Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 20547: PI 1988-053-08 ODFW - POWERDALE
Project Number:
Title:
Hood River Production Operations and Maintenance (O&M) and Powerdale
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Gorge Hood 100.00%
Contract Number:
20547
Contract Title:
PI 1988-053-08 ODFW - POWERDALE
Contract Continuation:
Previous: Next:
4933: 1988-053-08 HOOD RIVER POWERDALE/OAK SPRINGS O&M
  • 25455: 198805308 EXP POWERDALE ODFW - HOOD RIVER PRODUCTION
Contract Status:
History
Contract Description:
Statement of Work Report

BPA Project Number: 19988-053-08
Project Title: ODFW - Powerdale Fish Facility
Contract Number: 20547

Technical Contact Name: Rod French
Technical Contact Title: Supervising Fish and Wildlife Biologist
Agency Name:   Oregon Department of Fish and Wildlife
Address: 3701 W. 13th
The Dalles, OR 97058
Phone: 541-296-4628
Email: rod.a.french@state.or.us

ODFW Procurement: Gail Samura
Address: 3406 Cherry Ave. NE
Salem, OR 97303
Phone: 503-947-6137

Contract Description:  The Powerdale Dam Fish Facility (PDFF) is located at Powerdale Dam (river mile 4.0) on the Hood River.  The dam in conjunction with the PDFF form a barrier to upstream fish passage, all upstream migrant fish are redirects into the PDFF where they are individually sampled.  The Oregon Department of Fish and Wildlife (ODFW) began collecting life history and escapement data on upstream migrant salmonids at Powerdale Dam in 1991.  The current PDFF was completed in 1997.  The ODFW will be responsible for conducting all phases of the trap operation, including: trapping and anesthetizing all upstream migratory fish, gathering life history data from each fish captured, collecting broodstock for steelhead and spring chinook programs, transporting fish to the adult holding facility or other release sites, and providing maintenance of the facility, grounds, and roads.  Operation of the PDFF requires close coordination with several other BPA funded projects associated with the Hood River Production Project (HRPP), and PacifiCorps which operates the Powerdale Dam.  In addition, several other BPA funded projects rely on data and fish collected from the PDFF to accomplish project objectives (1988-053-06, 1988-053-04, 1988-053-03, 1988-053-07, 2003-054-00).  The overall implementation of the HRPP is jointly managed by the by ODFW and Confederated Tribes of the Warm Springs Reservation of Oregon.
Account Type(s):
Expense
Contract Start Date:
10/01/2004
Contract End Date:
09/30/2005
Current Contract Value:
$164,203
Expenditures:
$164,203

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Deliverable complete A: 165. Complete the Permitting Process Required to Operate the Powerdale Adult Fish Facility 12/31/2004
Deliverable complete B: 66. Operate the Powerdale Fish Facility 09/30/2005
Deliverable complete C: 157. Collect Bio Data From All Upstream Migrating Fish Captured At the Facility 09/30/2005
Deliverable complete D: 176. Collect, Hold, and Transport Summer and Winter Steelhead/Spring Chinook for Hathcery Broodstock/Harv
Deliverable complete E: 174. Annual Meeting with Program Partners Determining Broodstock Needs 03/30/2005
Deliverable complete F: 118. Coordinate with Other Inter- and Intra- Agency Personnel 09/30/2005
Deliverable complete G: 119. Administration of BPA Contract 11/30/2005
Deliverable complete H: 141. Monthly Status Report for Powerdale Fish Facility 09/07/2005
Deliverable complete I: 132. Annual Report of Operations and Findings for the Powerdale Fish Facility 09/30/2005
Deliverable complete J: 24. Provide All Needed Maintenance and Repair Required for Continued Operation of Powerdale Fish Facilit 09/30/2005
Deliverable complete K: 157. Determine the Ecotype (Race) of Summer and Winter Steelhead Collected for Broodstock Using Genetic M 09/30/2005
Deliverable complete L: 2. <No Work Element Title Entered> 09/30/2005

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 174 Produce Plan
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 1 instance of WE 176 Produce Hatchery Fish
  • 1 instance of WE 66 Trap/Collect/Hold/Transport Fish - Hatchery
  • 1 instance of WE 174 Produce Plan
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete the Permitting Process Required to Operate the Powerdale Adult Fish Facility
B 66 Operate the Powerdale Fish Facility
C 157 Collect Bio Data From All Upstream Migrating Fish Captured At the Facility
D 176 Collect, Hold, and Transport Summer and Winter Steelhead/Spring Chinook for Hathcery Broodstock/Harv
E 174 Annual Meeting with Program Partners Determining Broodstock Needs
F 118 Coordinate with Other Inter- and Intra- Agency Personnel
G 119 Administration of BPA Contract
H 141 Monthly Status Report for Powerdale Fish Facility
I 132 Annual Report of Operations and Findings for the Powerdale Fish Facility
J 24 Provide All Needed Maintenance and Repair Required for Continued Operation of Powerdale Fish Facilit
K 157 Determine the Ecotype (Race) of Summer and Winter Steelhead Collected for Broodstock Using Genetic M
L 2
M 185