Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 36150: 199005500 EXP ID STEELHEAD M&E STUDIES
Project Number:
Title:
Idaho Salmon & Steelhead Monitoring and Evaluation Studies (M&E)
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
36150
Contract Title:
199005500 EXP ID STEELHEAD M&E STUDIES
Contract Continuation:
Previous: Next:
31601: 1990-055-00 IDAHO STEELHEAD M&E STUDY
  • 40650: 199005500 EXP ID STEELHEAD M&E STUDIES
Contract Status:
Closed
Contract Description:
The original experimental design for this study was submitted to BPA in December, 1992 and field work began in 1993 as the Idaho Steelhead Supplementation Project.  Two small scale supplementation experiments were initiated in 1993 and completed in 2004.  In concordance with these supplementation studies, the project's objectives focused on Idaho wild steelhead population dynamics, life-history, and genetics.  The project was renamed Idaho Steelhead Monitoring & Evaluation Studies (ISMES) in 2005.  

In 2008, our monitoring activities will be similar to what was done in 2007.  We will install and operate a weir in Fish Creek to estimate steelhead escapement.  We will also collaborate with other Idaho Fish and Game weirs to estimate adult Steelhead escapement in Rapid River, Pahsimeroi River, upper Salmon River (Sawtooth Weir), Red River and Crooked River.  We plan to continue running screw traps in Fish Creek, Rapid River, Secesh River, and Big Creek (Middle Fork salmon drainage) at Taylor Ranch.  Data from these traps will allow us to gather important life-history data (e.g., length and age of smolts, smolt migration patterns, and number of migrants) from a range of population types.   This juvenile and smolt life-history data will allow comparisons among streams.  We will assess juvenile steelhead abundance in tributary streams of the Lochsa River, Selway River, SF Salmon River, MF Salmon River, and the upper Salmon River.  The ISMES project will continue collecting continuous temperature data at over 40 locations within the Clearwater and Salmon Rivers.  We plan to prepare manuscripts for peer reviewed journals that describe the genetic stock structure of Idaho's steelhead populations, productivity of the Fish Creek population, and if time permits a description of steelhead parr and smolt age and growth in Idaho streams.

ISMES cooperates with and complements the other projects in the Idaho Anadromous Natural Production Program (Idaho Supplementation Studies and Idaho Natural Production Monitoring & Evaluation Project) as well as research conducted by other resource management entities operating in areas upstream of Lower Granite Dam (LGD).  ISMES uses data from a variety of sources from the Snake River drainage that is upstream of LGD and accessible to anadromous salmonids. Collection of these data requires coordination and cooperation among numerous agencies and projects, e.g. the National Marine Fisheries Service (NMFS), the United States Forest Service (USFS), the Nez Perce Tribe (NPT), the Shoshone-Bannock Tribes (SBT), and the United States Fish & Wildlife Service (USFWS).  Internal IDFG cooperators include the Idaho Supplementation Studies (ISS, projects 198909800, 198909801, and 198909802), Lower Snake River Compensation Plan Evaluation, and Idaho Natural Production Monitoring & Evaluation Project (INPMEP project 1991-073-00), and IDFG regional fisheries biologists and managers.

In April of 2008, the scope of ISMES was amended by a Memorandum of Agreement between Bonneville Power and the State of Idaho for a period of 10 years. In the Memorandum, it was noted that additional monitoring is needed for Snake River steelhead, particularly B-run populations. The Memorandum directed that ISMES be modified to incorporate the objective of providing steelhead population status information. Field work was to begin in 2008 and $150,000 was added to the budget. Given the timing of the MOA and contract process in 2008, we decided to conduct sampling of wild steelhead at Lower Granite Dam as a pilot study. This pilot study will focus on spawn year 2009, commencing in fall 2008 and completing in spring 2009. This work will incorporate genetic stock identification and age analysis as provided in Objectives 1 and 7 below. The goal is to assess feasibility of determining age structure and abundance by major drainages.

PROJECT OBJECTIVES

Objective 1: Enumerate adult escapement, age, sex ratios, and run timing at index streams in the Clearwater/Salmon drainages and at Lower Granite Dam.
Objective 2:  Monitor juvenile steelhead abundance in tributaries of the Clearwater and Salmon drainages
Objective 3:  Estimate juvenile steelhead outmigration and timing in tributaries of the Clearwater and Salmon drainages
Objective 4:  Assess age and growth of steelhead juveniles and smolts from tributaries in the Clearwater and Salmon drainages.
Objective 5: Monitor smolt survival from tributary to Lower Granite Dam, through the hydro system, and to adult return.
Objective 6: Develop productivity metrics from wild steelhead stocks in Idaho.
Objective 7: Monitoring of the temporal and spatial genetic patterns of steelhead populations in Idaho
Objective 8:  Monitor water temperatures in selected tributaries of the Clearwater and Salmon drainages.
Account Type(s):
Expense
Contract Start Date:
01/01/2008
Contract End Date:
12/31/2008
Current Contract Value:
$738,491
Expenditures:
$738,491

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Permits obtained to do field work A: 165. Project Permitting 02/28/2008 04/10/2008
Measure Stream Temperature in Clearwater River Tributaries B: 157. Measure Stream Temperature (Clearwater River) 12/31/2008 12/31/2008
Measure Stream Temperature in Salmon River Tributaries C: 157. Measure Stream Temperature (Salmon River) 12/31/2008 12/31/2008
Install and operate temporary weir in Fish Creek D: 157. Install and Operate Fish Creek Weir (Clearwater River) 08/31/2008 12/31/2008
Install and Operate Screw Traps in Fish Creek E: 157. Install and Operate Screw Traps (Clearwater River - Fish Creek) 12/31/2008 12/31/2008
Install and Operate Screw Traps in the Salmon River Basin F: 157. Install and Operate Screw Traps (Salmon River - Rapid River, Secesh River, and Big Creek) 12/01/2008 12/01/2008
DNA tissue collection at Salmon River tributaries, traps, and weirs G: 157. Collect DNA Tissue Samples (Salmon River & Tribs) 11/21/2008 11/21/2008
DNA tissue collection in the Clearwater River tributaries, traps, and weirs H: 157. Collect DNA Tissue Samples (Clearwater River & Tribs 11/21/2008 11/21/2008
PIT tagging steelhead juveniles in Clearwater streams I: 158. PIT tag juveniles in streams (Clearwater River & Tribs) 11/29/2008 11/29/2008
PIT tagging Steelhead juveniles in Salmon River tributaries J: 158. PIT tag juveniles in streams (Salmon River - Md. Fork, S. Fork and Little Salmon) 11/29/2008 11/29/2008
Snorkel surveys in Clearwater R. Tributaries K: 157. Snorkel streams to estimate juvenile densities (Clearwater River & Tribs) 08/29/2008 08/29/2008
Snorkel surveys in Salmon R. Tributaries L: 157. Snorkel streams to estimate juvenile densities (Tribs to Main Salmon R, SF, MF, Upper and Little) 08/31/2008 08/31/2008
Adult steelhead sampling in Big Creek M: 157. Sample adult steelhead in Big Creek (Salmon River - Middle Fk/Big Creek) 06/30/2008 05/09/2008
Upload PIT tag Files N: 159. Manage PIT Tag Files 11/21/2008 11/21/2008
Provide information to IDFG staff or other regional entities O: 161. Submit data to IDFG & other regional managers 12/31/2008 12/31/2008
Databases updated with 2008 data P: 160. Maintain Databases 12/31/2008 12/31/2008
2007 Stream temperature data summarized Q: 162. Summarize stream temperature data 04/01/2008 04/01/2008
Determine the age of juvenile and adult steelhead R: 162. Estimate ages of adult and juvenile steelhead collected in 2007 04/01/2008 04/01/2008
Estimated Juvenile production for ISMES streams S: 162. Estimate 2007 juvenile steelhead production and timing 04/01/2008 04/01/2008
2007 steelhead smolt to adult survival estimates T: 162. Estimate survival of 2007 steelhead smolt migration 04/01/2008 04/01/2008
Juvenile steelhead density estimates U: 162. Estimate fish densities in snorkeled tributaries 04/01/2008 04/01/2008
Genotype and analyze genetic tissue samples V: 162. *Genotype and analyze genetic tissues and results 12/31/2008 12/31/2008
Adult steelhead escapement into Idaho Index streams. W: 162. Estimate 2007 adult steelhead escapement 10/31/2008 10/31/2008
Journal articles X: 183. Prepare/Submit Journal Articles 12/31/2008 12/31/2008
2006 Annual Report Y: 132. Produce Annual Report for 2006 08/31/2007 01/31/2008
2007 Annual Report Z: 132. Produce Annual Report for 2007 08/31/2008 12/01/2008
Manage project administration and coordination AA: 119. Manage Project 12/31/2008 12/31/2008
Scale and tissue sample collection AC: 157. **Sample adult steelhead at Lower Granite Dam 12/15/2008 12/15/2008
Determine the age of wild adult steelhead AD: 162. **Estimate ages of adult steelhead collected in fall 2008 12/31/2008 12/31/2008

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 183 Produce Journal Article
  • 11 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 158 Mark/Tag Animals
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 8 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Project Permitting 02/09/2007
B 157 Measure Stream Temperature (Clearwater River) 04/10/2008
C 157 Measure Stream Temperature (Salmon River) 04/10/2008
D 157 Install and Operate Fish Creek Weir (Clearwater River) 04/10/2008
E 157 Install and Operate Screw Traps (Clearwater River - Fish Creek) 04/10/2008
F 157 Install and Operate Screw Traps (Salmon River - Rapid River, Secesh River, and Big Creek) 04/10/2008
G 157 Collect DNA Tissue Samples (Salmon River & Tribs) 04/10/2008
H 157 Collect DNA Tissue Samples (Clearwater River & Tribs 04/10/2008
I 158 PIT tag juveniles in streams (Clearwater River & Tribs) 04/10/2008
J 158 PIT tag juveniles in streams (Salmon River - Md. Fork, S. Fork and Little Salmon) 04/10/2008
K 157 Snorkel streams to estimate juvenile densities (Clearwater River & Tribs) 04/10/2008
L 157 Snorkel streams to estimate juvenile densities (Tribs to Main Salmon R, SF, MF, Upper and Little) 04/10/2008
M 157 Sample adult steelhead in Big Creek (Salmon River - Middle Fk/Big Creek) 04/10/2008
N 159 Manage PIT Tag Files 02/09/2007
O 161 Submit data to IDFG & other regional managers 02/09/2007
P 160 Maintain Databases 02/09/2007
Q 162 Summarize stream temperature data 02/09/2007
R 162 Estimate ages of adult and juvenile steelhead collected in 2007 02/09/2007
S 162 Estimate 2007 juvenile steelhead production and timing 02/09/2007
T 162 Estimate survival of 2007 steelhead smolt migration 02/09/2007
U 162 Estimate fish densities in snorkeled tributaries 02/09/2007
V 162 *Genotype and analyze genetic tissues and results 02/09/2007
W 162 Estimate 2007 adult steelhead escapement 02/09/2007
X 183 Prepare/Submit Journal Articles 02/09/2007
Y 132 Produce Annual Report for 2006 02/09/2007
Z 132 Produce Annual Report for 2007 02/09/2007
AA 119 Manage Project 02/09/2007
AB 185 Periodic Status Reports for BPA 02/09/2007
AC 157 **Sample adult steelhead at Lower Granite Dam 02/09/2007
AD 162 **Estimate ages of adult steelhead collected in fall 2008 02/09/2007