Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 26212: 1996 080 00 NE OREGON WILDLIFE MITIGATION
Project Number:
Title:
Northeast Oregon Wildlife Project
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
26212
Contract Title:
1996 080 00 NE OREGON WILDLIFE MITIGATION
Contract Continuation:
Previous: Next:
21255: 1996 080 00 NE OREGON WILDLIFE PROJECT
  • 31129: 1996 080 00 N E OREGON WILDLIFE MITIGATION
Contract Status:
Closed
Contract Description:
The Precious Lands project was initiated in 1996 to provide partial mitigation for wildlife habitat losses sustained from construction and inundation of the four lower Snake River dams.  This project includes 16,286 acres of high quality fish and wildlife habitat in the Lower Grande Ronde subbasin consisting primarily of canyon grasslands with intermixed shrub fields, Douglas-fir and ponderosa pine forests, and riparian areas.  Precious lands includes parts of Bear, Cottonwood, Basin, Rock, Broady, Tamarack, Joseph, Rush, and Buford Creeks which provide habitat for listed Snake River Steelhead and resident trout.  It lies approximately 40 miles north of Enterprise, Oregon adjacent to the Wallowa-Whitman National Forest.  Part of the project (1,242 acres) is located in Washington state south of Anatone.

This contract represents a continuation of on-going work designed to protect, enhance, and mitigate for ten target wildlife species as well as promote biodiversity and ecosystem health.  This contract will help the Bonneville Power Administration meet its obligations under the Northwest Power and Conservation Act as well as its trust responsibilities to the Nez Perce Tribe.  This contract will authorize funding for the Nez Perce Tribe to manage and administer the Precious Lands Wildlife Area to benefit target species as well as Threatened and Endangered fish, wildlife and plants.  Currently, the Precious Lands Project provides 20,015 baseline Habitat Units (HU's) for target wildlife species.

A Management Plan was approved in 2002 which guides the current management direction of the project.  Primary goals of that management plan include 1) Maintain or improve native plant communities and other desirable species to benefit fish and wildlife, and provide traditional gathering and cultural opportunities for tribal members; 2) Maintain or enhance fish ands wildlife populations; 3) Provide public access for activities compatible with maintaining high quality wildlife populations and habitat; 4) Foster productive, interactive relationships with neighboring landowners, including private individuals and state and federal agencies; and 5) Conduct monitoring and evaluation activities to ensure management actions are providing the desired response and/or benefit.  This contract will providing funding to fullfill the goals set forth in the management plan.

Significant management activities planned for 2006 include the following tasks:
~Noxious weed management
~Habitat restoration of native grasslands, conifer forests, and riparian areas
~Fence constructiuon and maintenance to limit trespass by neighboring livestock
~Road, trail and building maintenance
~Monitoring and evaluation of target species and habitats
~Analysis of monitoring and evaluation data already collected
~Revision of the 2002 Management Plan
~Contract administration
Account Type(s):
Expense
Contract Start Date:
02/01/2006
Contract End Date:
01/31/2007
Current Contract Value:
$423,599
Expenditures:
$423,599

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Joe Deherrera Bonneville Power Administration Yes COR jldeherrera@bpa.gov (503) 230-3442
Arleen Henry Nez Perce Tribe No Administrative Contact arleenh@nezperce.org (208) 621-3833
Angela Sondenaa Nez Perce Tribe Yes Technical Contact angelas@nezperce.org (208) 843-7372
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Kelly Wasson Nez Perce Tribe No Administrative Contact kellyw@nezperce.org (208) 843-7317
Nancy Weintraub Bonneville Power Administration No Env. Compliance Lead nhweintraub@bpa.gov (503) 230-5373
Benjamin Zelinsky Bonneville Power Administration Yes F&W Approver bdzelinsky@bpa.gov (503) 230-4737


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Deliverable complete A: 165. NEPA, ESA and Cultural Resources Reports 01/31/2007 01/31/2007
Deliverable complete B: 40. Fence Construction 01/31/2007 01/31/2007
Deliverable complete C: 186. Maintain Fences, Buildings, and Signs 01/31/2007 01/31/2007
Deliverable complete D: 22. Planted Trees, Shrubs, and Herbs 12/31/2006 12/31/2006
Deliverable complete E: 26. Livestock and Vehicle Trespass 01/31/2007 01/31/2007
Deliverable complete F: 27. Remove Old Fences and Junk 01/31/2007 01/31/2007
Deliverable complete G: 38. Road and Trail Maintenance 01/31/2007 01/31/2007
Deliverable complete H: 53. Weed Control and Brush Removal 01/31/2007 09/30/2007
Deliverable complete I: 47. Plant Native Species 01/31/2007
Deliverable complete J: 48. Plant Ag. Fields 11/15/2006 11/15/2006
Deliverable complete K: 115. Assessment Findings Reports 01/31/2007 01/31/2007
Deliverable complete L: 157. Data Collection 11/01/2006 11/01/2006
Deliverable complete M: 183. Scientific Reports 01/31/2007 01/31/2007
Deliverable complete N: 162. Data Analysis 01/31/2007 01/31/2007
Deliverable complete O: 159. Data Acquisition and Sharing 01/31/2007 01/31/2007
Deliverable complete P: 160. Data Management 01/31/2007 01/31/2007
Deliverable complete Q: 118. Local and Regional Coordination 01/31/2007 01/31/2007
Deliverable complete R: 99. Outreach and Education Activities 01/31/2007 01/31/2007
Deliverable Complete S: 174. Revised Precious Lands Management Plan 01/31/2007
Deliverable complete T: 119. Administration, Sub-Contracts, Training 01/31/2007 01/31/2007
Deliverable complete U: 132. Annual Report 01/31/2007 01/31/2007

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 1 instance of WE 22 Maintain Vegetation
  • 1 instance of WE 26 Investigate Trespass
  • 1 instance of WE 27 Remove Debris
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 38 Improve Road for Instream Habitat Benefits
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 48 Practice No-till and Conservation Tillage Systems
  • 1 instance of WE 53 Remove Vegetation
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 183 Produce Journal Article
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 NEPA, ESA and Cultural Resources Reports
B 40 Fence Construction
C 186 Maintain Fences, Buildings, and Signs
D 22 Planted Trees, Shrubs, and Herbs
E 26 Livestock and Vehicle Trespass
F 27 Remove Old Fences and Junk
G 38 Road and Trail Maintenance
H 53 Weed Control and Brush Removal
I 47 Plant Native Species
J 48 Plant Ag. Fields
K 115 Assessment Findings Reports
L 157 Data Collection
M 183 Scientific Reports
N 162 Data Analysis
O 159 Data Acquisition and Sharing
P 160 Data Management
Q 118 Local and Regional Coordination
R 99 Outreach and Education Activities
S 174 Revised Precious Lands Management Plan
T 119 Administration, Sub-Contracts, Training
U 132 Annual Report
V 185 Quarterly Reports