Obtain environmental compliance |
B: 165. Produce Environmental Compliance Documentation for all applicable work on Coho Reintroduction |
|
01/29/2010 |
01/29/2010 |
Proceed with the Master Plan revisions/edits/programmatic changes |
C: 168. Continuing through Step 1 towards Wenatchee/Methow long term plan |
|
03/02/2009 |
03/02/2009 |
Facility Design, Facility Permitting, Studies, and Surveys for the Step 2 process |
D: 169. Begin the Step 2 process towards implementation of Long-Term Plan |
|
01/31/2010 |
|
Conduct and document maintenance and repair activities |
E: 61. Subcontract O&M for maintenance of facilities |
|
01/29/2010 |
01/29/2010 |
Manage and administer project, September 1 , 2008 through January 31, 2010 |
F: 119. Manage and Administer 2008-2010 Project for Mid Columbia Coho Restoration |
|
01/31/2010 |
|
Collection of 2008 Coho Broodstock: Wenatchee and Methow programs |
G: 66. Trap 2008 broodstock at Dryden, Tumwater, Wells, and LNFH |
|
12/08/2008 |
11/19/2008 |
Spawn 2008 brood coho at ENFH |
H: 64. Spawn 2008 brood coho at Entiat NFH |
|
11/28/2008 |
11/24/2008 |
Spawn 2008 coho broodstock at Winthrop NFH |
I: 64. Spawn 2008 brood coho at Winthrop NFH |
|
11/26/2008 |
11/17/2008 |
Carcass distribution for 2008 BY broodstock |
J: 44. Carcass dispersal of a portion of 2008 broodstock in the Wenatchee and Methow River basins |
|
01/15/2009 |
01/15/2009 |
Incubate 2008 Wenatchee brood coho eggs at the Peshastin Incubation Facility |
K: 59. Incubate 2008 brood coho eggs at the Peshastin Incubation Facilities |
|
01/12/2009 |
01/12/2009 |
Transport 2008 BY eyed coho eggs to rearing facilities |
L: 66. Transport 2008 brood eyed-eggs from incubation facilities to rearing facilities |
|
01/16/2009 |
01/16/2009 |
Coho redd counts and spawning composition for the 2008 BY |
M: 157. Conduct spawning ground surveys for the 2008 brood in the Wenatchee Basin |
|
01/30/2009 |
12/31/2008 |
2008 BY coho redd counts and spawning composition |
N: 157. Conduct spawning ground surveys for the 2008 brood in the Methow Basin |
|
12/15/2008 |
12/24/2008 |
Completed database |
O: 157. Collect biological data from 2008 brood coho at spawning |
|
01/09/2009 |
01/09/2009 |
CWT recovery data from the 2008 BY |
P: 157. Extract CWT from 2008 brood coho snouts collected at spawning and on spawning ground surveys |
|
02/16/2009 |
02/16/2009 |
CWT data |
Q: 157. Read and Record CWTs from 2008 brood |
|
03/02/2009 |
03/02/2009 |
Juvenile fish transfer of the 2007 BY for overwintering at Leavenworth NFH |
R: 66. Transport BY07 coho from LCR facilities and/or Entiat NFH to LNFH for overwinter acclimation |
|
11/14/2008 |
11/14/2008 |
PIT tag fish 2007 BY |
S: 158. Mark/Tag Animals - PIT-tag 35,000 BY07 coho pre-smolts |
|
02/28/2009 |
02/28/2009 |
Analyze data from 2008 BY |
T: 162. Analyze and interpret M&E data from 2008 brood |
|
01/31/2010 |
01/31/2010 |
Acclimated smolts released |
U: 56. Acclimation/Release: Wenatchee: Coulter Cr. pond (BY 2007) |
|
05/01/2009 |
06/18/2009 |
Acclimated smolts released |
V: 56. Acclimation/Release: Wenatchee: Beaver Cr. pond (BY 2007) |
|
05/04/2009 |
06/18/2009 |
Acclimated smolts released |
W: 56. Acclimation/Release: Wenatchee: Rolfing's pond (BY 2007) |
|
05/01/2009 |
06/18/2009 |
Acclimated smolts released |
X: 56. Acclimation/Release: Wenatchee: Nason Cr. wetlands (BY 2007) |
|
05/01/2009 |
04/10/2009 |
Acclimated smolts released |
Y: 56. Acclimation/Release: Wenatchee: Butcher Creek Pond (BY 2007) |
|
05/01/2009 |
06/18/2009 |
Acclimated smolts released |
Z: 56. Acclimation/Release: Wenatchee: Leavenworth NFH (BY 2007) |
|
04/27/2009 |
04/28/2009 |
Acclimated smolts released |
AA: 56. Acclimation/Release: Wells Fish Hatchery (BY 2007) |
|
05/01/2009 |
05/04/2009 |
Acclimated smolts released |
AB: 56. Acclimation/Release: Methow: Twisp Ponds (BY 2007) |
|
05/01/2009 |
05/04/2009 |
CWT tag fish 2008 BY |
AC: 158. Mark/Tag Animals - Subcontract CWT of approximately 1,500,000 BY08 coho pre-smolts |
|
09/30/2009 |
09/30/2009 |
Coho rearing long-term at Entiat NFH |
AD: 56. long-term rearing: Wenatchee: Entiat NFH (BY 2007) |
|
11/30/2008 |
02/27/2009 |
Enter data |
AE: 160. Enter data into and maintain local databases |
|
09/30/2009 |
12/30/2009 |
Collection of 2009 Coho Broodstock |
AF: 66. Trap 2009 broodstock at Dryden, Tumwater, Wells, and LNFH |
|
12/08/2009 |
12/08/2009 |
Out-plant a portion of 2009 coho returns: LNFH ladder to Nason Creek |
AG: 66. Outplant a portion of the 2009 returns collected at LNFH to the upper Wenatchee Basin |
|
12/08/2009 |
|
Spawn 2009 brood coho at ENFH |
AH: 64. Spawn 2009 brood coho at Entiat NFH |
|
11/28/2009 |
11/28/2009 |
Spawn 2009 coho broodstock at Winthrop NFH |
AI: 64. Spawn 2009 brood coho at Winthrop NFH |
|
11/26/2009 |
11/26/2009 |
Incubate 2009 Wenatchee brood coho eggs at the Peshastin Incubation Facility |
AJ: 59. Incubate 2009 brood coho eggs at the Peshastin Incubation Facilities |
|
01/15/2010 |
01/15/2010 |
Carcass distribution for 2009 BY broodstock |
AK: 44. Carcass dispersal of a portion of 2008 broodstock in the Wenatchee and Methow River basins |
|
01/15/2010 |
01/15/2010 |
Transport 2009 BY eyed coho eggs to rearing facilities |
AL: 66. Transport 2009 brood eyed-eggs from incubation facilities to rearing facilities |
|
01/12/2010 |
01/12/2010 |
Coho redd counts and spawning composition for the 2009 BY |
AM: 157. Conduct spawning ground surveys for the 2009 brood in the Wenatchee Basin |
|
01/29/2010 |
01/29/2010 |
2009 BY coho redd counts and spawning composition |
AN: 157. Conduct spawning ground surveys for the 2009 brood in the Methow Basin |
|
12/18/2009 |
12/18/2009 |
Completed database |
AO: 157. Collect biological data from 2009 brood coho at spawning |
|
12/18/2009 |
12/18/2009 |
CWT recovery data from the 2009 BY |
AP: 157. Extract CWT from 2009 brood coho snouts collected at spawning and on spawning ground surveys |
|
01/29/2010 |
01/29/2010 |
CWT data |
AQ: 157. Read and Record CWTs from 2009 brood |
|
01/31/2010 |
01/31/2010 |
PIT tag fish 2008 BY |
AR: 158. Mark/Tag Animals - PIT-tag 35,000 BY08 coho smolts |
|
01/31/2010 |
01/31/2010 |
Analyze and report juvenile survival data for 2006 brood released in 2008 |
AS: 162. Analyze/Interpret 2006 BY Data to calculate juvenile survival rates from release to McNary Dam |
|
01/31/2010 |
01/31/2010 |
Collect data from 2007 and 2008 BY |
AT: 157. Collect/Generate Field and Lab Data to determine 2009 emergence timing, growth and distribution |
|
09/01/2009 |
09/01/2009 |
Publish feasibility study results |
AU: 183. Publish feasibility study results |
|
01/31/2010 |
|
FY 08 progress report uploaded/attached in Pisces |
AV: 132. Submit Annual Report for the period (10/1/07 to 09/30/08) |
|
04/10/2009 |
04/10/2009 |
FY 09 progress report uploaded/attached in Pisces |
AW: 132. Submit Annual Report for the period (10/1/08 to 09/30/09) |
|
01/29/2010 |
|
Juvenile fish transfer of the 2008 BY for overwintering at Leavenworth NFH |
AX: 66. Transport BY08 coho from LCR facilities and/or Entiat NFH to LNFH for overwinter acclimation |
|
11/14/2009 |
10/29/2009 |