Albeni Falls Project Management |
A: 119. Albeni Falls Wildlife Mitigation Program |
|
09/29/2006 |
09/29/2006 |
Herbicide Matrix |
B: 165. Produce Noxious Weed Control Chemical Matrix for approval |
|
04/28/2006 |
01/03/2006 |
Regional Wildlife Habitat Coordination & Administration |
C: 118. Coordinate with the AFWG, UCUT, BPA, NPPC and CBFWA Members |
|
09/29/2006 |
09/29/2006 |
Bird Survey data collection and input |
D: 157. Collect and Generate Field and Lab data for Bird Sampling |
|
09/29/2006 |
09/29/2006 |
Amphibian Larval Trapping Data |
E: 157. Collect and Generate Field and Lab data for Amphibian Sampling |
|
09/29/2006 |
09/29/2006 |
Vegetation Sampling data collection and input |
F: 157. Collect and Generate Field and Lab data for Vegetation Sampling |
|
09/29/2006 |
09/29/2006 |
Small Mammal Trapping data collection and input |
G: 157. Collect and Generate Field and Lab data for Mammal Sampling |
|
09/29/2006 |
09/29/2006 |
Provide Summary Data Reports |
H: 161. Disseminate Raw and Summary data to the Region (AFWG) |
|
09/29/2006 |
|
Analyze and Interpret RM&E Data |
I: 162. Analyze data for subsequent mitigation management |
|
09/29/2006 |
09/29/2006 |
Develop Centralized Database |
J: 159. Submit and Aquire Data for the Albeni Falls Program to a Regional Database |
|
09/29/2006 |
09/29/2006 |
Regional Wildlife Technical Review |
K: 122. Albeni Falls Workgroup Management Plan and Acqusition Review |
|
09/29/2006 |
09/29/2006 |
Complete HEP Reports |
L: 87. Prepare HEP report for the Albeni Falls Mitigation Projects |
|
09/28/2006 |
|
Hydrological Assessment of Goosehaven Lake |
M: 115. Sub-Contract Hydrological Assessment |
|
06/14/2006 |
|
Management Plan Development |
N: 174. Produce management plans and M&E plans for the Benewah Creek and Goose Haven lake |
|
09/29/2006 |
09/29/2006 |
Maintain Properties |
O: 18. EXPIRED: Maintain Fenceline and Structures |
|
09/29/2006 |
09/29/2006 |
Fence Installation on Goose Haven and Benewah Creek |
P: 40. Construct 2.5 miles of fence at Goosehaven Lake |
|
09/29/2006 |
09/29/2006 |
Fence Installation on Goose Haven and Benewah Creek |
Q: 40. Construct 2.5 miles of fence at Benewah Creek |
|
09/29/2006 |
09/29/2006 |
Herbicide Application on Benewah Creek Property |
R: 22. Maintain Trees and Wetland vegetation planted along the Benewah Creek property |
|
09/29/2006 |
09/29/2006 |
Noxious Weed Control |
S: 53. Remove noxious weeds via chemical means on the Goosehaven and Benewah properties |
|
09/29/2006 |
09/29/2006 |
Wetland Re-Creation |
T: 53. Re-create wetland areas |
|
09/29/2006 |
|
Begin Wetland Creation |
U: 181. Pump canal water and install culvert water control structure |
|
09/29/2006 |
|
Controlled Burn on Goosehaven lake |
V: 31. Goose Haven Burn Site |
|
09/29/2006 |
|
Debris Removal on Habitat Properties |
W: 27. Remove debris from Goosehaven lake and Benewah Creek |
|
09/29/2006 |
09/29/2006 |
Deterence to Tresspass |
X: 26. Investigate trespass on Benewah and Goosehaven properties |
|
09/29/2006 |
09/29/2006 |
M&E Database Development |
Y: 160. Implement M&E Database for AFWM projects |
|
09/29/2006 |
|
Albeni Falls Workgroup Annual Report |
Z: 132. Produce Albeni Falls Workgroup Annual Report |
|
05/31/2006 |
03/22/2006 |