Contract 24611: 1991-057-00 CAP YAKIMA BASIN SCREEN FABRICATION PHASE II
Project Number:
Title:
Yakima Basin Screen Fabrication Phase 2
Stage:
Closed
Area:
Province Subbasin %
Columbia Plateau Yakima 100.00%
Contract Number:
24611
Contract Title:
1991-057-00 CAP YAKIMA BASIN SCREEN FABRICATION PHASE II
Contract Continuation:
Previous: Next:
n/a
Contract Status:
History
Contract Description:
BACKGROUND
Obsolete Yakima basin fish screens constructed in the 1930's, 40's, 50's, 60's, and 70's must be replaced or updated to comply with current regional fish screen biological protection criteria adopted by Columbia Basin Fish and Wildlife Authority (CBFWA), Fish Screening Oversight Committee (FSOC) in 1995.

The Fogarty screen replacement originally scheduled for 1998 was delayed for a number of years by an unresolved right of way (ROW) issue.  During this period the biological community expressed a desire to seek out off channel rearing opportunities wherever possible.  The Fogarty ditch was an obvious candidate because of its connection with Sorenson Creek, and the Yakima River.  When the ROW issue was resolved The Yakima River Basin Fish Passage Program; the oversight group for the Yakima Basin Phase II Fish Screening Program received authorization from BPA to allow the Bureau of Reclamations (BOR) and the Washington Department of Fish and Wildlife (WDFW) to complete the Fogarty Ditch Screening project. Concurrently the Yakima Tributary Habitat and Access Program (YTAHP) received authorization from BPA to fund corrections of the other screening and passage issues in the Fogarty ditch and Sorenson Creek thereby allowing fish use in the Fogarty Ditch.   Over the last two to three years YTAHP and BOR have been working jointly with landowners and irrigators to accomplish this goal.   The current proposal is to move the Fogarty fish screen facility down stream below the intersection of the Fogarty ditch and Sorenson Creek and convert four other smaller gravity diversions to screened pump stations.  All of these projects are scheduled for completion fall 2005/Spring 2006.  In 1998 the WDFW's, Yakima Screen Shop (YSS) now the Yakima Construction Shop (YCS) fabricated the screens, gantry, bypass control gate,and miscellaneous metal work per the project schedule at that time.

Description
The WDFW Business Services Program's YCS in coordination with the WDFW Habiltat Program's Technical Assistance Program will partner with the Bureau of Reclamations on the construction and installation of a new fish screen facility for the Fogarty Ditch Company.  The YCS will disassemble the already fabricated fish screens and have them and the overhead lift gantry re-painted.  This coating on these components because of the delay in installation is now at the end of its serviceable life and has to be replaced prior to being installed in the new structure.  After being re-coated the screens will be re-assembled and readied for installation.  When the BOR has completed the civil works portion of this project the YCS will install the screens, gantry, bypass control gate, and miscellaneous metal work.  As part of this contract the WDFW will submit status reports and an annual (final) report.  Upon completion this new fish screen facility will be included in the BPA funded Yakima Phase II & Huntsville Mill Fish Screen O&M program # 1992-009-00.  
Account Type(s):
Capital
Contract Start Date:
10/01/2005
Contract End Date:
12/31/2006
Current Contract Value:
$67,911
Expenditures:
$67,911

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Assurance of environmental compliance A: 165. Assurance of environmental compliance 10/01/2005 10/01/2005
Fish Screen Installation B: 69. Fogarty Diversion Screening, Yakima Basin, Yakima River 05/01/2006 07/10/2006
Manage WDFW portion of the Fogarty Fish Screen replacement C: 119. Forgarty Diversion Screening, Yakima Basin, Yakima River 09/30/2006 12/31/2006
Final (annual) Report D: 132. Fogarty Diversion Screening, Yakima Basin, Yakima River 12/31/2006 12/31/2006

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
All Anadromous Salmonids
  • 1 instance of WE 69 Install Fish Screen
Bass, Smallmouth (M. dolomieu)
  • 1 instance of WE 69 Install Fish Screen
Catfish (Ictalurus spp.) [OBSOLETE]
  • 1 instance of WE 69 Install Fish Screen
Cutthroat Trout, Westslope (O. c. lewisi)
  • 1 instance of WE 69 Install Fish Screen
Freshwater Mussels
  • 1 instance of WE 69 Install Fish Screen
Kokanee (Oncorhynchus nerka)
  • 1 instance of WE 69 Install Fish Screen
Pikeminnow, Northern (Ptychocheilus oregonensis) [OBSOLETE]
  • 1 instance of WE 69 Install Fish Screen
Trout, Brown (Salmo trutta) [OBSOLETE]
  • 1 instance of WE 69 Install Fish Screen
Trout, Brook (Salvelinus fontinalis)
  • 1 instance of WE 69 Install Fish Screen
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 69 Install Fish Screen
Trout, Lake (S. namaycush) [OBSOLETE]
  • 1 instance of WE 69 Install Fish Screen
Trout, Rainbow (Oncorhynchus mykiss)
  • 1 instance of WE 69 Install Fish Screen
Whitefish, Mountain (Prosopium williamsoni)
  • 1 instance of WE 69 Install Fish Screen

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Assurance of environmental compliance
B 69 Fogarty Diversion Screening, Yakima Basin, Yakima River
C 119 Forgarty Diversion Screening, Yakima Basin, Yakima River
D 132 Fogarty Diversion Screening, Yakima Basin, Yakima River
E 185 Periodic Status Reports for BPA