Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 27480 REL 6: 2003-017-00 EXP ISEMP-TERRAQUA-COORDINATION FOR WENATCHEE- ENT R
Project Number:
Title:
Integrated Status and Effectiveness Monitoring Program (ISEMP)
BPA PM:
Stage:
Complete
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
27480 REL 6
Contract Title:
2003-017-00 EXP ISEMP-TERRAQUA-COORDINATION FOR WENATCHEE- ENT R
Contract Continuation:
Previous: Next:
27480 REL 5: 2003-017-00 EXP ISEMP - TERRAQUA - COORDINATION WENATCHEE/ENTIAT
  • 57863: 2003-017-00 EXP ISEMP - TERRAQUA COODINATION WENATCHEE/ENTIAT R
Contract Status:
Closed
Contract Description:
This contract is for a 10 month period, from September 1, 2011 through June 30, 2012.  This will re-establish the timeline of contract renewal for Terraqua to the renewal data of July1 that has been in place since 2004, a renewal data that allows for a contract to be in place before the start of the field season.  All contract periods hereafter will be 12 months.

This contract contains work elements that are funded under the "Fast Track" budget, including:  Tasks 11.6b, 11.9, 11.10, 11.11, and 11.13.

Contract Description (NEW Eff 10-20-10 DB/CJ): The Integrated Status and Effectiveness Monitoring Program (ISEMP, 2003-017-00) is an ongoing collaborative effort to design, test, implement and evaluate Status and Trends Monitoring for salmon and steelhead populations and their habitat, and watershed-scale Effectiveness Monitoring for management actions impacting salmon and steelhead populations and habitat in the Interior Columbia River Basin.

ISEMP explicitly addresses work requirements of many 2008 FCRPS Biological Opinion RPAs (56.1, 56.2, 56.3, 57.1, 57.2, 57.3, 57.4, 57.5) and is directly related to additional 2008 FCRPS Biological Opinion implementation strategy requirements and recommendations. ISEMP takes a pilot-project approach to the research and development of monitoring by implementing experimental programs in several major subbasins of the Interior Columbia: the Wenatchee, Entiat, Methow, John Day, South Fork Salmon and Lemhi River basins. The overall goal of the project is to provide regional salmon management agencies with the data, information and tools necessary to design efficient and effective monitoring programs.

Specifically, ISEMP generates quantitative guidance on and examples of: the robustness and limitations of population and habitat monitoring protocols, indicators and metrics; sampling design approaches for the distribution of monitoring effort in time and space; analytical approaches to the evaluation of monitoring data, information and programs; effective data management and communication designs that support the use, standardization and compilation of implementation, compliance, status, trends and effectiveness monitoring data by regional data generators and decision makers; and finally the design and implementation of watershed-scale restoration actions to maximize both the biological impact and associated learning opportunities resulting from the design and implementation strategy.

Through its work to date, ISEMP has developed expertise in the coordination and implementation of large-scale monitoring data collection programs. Applying this experience, ISEMP coordinates the installation, maintenance and calibration of in-stream PIT tag arrays across the Snake River basin and is designing and coordinating the implementation of a Columbia River basin-wide stream habitat status and trends monitoring. These programmatic implementation facets of ISEMP leverage previous experience with logistics and social factors to effectively implement comprehensive, standardized monitoring research and development at an unprecedented scale.  

This contract is one of several contracts that will implement this project.


The final report for this contract will contain data that will 1) be submitted to NOAA Fisheries (also a contractor under this project) for use in a project level integrated Annual Report and 2) be submitted to BPA as a contract final report according to the terms of this contract.  Terraqua's role has been, and continues to be, to enable the Bonneville Power Administration to continue to implement Project #2003-017-00 in the Wenatchee and Entiat and other pilot subbasins. Objectives of this work have been, and continue to be:

In 2011,

- Coordinate contract development between Bonneville and entities participating in implementation of the ISEMP program in the Wenatchee/Entiat and other pilot subbasins.

- Coordinate contract implementation between Bonneville and entities participating in the ISEMP program in the Wenatchee/Entiat and other pilot subbasins to ensure that implementation activities meet the purpose and needs of the ISEMP program.

- Implement selected monitoring and analysis activities.

- Analyze and report results related to the implementation of monitoring activities.
Account Type(s):
Expense
Contract Start Date:
09/01/2011
Contract End Date:
06/30/2012
Current Contract Value:
$680,318
Expenditures:
$680,318

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Time and Materials
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
David Byrnes Bonneville Power Administration Yes COR dmbyrnes@bpa.gov (503) 230-3171
Israel Duran Bonneville Power Administration Yes Env. Compliance Lead induran@bpa.gov (503) 230-3967
Chris Jordan National Oceanic and Atmospheric Administration Yes Supervisor chris.jordan@noaa.gov (541) 754-4629
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Pamela Nelle Terraqua, Inc. Yes Technical Contact pamela@terraqua.biz (509) 885-8143
Nicole Rutherford Bonneville Power Administration No Interested Party narutherford@bpa.gov (503) 230-4320
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Michael Ward Terraqua, Inc. Yes Contract Manager mike@terraqua.biz (509) 486-2426


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Meeting minutes / Coordination reports B: 189. 11.1 ISEMP Wenatchee/Entiat/Methow Coordination 06/30/2012
Fish monitoring data from 50 status and trend sites C: 158. 11.10 PIT tagging juvenile salmon and steelhead for UC status and trend monitoring 09/30/2011 09/30/2011
Draft manuscripts D: 162. 11.12 Downstream Migrant Trapping Analysis 06/30/2012
Funding Package - Submit draft to COTR E: 119. 11.13a Project Management (Fast Track) 06/30/2012
Environmental Compliance supporting documentation F: 165. 11.13b Environmental Compliance (Fast Track) 06/30/2012
Final report uploaded to the BPA website G: 132. 11.13d Produce Annual Progress Report for the period Sept 2011 to June 2012(Fast Track) 06/30/2012
Produce final ISEMP Synthesis Program Report H: 141. 11.2 ISEMP Program Synthesis Report 2003-2010 04/16/2012 04/16/2012
Revised ISEMP strategies for the Wenatchee and Entiat subbasins I: 174. 11.3 Wenatchee/Entiat Strategy Updates and Implementation Tracking 06/30/2012
Meeting minutes J: 189. 11.4 ISEMP Pilot Subbasin Coordination 06/30/2012
Updated protocols as necessary K: 174. 11.5 Protocol Development 06/30/2012
Macroinvertebrate Analysis L: 157. 11.6 Macroinvertebrate Analysis 04/30/2012 04/30/2012
Final field data M: 157. 11.7 Entiat IMW - Effectiveness - Habitat Monitoring 06/30/2012
Assist with PIT tagging fish N: 158. 11.8 PIT tag juveniles as part of the Entiat IMW 03/30/2012 03/30/2012
CHaMP habitat data from 75 sites in the Wenatchee, Entiat and Methow watersheds O: 157. 11.9 Fish Habitat Status and Trend Monitoring in three subbasins 11/15/2011 11/15/2011

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 2 instances of WE 174 Produce Plan
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 2 instances of WE 174 Produce Plan
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 07/01/2011
B 189 11.1 ISEMP Wenatchee/Entiat/Methow Coordination 07/01/2011
C 158 11.10 PIT tagging juvenile salmon and steelhead for UC status and trend monitoring 08/18/2011
D 162 11.12 Downstream Migrant Trapping Analysis 07/01/2011
E 119 11.13a Project Management (Fast Track) 07/01/2011
F 165 11.13b Environmental Compliance (Fast Track) 07/01/2011
G 132 11.13d Produce Annual Progress Report for the period Sept 2011 to June 2012(Fast Track) 07/01/2011
H 141 11.2 ISEMP Program Synthesis Report 2003-2010 07/01/2011
I 174 11.3 Wenatchee/Entiat Strategy Updates and Implementation Tracking 07/01/2011
J 189 11.4 ISEMP Pilot Subbasin Coordination 07/01/2011
K 174 11.5 Protocol Development 07/01/2011
L 157 11.6 Macroinvertebrate Analysis 07/01/2011
M 157 11.7 Entiat IMW - Effectiveness - Habitat Monitoring 07/01/2011
N 158 11.8 PIT tag juveniles as part of the Entiat IMW 08/18/2011
O 157 11.9 Fish Habitat Status and Trend Monitoring in three subbasins 09/01/2011