Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 31865: 200301700 EXP CHAR CHANNEL & RIPARIAN HABITAT QUAL - WEN (WDOE)
Project Number:
Title:
Integrated Status and Effectiveness Monitoring Program (ISEMP)
BPA PM:
Stage:
Complete
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
31865
Contract Title:
200301700 EXP CHAR CHANNEL & RIPARIAN HABITAT QUAL - WEN (WDOE)
Contract Continuation:
Previous: Next:
26434: 200301700 CHAR CHANNEL & RIPARIAN HABITAT QUAL - WENATCHEE WDOE
  • 36839: 2003-017-00 EXP ISEMP / WDOE CHAR. CHANNEL/RIPARIAN HAB. QUALITY
Contract Status:
Closed
Contract Description:
The goal and objectives of this contract are as follows:  

1. What are the current habitat conditions and abundance, distribution, life-stage survival, and age-composition of fish  in the Upper Columbia Basin (status monitoring)?
2. How do these factors change over time (trend monitoring)?
3. What effects do tributary habitat actions have on fish populations and habitat conditions (effectiveness monitoring)?

The plan is designed to address these questions and at the same time eliminate duplication of work, reduce costs, and increase monitoring efficiency.  The implementation of valid statistical designs, probabilistic sampling designs, standardized data collection protocols, consistent data reporting methods, and selection of sensitive indicators will increase monitoring efficiency (Currens et al. 2000; Bayley 2002).  

DOE will measure these physical habitat indicators.    In sum, these  indicators address  "outcome" variables (e.g.,  sediment, woody debris, pools, riparian habitat, etc.), as outlined in Hillman and Giorgi (2002) and the Action Agencies/NOAA Fisheries RME Plan.    
(The above is from Hillman 2004 Monitoring Plan for the Upper Columbia)

This contract is one of several contracts that will implement this project.  The FINAL REPORT for this contract will contain data that will 1) be submitted to NOAA FISHERIES (also a contractor under this project) for use in a  project level integrated Annual Report and 2) be submitted to BPA as a contract final report according to the terms of this contract.

Completion of this SOW by the Washington State Department of Ecology (WDOE) will be dependent on the implementation of interrelated Project components, including:

1) Initial site selection will be provided by the ISEMP staff.
2) Reconnaissance of sampling sites will be performed by the an ISEMP designated "Recon Coordinator" from among those ISEMP agencies contracted to BPA.  Prior to the field season, the Recon Coordinator will provide WDOE with directions for physical access and authorization for access to sites on federal lands.
3) Reconnaissance of sampling sites will be performed by Chelan County Conservation District (CCCD) on non-federal properties: Prior to the field season, CCCD will provide WDOE with directions for physical access and authorization from property owners for access to privately-owned sites.
4) Prior to the field season, RTT/NOAA-Fisheries will provide a field sampling protocol (manual) and field forms, each based on Hillman (2004)*, in order that WDOE may properly train its field staff.
5) The WDOE budget is dependent upon their ability to lease a USFS bunkhouse for 5 staff.

*Hillman, T.W. 2004. Monitoring strategy for the Upper Columbia Basin: Draft report February 1, 2004. Prepared for Upper Columbia Regional Technical Team, Wenatchee, Washington
Account Type(s):
Expense
Contract Start Date:
03/01/2007
Contract End Date:
02/29/2008
Current Contract Value:
$171,899
Expenditures:
$171,899

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
David Byrnes Bonneville Power Administration Yes COR dmbyrnes@bpa.gov (503) 230-3171
Terry Holtcamp Jr Bonneville Power Administration Yes Contracting Officer taholtcamp@bpa.gov (503) 230-3518
Debbie Iness Washington Department of Ecology No Administrative Contact dine461@ecy.wa.gov (360) 407-7096
Gary Koshi Washington Department of Ecology No Administrative Contact gkos461@ecy.wa.gov (360) 407-7222
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Jill Lemmon Washington Department of Ecology Yes Technical Contact jlem461@ecy.wa.gov (360) 407-6530
Glenn Merritt Washington Department of Ecology Yes Supervisor gmer461@ecy.wa.gov (360) 407-6777
Dylan Monahan Washington Department of Ecology Yes Contract Manager dymo461@ecy.wa.gov (360) 407-6369
Pamela Nelle Terraqua, Inc. Yes Administrative Contact pamela@terraqua.biz (509) 885-8143
Carol (NOAA) Volk National Oceanic and Atmospheric Administration No Interested Party carol.volk@noaa.gov (206) 302-2465
Michael Ward Terraqua, Inc. Yes Interested Party mike@terraqua.biz (509) 486-2426
Nancy Weintraub Bonneville Power Administration No Env. Compliance Lead nhweintraub@bpa.gov (503) 230-5373


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
NEPA Compliance Review A: 165. Ensure existing compliance is adequate for next year 02/07/2008 02/07/2008
Submission of site sampled data (see specs) B: 157. stream habitat survey 11/30/2007 11/25/2007
Manage/Administer Contract Actions and Deliverables C: 119. characterize riparian habitat quality-Wenatchee subbasin 02/29/2008 02/29/2008
Final report uploaded to the BPA website D: 132. Submit Final Report to NOAA Fisheries and BPA 02/28/2008 02/28/2008

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Ensure existing compliance is adequate for next year 02/09/2007
B 157 stream habitat survey 02/09/2007
C 119 characterize riparian habitat quality-Wenatchee subbasin 02/09/2007
D 132 Submit Final Report to NOAA Fisheries and BPA 02/09/2007
E 185 monthly milestone status report 02/09/2007