Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 23028: 1992-026-01 GRANDE RONDE MODEL WATERSHED PROGRAM ADMINISTRATION
Project Number:
Title:
Grande Ronde Model Watershed
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
23028
Contract Title:
1992-026-01 GRANDE RONDE MODEL WATERSHED PROGRAM ADMINISTRATION
Contract Continuation:
Previous: Next:
n/a
  • 29298: 1992-026-01 GRANDE RONDE MODEL WATERSHED ADMIN (GRMWF)
Contract Status:
History
Contract Description:
Administration of the Grande Ronde Model Watershed Foundation

This contract will cover administration of the Grande Ronde Model Watershed Foundation for the period June 6, 2005 - September 30, 2005 (FY 05), and all of FY 06.  It will replace the current GRMWP/USFS Administration contract after it expires September 30, 2005.  Project Planner services, currently paid through the USFS contract, will be contracted through the GRMWF and this contract beginning June 6, 2005, and will not be paid through the USFS contract after that date.  Certain other supplies and services covered by the GRMWP - USFS and EOU administrative contracts will gradually be transfered over to this contract (see line item budget).

Project Planner - Contractor Duties

The contractor's tasks/duties as also identified in the SOW are as follows:

Manage and Administer Projects
•Coordinate technical assistance (agency biologists, engineering) to landowners to develop restoration projects
•Prepare and submit SOW packages for GRMWF FY 06 sponsored restoration projects (will be developed in FY 05 and early FY 06)
•Administer, maintain fiscal records, submit invoices for active GRMWF sponsored restoration projects(4 - FY 04 & 05 contracts, estimated 3 - FY 06 contracts
•Administer, maintain fiscal records, submit invoices for 3 GRMWP Administrative contracts (EOU, USFS, Union County)

Identify and Select Projects
•Coordinate with prospective restoration partners to develop projects for potential FY 06 & FY 07 funding (estimated 10-12 projects each year)
•Conduct on-site pre-proposal (FY 06 & 07) and active project (FY 04 & 05) reviews
•Organize and conduct Technical Committee proposal review (FY 06)
•Facilitate Board of Directors proposal review (FY 06)

Coordination
•Facilitate information sharing and program coordination with restoration partners (daily and at monthly coordination meeting
•Develop restoration priority summary (source GR Subbasin Plan)
•Provide assistance to landowners related to technical resource issues, ESA consulting, permitting and potential funding sources

Note:  The Grande Ronde Subbasin Plan identified priority restoration strategies and key watersheds throughout the Grande Ronde Basin.  However, the SBP is not a user friendly document for the average prospective project applicant.  The tasks for the contractor under this Work Element are to develop a summary document identifying the needs and potential priority actions (projects), and to communicate those to prospective restoration partners.

Produce Environmental Compliance Documentation
•Complete NEPA Checklists for FY 06 GRMWP/BPA funded projects
•Facilitate the completion of Biological Assessments for GRMWF FY 06 sponsored projects (prepare or subcontract preparation)
•Complete DSL/COE/DEQ permit applications for GRMWF FY 06 projects (proposals are not identified at this point and will be developed during FY 05 and early FY 06)
•Facilitate Cultural Resource clearance for GRMWF sponsored FY 06 projects

Produce Design and/or Specifications
•Identify project engineering needs and facilitate development of any necessary pre-project engineering work or products (surveys, pre-design, budget estimates).
•Subcontract above services as needed

Produce Annual and Status Reports
•Submit annual reports to BPA COTR as identified in Work Element F.
•Submit status reports as per milestone schedule in Work Element G.

Engineering Assitance

The GRMWP/BPA currently has a cooperative program with the Bureau of Reclamation to provide project engineering services (preliminary engineering and final designs).  This program will continue as is during the FY 05 portion of this administrative contract.  Beginning in FY 06 the GRMWP intends to subcontract with local or other firms to provide a significant portion of the preliminary engineering work, the amount is partially contingent on the BOR's ability to cost share in FY 06 as they have in the past (this will be negotiated/determined in late FY 05).  Beginning in FY 06 final project engineering designs will be incorporated into individual project proposals/contracts to more appropriately meet project specific needs and to more accurately reflect individual project costs.  We will likely not propose a FY 06 BPA/BOR final design engineering contract as it currently exists.
Account Type(s):
Expense
Contract Start Date:
06/06/2005
Contract End Date:
09/30/2006
Current Contract Value:
$276,938
Expenditures:
$276,938

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Contract Type:
Contract
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Mary Estes Grande Ronde Model Watershed Foundation No Administrative Contact mary@grmw.org (541) 663-0570
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Lyle Kuchenbecker Grande Ronde Model Watershed Foundation Yes Contract Manager lyle@grmw.org (541) 663-0570
Coby Menton Grande Ronde Model Watershed Foundation No Technical Contact rcoby@grmw.org (541) 426-0389
Elida Monroe Bonneville Power Administration Yes Contracting Officer emonroe@bpa.gov (503) 230-3821
Kelly Olive Bonneville Power Administration No Env. Compliance Lead kjmason@bpa.gov (503) 230-4735
Jeff Oveson Grande Ronde Model Watershed Foundation No Supervisor jeff@grmw.org (541) 663-0570
Dorothy Welch Bonneville Power Administration Yes COR dwwelch@bpa.gov (503) 230-5479


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Complete project administration A: 119. Manage and Administer Projects 09/30/2006 09/30/2006
Complete project selection process B: 114. Solicit, review and select restoration projects for FY 06 & 07 BPA funding request 09/30/2006 09/30/2006
Complete coordination activities C: 118. Coordinate habitat restoration activities in the Grande Ronde Basin 09/30/2006 09/30/2006
Complete environmental compliance coordination for selected projects D: 165. Produce Environmental Compliance Documentation (FY 06 Projects) 09/30/2006 09/30/2006
Complete engineering surveys and preliminary designs E: 175. Restoration Project Engineering 09/30/2006 09/30/2006
Complete EOU End Creek/Rice 2006 water quality data collection F: 157. End Creek/Rice Data Acquisition 2006 07/31/2006 06/30/2006
Complete annual report G: 132. Produce Annual Report 09/30/2006

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Manage and Administer Projects
B 114 Solicit, review and select restoration projects for FY 06 & 07 BPA funding request
C 118 Coordinate habitat restoration activities in the Grande Ronde Basin
D 165 Produce Environmental Compliance Documentation (FY 06 Projects)
E 175 Restoration Project Engineering
F 157 End Creek/Rice Data Acquisition 2006
G 132 Produce Annual Report
H 185 Periodic Status Reports for BPA