Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 40432: 199801005 EXP FALL CHINOOK SUPPLEMENTATION
Project Number:
Title:
Fall Chinook Acclimation Facilities on Snake/Clearwater Rivers
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Blue Mountain Snake Hells Canyon 100.00%
Contract Number:
40432
Contract Title:
199801005 EXP FALL CHINOOK SUPPLEMENTATION
Contract Continuation:
Previous: Next:
36041: 199801005 EXP FALL CHINOOK SUPPLEMENTATION
  • 45293: 199801005 EXP FALL CHINOOK SUPPLEMENTATION
Contract Status:
Closed
Contract Description:
AUTHORIZATION:
US vs. OR, Production Advisory Committee, supported and directed the construction and operation of acclimation and release facilities for Snake River fall Chinook from Lyons Ferry Hatchery at three sites above Lower Granite Dam.  These projects were constructed as part of a funding package ($5.0 million add-on) provided by the Corps of Engineer's headquarters to the Walla Walla District to comply with the language in a Senate conference report (Senate Report, 103-672, P7) describing desired work to be accomplished under the Lower Snake River Fish and Wildlife Compensation Plan.
The conference report specified that:
          "Only projects which will protect, maintain, and enhance biological diversity of existing wild stocks should be pursued."
A portion of the conference report language provides for final rearing and/or acclimation facilities for fall Chinook on the Snake River.  Snake River fall Chinook have been listed as a threatened species by NMFS under the Endangered Species Act.  The progeny of fish released by the project will be listed fish, thus the project will directly contribute to recovery of a listed species.
Funding for planning, engineering, conceptual design, NEPA, and construction has been secured from the COE.

FACILITIES:
The project is located in the Blue Mountain Province and the Snake Hells Canyon Sub Basin.  Two acclimation facilities, Capt. John Rapids and Pittsburg Landing are located on the Snake River between Asotin, WA. and Hells Canyon Dam and one facility is located on the Clearwater River at Big Canyon.  The Capt. John Rapids facility is a single pond while Pittsburg Landing and Big Canyon sites consist of portable fish rearing tanks assembled and dissembled each year.  Acclimation of 450,000 smolts (150,000 each facility) begins in February and ends 10 weeks later.  Acclimate up to 1.4 million sub-yearlings for 4 weeks following the yearling release.

FY09 PROJECT GOALS:
This is a supplementation project; in that hatchery produced fish will be released into the natural spawning habitat in an effort to return a greater number of spawners and hence natural production.  The stock selected for release is the only Snake River basin origin hatchery stock in the Pacific Northwest and the hatchery propagating the stock has been designated as a gene bank for Snake River fall Chinook.  This is a long-term project, and will ultimately work towards achieving delisting goals established by NMFS.

Deliverables for this project include:    
                                     Acclimate and release 450,000 yearling smolts
                                     Acclimate and release 1,400,000 sub-yearling smolts
Account Type(s):
Expense
Contract Start Date:
01/01/2009
Contract End Date:
12/31/2009
Current Contract Value:
$724,646
Expenditures:
$724,646

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Arleen Henry Nez Perce Tribe No Administrative Contact arleenh@nezperce.org (208) 621-3833
Rebecca Johnson Nez Perce Tribe Yes Supervisor beckyj@nezperce.org (208) 621-4629
Mike Key Nez Perce Tribe No Technical Contact mikek@nezperce.org (208) 843-7300x4633
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Ed Larson Nez Perce Tribe No Interested Party edl@nezperce.org (208) 843-7320x4630
Jonathan McCloud Bonneville Power Administration Yes COR jmmccloud@bpa.gov (503) 230-3110
Bruce McLeod Nez Perce Tribe Yes Contract Manager brucem@nezperce.org (208) 843-7320x4628
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Nancy Weintraub Bonneville Power Administration No Env. Compliance Lead nhweintraub@bpa.gov (503) 230-5373


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Permits/Authorizations Acquired A: 165. Obtain Permits and submit copies to BPA NEPA group 11/01/2009 11/01/2009
Acclimation and fish release B: 56. Fall Chinook Acclimation 12/28/2009 12/28/2009
Information efforts for the public and cooperators C: 99. Conduct outreach and public education efforts 12/31/2009 12/31/2009
Construction Upgrade Oversight D: 100. Fall Chinook Acclimation Facility: Construction Upgrade Oversight 06/30/2009 06/30/2009
Facilities and equipment maintained and secured. E: 61. Fall Chinook Acclimation Facility Maintenance 12/28/2009 12/28/2009
Coordination and Transport F: 66. Transport yearling and sub-yearling FSC 12/28/2009 07/31/2009
Coordination with all Cooperators G: 189. Fall Chinook acclimation Project Coordination 12/31/2009 12/31/2009
Attach 2008 Progress Report to PISCES H: 132. Submit Progress Report for the period 1/1/2008 to 12/31/2008 12/31/2009
Manage project in accordance with Nez Perce Tribe and BPA requirements. I: 119. Manage and Administer Fall Chinook Acclimation Project 12/28/2009 12/28/2009

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 66 Trap/Collect/Hold/Transport Fish - Hatchery
  • 1 instance of WE 56 Acclimate Juvenile Fish
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Obtain Permits and submit copies to BPA NEPA group 02/09/2007
B 56 Fall Chinook Acclimation 07/02/2008
C 99 Conduct outreach and public education efforts 02/09/2007
D 100 Fall Chinook Acclimation Facility: Construction Upgrade Oversight 02/09/2007
E 61 Fall Chinook Acclimation Facility Maintenance 07/02/2008
F 66 Transport yearling and sub-yearling FSC 07/02/2008
G 189 Fall Chinook acclimation Project Coordination 02/09/2007
H 132 Submit Progress Report for the period 1/1/2008 to 12/31/2008 02/09/2007
I 119 Manage and Administer Fall Chinook Acclimation Project 02/09/2007
J 185 Periodic Status Reports for BPA 02/09/2007