | 09/30/2005 | ||
Deliverable complete | F: 53. Reduce Noxious Weeds and Other Undesirable Plants | 09/30/2005 | ||
Deliverable complete | G: 53. Lake River Riparian Enhancement Site Prep (Blackberry Removal) | 09/30/2005 | ||
Deliverable complete | H: 40. Riparian Fencing | 09/30/2005 | ||
Deliverable complete | I: 47. Plant Native Trees and Shrubs in Oak Habitat and Great Blue Heron Nesting Restoration Sites | 09/30/2005 | ||
Deliverable complete | J: 22. Maintain Planted Trees and Shrubs | 09/30/2005 | ||
Deliverable complete | K: 38. Improve Interior Roads and Travel Routes in Support of Other Activities | 09/30/2005 | ||
Deliverable complete | L: 119. Monitor and Manage Public and Other Uses | 09/30/2005 | ||
Deliverable complete | M: 175. Storage Building | 09/30/2005 | ||
Deliverable complete | N: 119. Purchase Equipment | 09/30/2005 | ||
Deliverable complete | O: 18. Maintain, Repair or Replace Existing Fences as Needed for Management Purposes | 09/30/2005 | ||
Deliverable complete | P: 27. Remove Debris, Litter and Other Materials as Required | 09/30/2005 | ||
Deliverable complete | Q: 157. Wildlife Use Data, General Habitat Monitoring and Photo-Point Documentation | 05/30/2005 | ||
Deliverable complete | R: 174. Complete Draft Management Plan | 09/30/2005 | ||
Deliverable complete | S: 99. Community Outreach | 09/30/2005 | ||
Deliverable complete | T: 119. Conduct Administrative Activities to Operate, Enhance and Maintain Shillapoo Wildlife Area | 09/30/2005 | ||
Deliverable complete | U: 165. Cultural Resource Surveys and/or Consultation | 09/30/2005 | ||
Deliverable complete | V: 132. Annual Report | 09/30/2005 |
Primary Focal Species | Work Statement Elements |
---|---|
Wildlife |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 181 | Install Water Control Structures (Shillapoo Lakebed) | |||||||
B | 175 | Develop Construction Plan(s) for Smaller Wetland Basins Throughout the Shillapoo Wildlife Area | |||||||
C | 18 | Operate Wetland Management Facilities and Structures (Including Pumps) and Repair as Needed | |||||||
D | 53 | Remove Vegetation (Moist Soil Management Practices) | |||||||
E | 22 | Maintain Vegetation (Upland Goose Forage) | |||||||
F | 53 | Reduce Noxious Weeds and Other Undesirable Plants | |||||||
G | 53 | Lake River Riparian Enhancement Site Prep (Blackberry Removal) | |||||||
H | 40 | Riparian Fencing | |||||||
I | 47 | Plant Native Trees and Shrubs in Oak Habitat and Great Blue Heron Nesting Restoration Sites | |||||||
J | 22 | Maintain Planted Trees and Shrubs | |||||||
K | 38 | Improve Interior Roads and Travel Routes in Support of Other Activities | |||||||
L | 119 | Monitor and Manage Public and Other Uses | |||||||
M | 175 | Storage Building | |||||||
N | 119 | Purchase Equipment | |||||||
O | 18 | Maintain, Repair or Replace Existing Fences as Needed for Management Purposes | |||||||
P | 27 | Remove Debris, Litter and Other Materials as Required | |||||||
Q | 157 | Wildlife Use Data, General Habitat Monitoring and Photo-Point Documentation | |||||||
R | 174 | Complete Draft Management Plan | |||||||
S | 99 | Community Outreach | |||||||
T | 119 | Conduct Administrative Activities to Operate, Enhance and Maintain Shillapoo Wildlife Area | |||||||
U | 165 | Cultural Resource Surveys and/or Consultation | |||||||
V | 132 | Annual Report | |||||||
W | 185 |