Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 40083: 199603501 EXP YAKAMA RESERVATION WATERSHEDS PROJECT
Project Number:
Title:
Yakama Reservation Watershed Project
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Yakima 100.00%
Contract Number:
40083
Contract Title:
199603501 EXP YAKAMA RESERVATION WATERSHEDS PROJECT
Contract Continuation:
Previous: Next:
35636: 199603501 EXP YAKAMA RESERVATION WATERSHEDS PROJECT
  • 44614: 1996-035-01 EXP YAKAMA RESERVATION WATERSHEDS PROJECT
Contract Status:
Closed
Contract Description:
The YRWP works to restore natural function to the Satus, Toppenish and Ahtanum Watersheds. Our restoration and monitoring efforts take a comprehensive approach to the restoration of habitat for fisheries resources including steelhead and bull trout.
Account Type(s):
Expense
Contract Start Date:
10/01/2008
Contract End Date:
09/30/2009
Current Contract Value:
$987,794
Expenditures:
$987,794

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Sandra Ackley Bonneville Power Administration No Interested Party sjackley@bpa.gov (503) 230-3824
Shannon Adams Yakama Confederated Tribes Yes Technical Contact adas@yakamafish-nsn.gov (509) 945-0754
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
Darlene Eyle Yakama Confederated Tribes No Administrative Contact darlenee@yakama.com (509) 865-5121
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Jay Marcotte Bonneville Power Administration Yes COR jgmarcotte@bpa.gov (503) 230-3943
Lisa Marko MacLellan Bonneville Power Administration No Env. Compliance Lead lmmarko@bpa.gov (503) 230-4047
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Steve Parker Yakama Confederated Tribes No Supervisor pars@yakamafish-nsn.gov (509) 865-6262x6342
Brandon Rogers Yakama Confederated Tribes Yes Contract Manager rogb@yakamafish-nsn.gov (509) 949-4109
Jennifer Stolz Bonneville Power Administration Yes Interested Party jpstolz@bpa.gov (503) 230-3233
Paul Ward Yakama Confederated Tribes No Supervisor warp@yakamafish-nsn.gov (509) 949-4129


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
projects managed B: 119. Manage Restoration Projects 09/30/2009 09/01/2009
List of Selected Projects (and contingency projects) to be implemented in 2008 C: 114. Select habitat improvement actions for 2010 08/15/2009 08/15/2009
Project databases that are maintained and up to date. D: 160. Update Project Database 09/30/2009 09/30/2009
Disseminated data E: 161. Create informal summary reports and maps 09/30/2009 09/30/2009
5 outreach sessions completed F: 99. Conduct field and classroom education at local schools 09/30/2009 09/30/2009
Technical review and input provided to various policy and planning efforts G: 122. Input to various Tribal planning and policy efforts 09/30/2009 09/30/2009
Completed environmental documentation H: 165. Environmental Compliance 01/01/2009 02/02/2009
Completed FY 08 Annual Report submitted to BPA I: 132. Produce Project Annual Report for FY 08 11/28/2008 12/30/2008
Lease Range Units 7, 8a, 9 and 16 to defer grazing J: 92. Lease Range Units in the Logy Creek Watershed 03/10/2009 03/11/2009
3 rotary screw traps deployed and recovered K: 70. Deploy and Recover 5ft Rotary Screw Traps 06/08/2009 06/08/2009
3 miles of completed snorkel surveys L: 157. Snorkel Survey NF Simcoe Creek 09/30/2009 09/30/2009
3 miles of completed snorkel surveys M: 157. Snorkel Survey Mid Toppenish Creek 09/30/2009 09/30/2009
3 miles of completed snorkel surveys N: 157. Snorkel Survey Ahtanum Creek Diversions 09/30/2009 09/30/2009
3 miles of completed snorkel surveys O: 157. Snorkel Survey Ahtanum Creek Forks index site 09/30/2009 09/30/2009
3 miles of completed snorkel surveys P: 157. Snorkel Survey Dry and Logy Creek index sites 09/30/2009 09/30/2009
Data collected and ready to be entered into the Project's databases. Q: 157. Collect Field Data 09/30/2009 09/30/2009
complete 1 mile of surveys R: 157. Timber, Fish and Wildlife (TFW) surveys 09/30/2009 09/30/2009
Completed sediment inventories and database S: 157. Conduct Sediment Inventories 09/30/2009 09/30/2009
Wapato Irrigation Project diversions managed for minimum instream flow. T: 186. Manage Operation of Upper and Lower WIP canals on Ahtanum Creek 09/30/2009 09/30/2009
Winter stock water diversion managed at Olney lateral U: 186. Assist with Summer Operation of Olney Lateral 09/30/2009 09/30/2009
Functioning fences, wells and stock tanks V: 186. Maintain livestock wells/stock tanks/livestock fences/improved springs 09/30/2009 09/30/2009
Completed 3/4 miles of fence W: 40. Riparian Fence A 09/30/2009 09/30/2009
Construction of approximately 5 grade control structures X: 29. MF Dry Creek Grade Control Structures 09/30/2009
Remove Culvert from Middle Fork Dry Creek Y: 29. MF Dry Creek Culvert Removal 09/30/2009
2 wells converted to stock wells Z: 34. Convert existing wells to stock wells 09/30/2009 09/30/2009
Construct Grade Control in Lincoln Meadow AA: 29. Lincoln Meadow-- Construct Grade Control Structures 09/30/2009
Construct Grade Control in Rentchler's Meadow AB: 29. Rentchler's Meadow-- Construct Grade Control Structures 09/30/2009
Construct Grade Control in Starvation Flats AC: 29. Starvation Flats-- Construct Grade Control Structures 09/30/2009
6 miles of completed meadow exclosure fence AD: 40. Camas Patch Exclosure Fence 09/30/2009 09/30/2009
Construct stock watering pipeline along Ahtanum Ridge AE: 149. Ahtanum Ridge-- Install Stockwater Pipeline 09/30/2009
Plans for one or several engineered log jams. AF: 174. Ahtanum Creek Engineered Log Jam (ELJ) Project 09/30/2009 09/30/2009
One engineered plan for reconnecting Lincoln Meadow with its watercourse. AG: 174. Lincoln Meadow-- Engineer Grade Control Structures in Lincoln Meadow 09/30/2009 09/30/2009
Engineered plans for constructing grade control structures in Rentchler's Meadow & Starvation Flats AH: 174. Rentchler's Meadow and Starvation Flats-- Engineer Grade Control Structures in these meadows 06/01/2009 06/01/2009
Remove Satus Dam AI: 84. Remove Satus Creek Dam 09/30/2009 09/30/2009

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 8 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 149 Install Pipeline
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 174 Produce Plan
  • 8 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 149 Install Pipeline
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 3 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 5 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 34 Develop Alternative Water Source
  • 2 instances of WE 40 Install Fence
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 92 Lease Land
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 3 instances of WE 174 Produce Plan
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 8 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 149 Install Pipeline
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 8 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 149 Install Pipeline

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/09/2007
B 119 Manage Restoration Projects 02/09/2007
C 114 Select habitat improvement actions for 2010 02/09/2007
D 160 Update Project Database 02/09/2007
E 161 Create informal summary reports and maps 02/09/2007
F 99 Conduct field and classroom education at local schools 02/09/2007
G 122 Input to various Tribal planning and policy efforts 02/09/2007
H 165 Environmental Compliance 02/09/2007
I 132 Produce Project Annual Report for FY 08 02/09/2007
J 92 Lease Range Units in the Logy Creek Watershed 08/10/2009
K 70 Deploy and Recover 5ft Rotary Screw Traps 02/09/2007
L 157 Snorkel Survey NF Simcoe Creek 08/10/2009
M 157 Snorkel Survey Mid Toppenish Creek 08/10/2009
N 157 Snorkel Survey Ahtanum Creek Diversions 08/10/2009
O 157 Snorkel Survey Ahtanum Creek Forks index site 08/03/2009
P 157 Snorkel Survey Dry and Logy Creek index sites 08/03/2009
Q 157 Collect Field Data 08/03/2009
R 157 Timber, Fish and Wildlife (TFW) surveys 09/01/2009
S 157 Conduct Sediment Inventories
T 186 Manage Operation of Upper and Lower WIP canals on Ahtanum Creek 08/03/2009
U 186 Assist with Summer Operation of Olney Lateral 08/03/2009
V 186 Maintain livestock wells/stock tanks/livestock fences/improved springs
W 40 Riparian Fence A
X 29 MF Dry Creek Grade Control Structures
Y 29 MF Dry Creek Culvert Removal 02/09/2007
Z 34 Convert existing wells to stock wells
AA 29 Lincoln Meadow-- Construct Grade Control Structures
AB 29 Rentchler's Meadow-- Construct Grade Control Structures 08/03/2009
AC 29 Starvation Flats-- Construct Grade Control Structures
AD 40 Camas Patch Exclosure Fence
AE 149 Ahtanum Ridge-- Install Stockwater Pipeline
AF 174 Ahtanum Creek Engineered Log Jam (ELJ) Project 02/09/2007
AG 174 Lincoln Meadow-- Engineer Grade Control Structures in Lincoln Meadow 02/09/2007
AH 174 Rentchler's Meadow and Starvation Flats-- Engineer Grade Control Structures in these meadows 02/09/2007
AI 84 Remove Satus Creek Dam 08/03/2009