Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 38292: 2007-127-00 EXP NPT SOUTH FORK SALMON WATERSHED RESTORATION
Project Number:
Title:
East Fork of South Fork Salmon River Passage Restoration
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
38292
Contract Title:
2007-127-00 EXP NPT SOUTH FORK SALMON WATERSHED RESTORATION
Contract Continuation:
Previous: Next:
33331: 2007 127 00 EXP NPT EFSF SALMON RIV PASSAGE RESTORATION
  • 41069: 200712700 EXP NPT SOUTH FORK SALMON WATERSHED RESTORATION
Contract Status:
Closed
Contract Description:
Contract Summary:

Due to the delay in the issuance of the Federal Columbia River Power System Biological Opinion (FCRPS BiOp), the East Fork of the South Fork Salmon River Passage Restoration project did not begin in fiscal year 2007 as originally planned.  A pre-implementation planning and coordination contract was issued in FY 2007 to begin the necessary project planning and environmental compliance requirements with the Payette National Forest (PNF) and the Boise National Forest (BNF) while the BiOp awaited resolution.  Because no implementation began in FY 07, the private landowner in the project focal area entered into a lease to purchase agreement with the Vista Gold mining company who has begun exploratory research to determine the feasibility of re-initiating mining activities.

Since steelhead, spring Chinook, bull trout and westslope cutthroat trout passage can not currently be restored through the old Stibnite Mine Site as originally proposed due to lack of landowner consent, the Nez Perce Tribe and Forest Service (PNF and BNF) proposed several other high priority habitat restoration actions throughout the South Fork Salmon watershed to provide the same or more biological benefit to the corresponding fish population groups.  This change in scope request was approved by the Budget Oversight Group (BOG), and the geographic area of the project increased from one small site on the East Fork of the South Fork Salmon river to many habitat improvement sites throughout the South Fork Salmon watershed.  

Instead of restoring fish passage through the former mine site using a natural step pool configuration, reconnecting the floodplain, re-vegetating the riparian area and increasing instream habitat complexity within one small area of the subwatershed, the NPT, PNF and BNF will now replace fish passage barrier culverts, reconnect floodplains, re-vegetate riparian areas, increase instream habitat complexity and decommission roads within the entire South Fork Salmon watershed.  As a result, the potential to provide direct biological benefit to the anadromous and resident fish populations is greatly increased over a much larger geographic area for the same quantity of funds.

Summary of FY 08 Implementation:

Nez Perce Tribe (NPT) Watershed Restoration follows a ridge top to ridge top approach including implementation focused on increasing aquatic habitat connectivity and decreasing resource impacts from roads. The cost share on this project will be contributed by the Payette National Forest who provides an approximate 30% match including cash and in-kind contributions.

FY 08 implementation includes two culvert replacements, native revegetation, in-stream habitat complexity structure installation, a comprehensive road inventory and assessment to prioritize future road decommissioning, outreach and education to landowners, the public and students, and the associated project implementation effectiveness monitoring and evaluation.  Following the September 10, 2008 BOG meeting request to have an in-year transfer of $142,000 FY09 funds to FY08 to subcontract the implementation of the Parks Creek Bridge.
Account Type(s):
Expense
Contract Start Date:
07/01/2008
Contract End Date:
03/31/2009
Current Contract Value:
$242,732
Expenditures:
$242,732

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

Contract(s):

38292

Dimensions: 2000 x 1294

Contract(s):

38292

Dimensions: 779 x 502

Contract(s):

38292

Dimensions: 778 x 501

Contract(s):

38292

Dimensions: 917 x 593

Contract(s):

38292

Dimensions: 800 x 517

Contract(s):

38292

Dimensions: 801 x 517

Description: photo of design drawing shhet

Contract(s):

38292

Dimensions: 2000 x 1293

Description: Parks Creek Bridge Design Drawing

Contract(s):

38292

Dimensions: 2000 x 1293

Description: Parks Creek Design Drawing #3

Contract(s):

38292

Dimensions: 2000 x 1292


Full Name Organization Write Permission Contact Role Email Work Phone
Jan Brady Bonneville Power Administration Yes COR jebrady@bpa.gov (503) 230-4514
Amanda Hendrix Nez Perce Tribe Yes Technical Contact amandah@nezperce.org (208) 621-3542
Arleen Henry Nez Perce Tribe No Administrative Contact arleenh@nezperce.org (208) 621-3833
Bruce Hollen Bonneville Power Administration No Env. Compliance Lead bahollen@bpa.gov (503) 230-5756
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Mark D. Reaney, Jr. P.E. Nez Perce Tribe Yes Contract Manager markr@nezperce.org (208) 843-7144x3558
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
NEPA, ESA, and Cultural Resources documentation submitted to BPA A: 165. Provide Environmental Compliance Documentation to BPA 08/01/2008 09/24/2008
Final designs and NPT-Valley County MOU B: 175. Design Fish Barrier Culvert Replacement Projects 07/25/2008 07/25/2008
Profile Creek culvert replaced C: 184. Replace Profile Creek Culvert 10/15/2008
Install large woody debris structures D: 29. Install Large Woody Debris in Profile Creek Project Area 08/31/2008
Revegetate approximately 0.15 acres in Profile Creek project area E: 47. Plant Native Vegetation & Grass Seed in Profile Creek Project Area 10/31/2008
Salt Creek culvert replaced F: 184. Replace Salt Creek Culvert 10/15/2008
Revegetate approximately 0.15 acres in Profile Creek project area G: 47. Plant Native Vegetation & Grass Seed in Salt Creek Project Area 10/31/2008
Culvert data collected for Year 0 following construction H: 157. Collect Data on Culvert Replacements 11/30/2008
Data analyzed and 2008 report completed I: 162. Analyze Culvert Replacement Data 02/28/2009
GIS database and road treatment prescriptions J: 115. South Fork Salmon Road Inventory 01/30/2009 12/29/2008
Roads selected for decommissioning in 2009 K: 114. Select Roads to be Decommissioned in 2009 03/31/2009 01/28/2009
Provide outreach and education for the public L: 99. Provide Outreach and Education for the Public 03/31/2009
FY 09 SOW package and FY 08 accrual estimate M: 119. Project Management, Coordination, and Administration 01/16/2009 01/16/2009
Final FY 08 annual report attached to this contract N: 132. Produce Annual Report for Period 7/1/08 - 3/31/09 03/31/2009 03/31/2009

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 2 instances of WE 47 Plant Vegetation
  • 2 instances of WE 184 Install Fish Passage Structure
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 2 instances of WE 47 Plant Vegetation
  • 2 instances of WE 184 Install Fish Passage Structure
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 2 instances of WE 47 Plant Vegetation
  • 2 instances of WE 184 Install Fish Passage Structure
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Provide Environmental Compliance Documentation to BPA 02/09/2007
B 175 Design Fish Barrier Culvert Replacement Projects 02/09/2007
C 184 Replace Profile Creek Culvert 09/24/2008
D 29 Install Large Woody Debris in Profile Creek Project Area
E 47 Plant Native Vegetation & Grass Seed in Profile Creek Project Area 09/24/2008
F 184 Replace Salt Creek Culvert 09/24/2008
G 47 Plant Native Vegetation & Grass Seed in Salt Creek Project Area 09/24/2008
H 157 Collect Data on Culvert Replacements 09/24/2008
I 162 Analyze Culvert Replacement Data 02/09/2007
J 115 South Fork Salmon Road Inventory 10/03/2008
K 114 Select Roads to be Decommissioned in 2009 02/09/2007
L 99 Provide Outreach and Education for the Public 02/09/2007
M 119 Project Management, Coordination, and Administration 02/09/2007
N 132 Produce Annual Report for Period 7/1/08 - 3/31/09 02/09/2007
O 185 Periodic Pisces Status Reports for BPA 02/09/2007