| | | | | | | | | |
---|
A | 25237 | 165 | Produce Environmental Compliance Documentation | Environmental Compliance | This project is concerned with coordinating the fieldwork of other agencies participating in the ISEMP and with outreach to disseminate information about the ISEMP. It does not require NOAA, USFWS, or WDFW permits as there is no "take" of fish. As such Environmental Compliance permits are not appropriate in this case. | $100 | 0.09% | 04/02/2007 | 02/29/2008 |
B | 23653 | 157 | Collect/Generate/Validate Field and Lab Data | Water Quality Data in the Wenatchee | Utilizing continuously deployed hydrolabs at 5 sites on the Wenatchee River, collect water quality / nutrient data using previously established collection methods. Data will be submitted to participating agencies. | $77,017 | 69.37% | 04/01/2007 | 02/29/2008 |
C | 23654 | 161 | Disseminate Raw/Summary Data and Results | RM&E Data Management | Consolidate raw water quality data, quality control, and submit to NOAA-Fisheries. | $1,646 | 1.48% | 12/01/2007 | 02/28/2008 |
D | 27169 | 157 | Collect/Generate/Validate Field and Lab Data | Steelhead Spawning survey outreach | Outreach and education to specific landowners about survey and request access permission to conduct Steelhead spawning surveys on private land. | $5,528 | 4.98% | 04/01/2007 | 06/15/2007 |
E | 27231 | 157 | Collect/Generate/Validate Field and Lab Data | Entiat Bridge-to-Bridge Project Monitoring | This work element covers:
- landowner, community and technical staff coordination necessary for monitoring
- project information and sharing data (results) from spawning surveys (numbers of redds) and habitat surveys quantifying physical attributes. | $7,621 | 6.86% | 04/01/2007 | 02/29/2008 |
F | 27233 | 157 | Collect/Generate/Validate Field and Lab Data | Habitat Survey Outreach | Outreach and education to specific landowners about habitat survey and request access permission to conduct physical habitat surveys on private land. | $5,528 | 4.98% | 04/01/2007 | 10/29/2007 |
G | 27234 | 157 | Collect/Generate/Validate Field and Lab Data | Interagency coordination and outreach | Coordinate with Washington Department of Ecology and USFS to identify various survey sites and conduct reconnaissance of site feasibility.
Put together a comprehensive overview of the projects that are underway in the Wenatchee and Entiat subbasins for outreach to landowners via a newsletter or brochure.
Conduct specific outreach for additional projects that may arise in the future, for example outreach for PIT tag detection arrays. | $812 | 0.73% | 04/01/2007 | 02/29/2008 |
H | 23651 | 119 | Manage and Administer Projects | CCCD Integrated Status & Effectiveness Monitoring | Covers work by the contractor to manage and administer on the ground efforts associated with the project. Also covers administrative work in support of on the ground efforts and in support of BPA's programmatic requirements such as monthly Pisces reports, metric reporting, financial reporting (e.g., accruals), and development of an SOW package (includes draft SOW, budget, spending plan, and property inventory). | $11,173 | 10.06% | 09/01/2007 | 02/29/2008 |
I | 23652 | 132 | Produce Progress (Annual) Report | Submit CCCD final (annual) report for the period of performance | A final (annual) report will be prepared for this contract following the guidance listed under the "deliverable specification" section. | $1,331 | 1.20% | 11/01/2007 | 02/29/2008 |
J | 22531 | 185 | Produce CBFish Status Report | Periodic Status Reports for BPA | The Contractor shall report on the status of milestones and deliverables in Pisces. Reports shall be completed either monthly or quarterly as determined by the BPA COTR. Additionally, when indicating a deliverable milestone as COMPLETE, the contractor shall provide metrics and the final location (latitude and longitude) prior to submitting the report to the BPA COTR. | $271 | 0.24% | 07/01/2007 | 02/29/2008 |