Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 27232: 200500400 EXP UPA WHITEHALL WELLS
Project Number:
Title:
Whitehall Property Well Drilling
Stage:
Closed
Area:
Province Subbasin %
Columbia Cascade Entiat 100.00%
Contract Number:
27232
Contract Title:
200500400 EXP UPA WHITEHALL WELLS
Contract Continuation:
Previous: Next:
n/a
Contract Status:
History
Contract Description:
Background:

The Whitehall well would be similiar to the Entiat 4-mile wells project.  The Whitehall Wells project is to eliminate 3 unscreened irrigation diversions on the Entiat River and replace them with 3 groundwater wells.  The three existing surface water pumps are referred to as Upper, Middle, and Lower.  The upper pump screen is a debris screen at the pump, which will pass small fish and impinge large ones.  The middle pump is a hand shallow well that Washington Departmen to Ecology classifies as a surface water diversion because of its locationi n the floodplain.  The pumps are located in a small off-channel pond, which may also be a fish barrier due to the boards used in the pool and the pump in not screened.    The Bureau of Reclamation is desigining the project.  The Chelan County Conservation District is assisting in change in point of diversion permits and permits for construction.

Description of work:  This contract is to fund the Chelan County Conservation District to provide administrative support for permitting, environmental compliance and oversight as well as a subcontract to drill three well to replace surface water diversion for irrigation.
Account Type(s):
Expense
Contract Start Date:
04/15/2006
Contract End Date:
09/30/2009
Current Contract Value:
$69,498
Expenditures:
$69,498

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Cecilia Brown Bonneville Power Administration Yes COR ckbrown@bpa.gov (503) 230-3462
Peggy Entzel Cascadia Conservation District Yes Supervisor peggye@cascadiacd.org (509) 436-1601
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Rich Malinowski Cascadia Conservation District Yes Contract Manager rich.malinowski@wa.nacdnet.net (509) 664-9386
Michael Rickel Cascadia Conservation District Yes Technical Contact miker@cascadiacd.org (509) 436-1601x103
Colleen Spiering Bonneville Power Administration No Env. Compliance Lead caspiering@bpa.gov (503) 230-5756
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Sarah (CCD) Walker Cascadia Conservation District No Administrative Contact sarah-walker@wa.nacdnet.org (509) 664-0271


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Provide BPA Programmatic Information A: 119. Manage Project 05/20/2006 05/20/2006
Produce Environmental Compliance Documentation B: 165. Well Permit 06/01/2006 06/01/2006
Constructed Well C: 82. Install 3 private wells 08/15/2006 08/15/2006
Attach Progress Report in Pisces E: 132. Submit Progress Report for the period (April 2006) to (July 2009) 09/30/2009

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 82 Install Well
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 82 Install Well
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 82 Install Well

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Manage Project
B 165 Well Permit
C 82 Install 3 private wells
D 185 Periodic Status Reports for BPA
E 132 Submit Progress Report for the period (April 2006) to (July 2009)