SOW Report
Contract 21787 REL 9: 200302300 CAP (NWS) CHIEF JOSEPH WATER SUPPLY ENGINEERING REVIEW
Project Number:
Title:
Chief Joseph Hatchery Program
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Okanogan 100.00%
Contract Number:
21787 REL 9
Contract Title:
200302300 CAP (NWS) CHIEF JOSEPH WATER SUPPLY ENGINEERING REVIEW
Contract Continuation:
Previous: Next:
n/a
  • 21787 REL 13: 200302300 CAP NWS CHIEF JOSEPH WATER SUPPLY ENGINEERING REVIEW
Contract Status:
Closed
Contract Description:
GENERAL COMMENT:
This contract is for the US Army Corps of Engineer's (COE) staff to provide specific data and information and review of engineering documents related to the water supply for CJHP to Tetra Tech KCM, the design engineer contracted by Bonneville Power Administration and the Colville Confederated Tribes. COE is also being requested to participate on an advisory steering and design committee.

REPORTING:  This is mostly a coordination and review contract resulting in "Basis of Design" updates and technical memo's.  Quarterly reports will be adequate and no additional annual report will be required.

Note:  Environmental compliance is being done under a different contract as part of the overall project and therefore will not be done as part of this contract.

PURPOSE:
The purpose of this Statement of Work is to continue the implementation of the 3-Step Planning Process of the Northwest Power & Conservation Council (NPCC) for a Chinook salmon hatchery to supplement populations in the Okanogan and Columbia Rivers per Hatchery and Genetic Management Plans developed by the Colville Confederated Tribes and fishery co-managers.

PROJECT GOAL:
The goal of this project is to develop products and planning documents to be approved through the NPCC Step process.  The specific goal for this contract will be to complete requirements as described by the NPCC to complete Step 2 (due to schedule and place holder amounts it is not likely that all Step 2 requirements will be completed in FY 2006). The goal of this contract is to support all NEPA and other needed regulatory requirements and produce detailed designs of artificial propagation facilities necessary to implement comprehensive plans for management of Chinook salmon in the Okanogan River and the Columbia River above Wells Dam.

BACKGROUND:
For specific background information on this project please refer
to the Step 1 Chief Joseph Dam Hatchery Program Master plan submitted to BPA and the NPCC in May of 2004.

LOCATION OF PROJECT:
The project is located in the Okanogan Sub-basin in the U.S. and Canada, and the mainstem Columbia River upstream from Wells Dam, all in the Columbia Cascade Province.  Project work will be conducted by the Colville Confederated Tribes, fishery co-managers, and consultants in the Province and in private and public offices throughout the region.
Account Type(s):
Capital
Contract Start Date:
03/01/2006
Contract End Date:
11/30/2006
Current Contract Value:
$7,342
Expenditures:
$7,342

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
Env. Compliance Lead:
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Mickey Carter Bonneville Power Administration No Env. Compliance Lead macarter@bpa.gov (503) 230-5885
Linda Hermeston Bonneville Power Administration Yes COR llhermeston@bpa.gov (503) 230-4764
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Dan Warren D J Warren and Associates, Inc. Yes Technical Contact dan.warren@djwassociates.com (541) 929-4639
Joseph Wright US Army Corps of Engineers (COE) No Technical Contact richard.j.wright@nws02.usace.army.mil (206) 764-6946


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Participate at requested review and workshop A: 169. Manage and Coordination and Reviews during STEP 2 Process 11/30/2006 11/30/2006
Long Term Lease Coordination B: 172. Pre-lease work for Hatchery Site 11/30/2006 11/30/2006
All Milestones are complete C: 175. Conduct Activities to Produce Preliminary Design and Specifications 11/30/2006 11/30/2006
Provide BPA Financial and SOW Information as Needed D: 119. Provide BPA Financial and SOW Information as Needed 11/30/2006 11/30/2006

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 169 Council 3-step Process: Step 2

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 169 Manage and Coordination and Reviews during STEP 2 Process
B 172 Pre-lease work for Hatchery Site
C 175 Conduct Activities to Produce Preliminary Design and Specifications
D 119 Provide BPA Financial and SOW Information as Needed
E 185 Periodic Status Reports for BPA